Printed copies of this manual are Uncontrolled
Hardy Machine & Design, Inc.
5737 Windfern
Houston, Texas 77041
QUALITY CONTROL MANUAL
ASME U STAMP
FOR
PRESSURE VESSELS
MASTER COPY
February 23, 2004
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 1 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
REVISION SHEET
REV DATE DESCRIPTION BY CHECKED
Q.A.M Approved By: ____________________ Date: ____________________
A.I. Accepted By: ____________________ Date: ____________________
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 2 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
Table of Contents
1. GLOSSARY .................................................................................................................................. 3
2. STATEMENT OF POLICY AND AUTHORITY ..................................................................... 7
3. MANUAL CONTROL ................................................................................................................. 8
4. DRAWING, DESIGN CALCULATIONS AND SPECIFICATION ........................................ 9
5. MATERIALS CONTROL ........................................................................................................ 12
6. EXAMINATION AND INSPECTION PROGRAM ............................................................... 14
7. CORRECTION OF NONCONFORMITIES .......................................................................... 18
8. WELDING CONTROL ............................................................................................................. 20
9. NON DESTRUCTIVE EXAMINATION - NDE ..................................................................... 25
10. POSTWELD HEAT TREATMENT ........................................................................................ 27 28
11. CALIBRATION OF MEASUREMENT AND TEST EQUIPMENT .................................... 29
12. RECORDS RETENTION ......................................................................................................... 30
13. AUTHORIZED INSPECTOR .................................................................................................. 31
14. ANNUAL AUDIT ....................................................................................................................... 33
15. CONTROL OF CODE STAMP ................................................................................................ 34
16. ORGANIZATIONAL CHART ................................................................................................. 35
17. NATIONAL BOARD OF REGISTRATION ........................................................................... 36
18. EXHIBITS .................................................................................................................................. 37
Q.A.M Approved By: ____________________ Date: ____________________
REV.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 3 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
A.I. Accepted By: ____________________ Date: ____________________
1. GLOSSARY
As used in the quality Control Manual, the following terms and abbreviations are defined:
AI
Authorized Inspector from the ASME accredited Authorized Inspection Agency for Code
items.
Approve
Signature/initials including date of acceptance as being in compliance with Code and
Client Requirements.
ASME
American Society of Mechanical Engineers
ASNT
American Society for Nondestructive Testing
Code
The Applicable Codes and Standards to which work is being performed. This may be the
ASME Boiler and Pressure Vessel Code, Sections I, V, VIII DIV. 1 and IX and associated
ANSI Standards or Local Jurisdictional codes also National Board requirements.
Client
The contract requirements supplied by the Client to which Hardy Machine & Design is
responsible for compliance. Client Requirements may include design specifications or
drawings or applicable data from specifications as necessary for Hardy Machine & Design
to perform fabrication and installation in compliance with the Code(s).
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 4 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
Customer/Client
The organization that has instructed, by Contract, that Hardy Machine & Design furnishes
fabrication services. Also applies to designees or representatives of the customer.
Data Report
Appropriate Code Form completed by the fabricator certifying Code compliance and
certified by Authorized inspector.
Department
When department is specified, it shall be interpreted as being the manager of that
department's responsibility or his designated representative.
Design
The basic owner document including specifications, drawings and calculations, which are
required.
Document
A drawing, calculation, specification, procedure, instruction or other controlled printed
information.
Documentation
Any form, record, or drawing that contributes to traceability or verification.
Example Forms
Attachments to this manual for "as-is" use or modification to project forms.
Items
Material, parts, sub-assemblies, components or services.
Manual
This Quality Control Manual.
MT
Magnetic Particle Examination (a form of NDE)
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 5 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
NBIC
National Board Inspection Code
NDE
Nondestructive Examination - A method of indicating flaws in material or parts without
altering effective use of the material or parts. Examples are: RT, UT, MT, PT, VT.
PT
Liquid Penetrant Examination (a form of NDE)
Project Document
A document prepared for a specific project either totally or by modification of a generic
document.
Q.A.M.
Quality Assurance Manager
Q.C.
Quality Control
QCSM
Quality Control System Manual
Repair
Process of restoring a nonconforming characteristic to a condition so that the capability of
an item to function reliably and safely is unimpaired, even though that item still may not
conform to the original requirement. However, in all cases, it must conform to the Code as
required.
