Line Tightness and Leak Detector Testing Petro-Tite Line Tightness Tester July 15, 2015 Chattanooga, Tennessee

pressurized piping LLD testing chattanooga 2015

Embed Size (px)

Citation preview

Page 1: pressurized piping LLD testing chattanooga 2015

Line Tightness and Leak Detector Testing

Petro-Tite Line Tightness TesterJuly 15, 2015

Chattanooga, Tennessee

Page 2: pressurized piping LLD testing chattanooga 2015

Line Tightness Test RequirementsTennessee UST Regulations

•Must detect 0.1 GPH release at 1 ½ times operating pressure

•Required by rule at installation; Rule 400-18-01-.02(1)(d)6.

•Results must be maintained until next test; Rule 400-18-01-.04(5)(b)

•Required annually for pressurized piping; Rule 400-18-01-.04(2)(b)1.

– Unless site is using monthly monitoring (interstitial monitoring, SIR, electronic LLD)

Page 3: pressurized piping LLD testing chattanooga 2015

Terminology- Pressurized Piping

• Full Pump Pressure• LLD Holding Pressure• LLD Metering Pressure• LLD Opening Time• Maximum Allowable Bleedback• Leak Rate in Gallons per Hour

Page 4: pressurized piping LLD testing chattanooga 2015

Submersible Pump

Page 5: pressurized piping LLD testing chattanooga 2015

Terminology- Continued

Page 6: pressurized piping LLD testing chattanooga 2015

Shear Valve

• Safety Device

• Test port• Properly

Anchored

Page 7: pressurized piping LLD testing chattanooga 2015

Petro-Tite Line Tightness Tester

Page 8: pressurized piping LLD testing chattanooga 2015

Petro-Tite Line Tightness Tester

High Pressure Gauge

0-160 PSI

Rarely needs to exceed 75 PSI for petroleum applications

Page 9: pressurized piping LLD testing chattanooga 2015

Petro-Tite Line Tightness Tester

Volumetric Burette

Graduated in mL and gallons

0.1 gallon capacity

DO NOT OVERFILL

Page 10: pressurized piping LLD testing chattanooga 2015

Purpora Engineering

“Silver Bullet”Hoke Valve- controls flow ON/OFF

Needle Valve- fine adjustTest AdaptorAir EliminatorHydraulic Hose

Page 11: pressurized piping LLD testing chattanooga 2015

Other Testing Systems

Estabrook EZ CHEK

•Uses nitrogen gas•Can test multiple lines

Page 12: pressurized piping LLD testing chattanooga 2015

Acurite Line Tester

Page 13: pressurized piping LLD testing chattanooga 2015

Tanknology TLD-1Tanknology TLD-1

Used only by Tanknology technicians

Uses Nitrogen gas

Page 14: pressurized piping LLD testing chattanooga 2015

Preparing to Test Site Safety Meeting Deactivate sub pump (SAFETY

FIRST) Connect to line- shear valve at

furthest dispenser No ball valve- use “silver bullet”

Page 15: pressurized piping LLD testing chattanooga 2015

Site Safety

STP relay stuck in ON position

ALWAYS DEACTIVATE STP at the electrical panel !

Page 16: pressurized piping LLD testing chattanooga 2015

Site Safety cont.• STP Sumps >4 feet deep (ingress)• Gasoline Vapors- flammable AND

TOXIC• Displaced oxygen• Motor Vehicles/Pedestrians• Cones/Barricades• PPE- Gloves, vest, glasses, boots• Partner always recommended

Page 17: pressurized piping LLD testing chattanooga 2015

Preparing to Test• REMOVE LEAK DETECTOR and

connect at the STP when :– No in-line ball valve present at STP– Confirming STP leaking into tank (o-

rings, check valve or functional element)– Testing large or long flex lines – Bad fittings at shear valve

Page 18: pressurized piping LLD testing chattanooga 2015

Common Line Testing Problems

• Bad Functional Element- leaks into tank• NO BALL VALVE- must test at the tank.• Satellite Dispensers• Air/Vapor Pockets• Piping Deflection (flex pipe)• Liquid/Vapors in STP sump

Page 19: pressurized piping LLD testing chattanooga 2015

Example 1- Temperature Change

o Large Pressure Changeso Small Volume Changeso Diminishes to “0” PSI

o SOLUTION- obtain 2-3 readings w/no change; can be prevented by purging line prior to test.