Rework
Process by which a nonconforming item is made to conform to a prior specified
requirements by completion, re-machining, reassembling, or other corrective means.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 6 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
RT
Radiographic Examination (a form of NDE)
SNT-TC-1A
ASNT Recommended Practice SNT-TC-1A Code Accepted Condition
UT
Ultrasonic Examination (a form of NDE)
Vendor
A material manufacturer, material supplier, or subcontractor providing services.
WPS
Welding Procedure Specification
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 7 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
2. STATEMENT OF POLICY AND AUTHORITY
2.1. This Quality Manual documents the quality system for manufacturing, fabricating and
assembling of pressure vessels by Hardy Machine & Design which will meet all the
requirements of the AMERICAN SOCIETY OF MECHANICAL ENGINEERS Boiler &
Pressure Vessel Code Section VIII, Division 1.
2.2. Hardy Machine & Design management is totally committed to the execution of the
procedures established in this Quality Assurance System and in complete compliance with
A.S.M.E. Boiler & Pressure Vessel Code Section VIII, Division 1.
2.3. The Quality Assurance Manager of Hardy Machine & Design is delegated with authority
and responsibility to establish, maintain, administer and audit this Quality Assurance
System. It is his responsibility to formally report the findings, advise regarding corrective
action and monitor that the proposed corrective action has been effectively implemented.
2.4. If during the implementation, conflicts arise regarding Code compliance between the
Quality Assurance Manager and other departments, it will be resolved by the Manager and
will not negate the Code rules.
2.5. The Quality Assurance Manager at Hardy Machine & Design is responsible for
implementing this Quality Assurance System.
2.6. This Quality Manual will be printed and distributed only in the English language.
_____________________________
Ravi Goel
President, Hardy Machine & Design
Date: ________________________
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 8 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
3. MANUAL CONTROL
3.1. This Quality Manual has been prepared by Hardy Machine & Design. The Quality
Assurance Manager is responsible for the Manual's compliance with the current A.S.M.E.
Code. The Quality Assurance Manager is responsible for the initial issue of this Manual
and any subsequent revisions.
3.2. Revisions are approved by the Quality Assurance Manager and submitted to the Authorized
Inspector for review and acceptance, prior to inclusion into the Manual and subsequent
implementation. The Quality Assurance Manager and the Authorized Inspector will
document their approval and acceptance on the Table of Contents. This Manual shall not
be revised to meet client requirements. Client specifications shall be addressed via an
addendum outside the scope of this Manual. Whenever revisions are made, the part of the
manual that is being revised will be identified by the symbol < > adjacent to the paragraph
revised at the left-hand margin.
3.3. A controlled copy of the Quality Manual is available for the Authorized Inspector at the
Shop.
3.4. The Quality Assurance Manager will issue controlled and uncontrolled copies of the
Manual in accordance with the list of Manual holders maintained by him as per exhibit
number 1 (QCSM DISTRIBUTION LOG). Each Manual will bear the same control
number on its title page as is shown on the list. Only controlled copies shall be issued
within the Hardy Machine & Design organization.
3.5. No part of this Manual may be reproduced or transmitted in any form or by any means
including photocopying and recording without the written permission of Hardy Machine &
Design.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 9 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
3.6. The Quality Assurance Manager will review Code addenda to determine if this Quality
Manual is affected. Required revision will be made and implemented within six months of
the addenda issue date and maintained in the QCSM Revision Log as per exhibit number 2.
4. DRAWING, DESIGN CALCULATIONS AND SPECIFICATION
4.1. Document Distribution (Pre-fabrication)
4.1.1. Upon being awarded the project, the Project Manager obtains a unique project job
number. The Project manager will then notify the Design Engineer, and all others in
operations the identity of the job number.
4.1.2. The Design Engineer is responsible for the distribution of all documents relative to the
project as per exhibit number 3 (DRAWING TRANSMITTAL FORM).
4.1.2.1. Client data sheet(s), drawing(s), and specification(s) shall be distributed to the Design
Engineer, QA/QC Department and Shop to begin job preparation.
4.1.2.2. The Design Engineer is responsible for issuing the latest revision(s), addendum (a) or
change(s) of the specifications and drawings to all defined document holders.
4.2. Drawing & Design Calculation Approval
4.2.1. The Design Engineer is responsible for the approval process of all drawings and
calculations as specified herein.
4.2.1.1. The Design Engineer upon receipt of the client documents, begins preparation of the
Design Calculations and drawings material list.