Time (Military)

Event Description Pressure (psi) Volume (gallons)Comments/Actions

(List leaks observed even if repairs are made and retest passes)    Before After Before After Net Change  

0800 Begin Line Test   50        0815   21 50 .0850 .0810 -.0040  0830   30 50 .0810 .0780 -.0030  0845   37 50 .0780 .0755 -.0025  0900   42 50 .0755 .0735 -.0020  0915   45 50 .0735 .0720 -.0015  0930   47 50 .0720 .0710 -.0010  0945   49 50 .0710 .0705 -.0005  1000   50 50 .0705 .0705 .0000  

                              

Page 20: pressurized piping LLD testing chattanooga 2015

Example 2- Pipe DeflectionTime

(Military)Event Description Pressure (psi) Volume (gallons)

Comments/Actions

(List leaks observed even if repairs are made and retest passes)    Before After Before After Net Change  

0940 Begin Line Test   50        0950   43 50 .0655 .0610 -.0045  1000   46 50 .0610 .0570 -.0040  1010   48 50 .0570 .0535 -.0035  1020   49 50 .0535 .0515 -.0020  1030   49.5 50 .0515 .0500 -.0015  1040   49.8 50 .0500 .0490 -.0010  1050   49.9 50 .0490 .0485 -.0005  1100   50 50 .0485 .0485 .0000  

                              

o Small Pressure Losseso Small Volume Losseso Diminishes to “0” PSIo Gradual volume changes; 30 minutes-1 hours

o Solution: Conduct Beginning Bleedback Test and stretch line prior to test

Page 21: pressurized piping LLD testing chattanooga 2015

Example 3- Air/Vapor PocketTime

(Military)Event Description Pressure (psi) Volume (gallons)

Comments/Actions

(List leaks observed even if repairs are made and retest passes)    Before After Before After Net Change  

1400 Begin Line Test   50        1405   46 50 .0910 .0260 -.0065 Re-filled burette1410   45 50 .0860 .0410 -.0041 Re-filled burette1415   46.5 50 .0770 .0070 -.0070 Re-filled burette1420   46.0 50 .0850 .0300 -.055 Re-filled burette

                                                            

                              

o Small Pressure Changeso Very Large Volume Changeso Non-repeating and inconsistent

SOLUTION: End test and purge air from line; locate any potential points of air (siphon lines, low points in product line, dead ends)

Page 22: pressurized piping LLD testing chattanooga 2015

Example 4- High Rate of Leak

Time (Military)

Event Description Pressure (psi) Volume (gallons)Comments/Actions

(List leaks observed even if repairs are made and retest passes)    Before After Before After Net Change  

1315 Begin Line Test   50        1320   15 50 .0750 .0200 -.0045 Re-filled burette1325   17 50 .0830 .0260 -.0040 Re-filled burette1330   14 50 .0910 .0330 -.0035 Re-filled burette1335   16 50 .0780 .0220 -.0020 Re-filled burette1340   15 50 .0870 .0320 -.0015 Re-filled burette

                                             

                              

o Large Pressure Losseso Large Volume Losseso Repeated and Consistent Losses over timeo May have to speed up readings, rapid pressure

changes for large leaks

Page 23: pressurized piping LLD testing chattanooga 2015

Testing Mechanical Leak Detectors

Page 24: pressurized piping LLD testing chattanooga 2015

Mechanical Line Leak Detectors (MLLD)

Invented in 1958 by Elmer Deter, Red Jacket Application Engineer

Alerts operator of nozzle to lowline pressure

Page 25: pressurized piping LLD testing chattanooga 2015

MLLD Operation

Page 26: pressurized piping LLD testing chattanooga 2015
Page 27: pressurized piping LLD testing chattanooga 2015
Page 28: pressurized piping LLD testing chattanooga 2015

Electronic Line Leak Detectors (ELLD)

• Tests line during idle time• Must simulate a 3.0 GPH leak to test• Programming must be verified

– Pressure based (Veeder-Root PLLD)– Flow based (Franklin/OPW)

Page 29: pressurized piping LLD testing chattanooga 2015

ELLD Testing • Activates STP

during idle to conduct testing

• Secondary containment may be required

Page 30: pressurized piping LLD testing chattanooga 2015

ELLD Operability

Page 31: pressurized piping LLD testing chattanooga 2015

Simulating a Leak

Page 32: pressurized piping LLD testing chattanooga 2015

Petro-Tite LLD Test1) Connect pressure regulator2) Energize STP, adjust pressure to 10 PSI3) Adjust Petro-Tite flow rate to 189 ml/min (3 gallons per hour)- black hoke valve4) De-energize STP5) Remove regulator and connect piping to Petro-Tite system

Page 33: pressurized piping LLD testing chattanooga 2015

Petro-Tite LLD Test

5) Reactivate STP; MLLD should stay in leak test mode (1 gal/minute)

6) Keep STP running and close 3-way valve; MLLD should close, full flow.