The drawings shall include all data, informations and details required by the ASME
Code as follows:
1) The applicable Code edition and addenda.
2) Identification Number
3) Bill of Materials as per exhibit number 4 with ASME material specification including
nominal size, grade/type, classification number and special material requirements, if
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 10 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
any, NDE or impact test requirements.
4) Dimensions and Tolerances
5) Weld joint configurations and/or symbols.
6) Hydrostatic/Pneumatic Test Pressure.
7) Reference to applicable approved procedure (WPS).
8) Minimum Design Metal Temperature.
4.2.1.2. One (1) set of documents are transmitted by the Design Engineer to the Client and
Authorized Inspector for review and comments.
4.2.1.2.1. The Design Engineer shall be responsible for pursuing a timely response to the
documents from all parties. Any comments shall be evaluated prior to being
incorporated into the design documents or drawings.
4.2.1.2.2. Upon incorporation of comments all documents shall be returned back to all parties
with final revision.
4.2.2. The "original" documents are returned to the Design Engineer and shall be stamped or
marked "Approved for Construction" on each drawing. A reproducible copy will be
transmitted to the Project Manager for Official distribution and retention.
4.3. Distribution & Revision of Drawings & Design Calculations
4.3.1. The Design Engineer is responsible for the distribution of drawing and/or revisions.
4.3.1.1. If during fabrication, changes to the drawing(s) are required, the proposed revision shall
be reviewed by the Design Engineer, who will submit for review to the client for
approval.
4.3.1.1.1. After the client approval of the revised drawings, the drawing(s) shall reflect the
changes and revision(s) and shall be noted in the revision blocks provided on drawing.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 11 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
4.3.1.1.2. Design calculations to support the revision (change or alteration of Design) may be
required. The Design Engineer shall provide the calculations required.
4.3.2. Standard and Computer Aided Designs:
4.3.2.1. When standard or computer-aided design calculations and drawings are used, the Design
Engineer is responsible for the input of correct design data and the verification that the
correct output has been obtained.
4.3.2.2. The Design Engineer will review Code addenda to determine if standard designs or
programs are affected. Required revisions will be made and implemented within six
months of the addenda issue date.
4.3.2.3. All revisions are documented, signed by the Design Engineer and recorded on each
affected document or in computer program documentation.
4.3.2.4. Standard and computer-aided drawings and calculations output is available for review
and acceptance by the AI. The Design Engineer provides the AI with any manual
calculations he requests to verify computer output.
4.3.3. Design Calculations shall be prepared and issued by the Design Engineer.
4.3.3.1. The design calculation shall be completed by the Design Engineer.
4.3.3.2. He shall also be responsible for the calculations and drawings, control of the changes
and dated record of the changes.
4.3.3.3. Design calculations that require revisions shall be performed and/or verified by the
Design Engineer.
4.3.4. The Design Engineer prepares a Bill Of Materials as per exhibit number 4 for the entire
job based on the approved drawings.
4.3.4.1. The Bill Of Materials is distributed along with contract drawings and design
calculations.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 12 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
4.3.4.2. As contract drawings are revised, so shall the Bill Of Materials to reflect such changes.
4.3.4.3. The Bill Of Materials shall specify Code materials in accordance with ASME Section
VIII Division 1 and ASME Section II specifications to the required edition and
addendum or identical ASTM specifications per Appendix A in Section II.
5. MATERIALS CONTROL
5.1. The Project Manager is responsible for obtaining Code materials as specified on the Bill Of
Materials as per exhibit number 4 and for all materials. Welding materials may be ordered
verbal or by use of a Purchase Order Exhibit 5
5.2. The Project Manager will first source from stock inventory meeting ASME Code
Specifications.
5.2.1. Code materials available in stock inventory shall be identified and their mill certificates
retrieved.
5.2.2. Code materials determined acceptable and in conformance to Code requirements shall be
identified with green mark. Materials not in conformance to Code requirements shall be
identified with red mark.
5.3. Preparations of material Purchase Order as per exhibit number 5 based on the material lists
are the responsibility of the Project Manager.
5.3.1. Completed Purchase Order is reviewed for Code compliance by and updated with any
required corrections. It is then signed and dated.
5.3.2. The Project Manager will approve the Purchase Order.
5.4. The Project Manager is responsible for purchasing all materials, consumables and supplies
in accordance with specifications. Any special ordering information must be noted on the
Purchase order such as UCS-79(d), UG-80 on request for mill test reports.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 13 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
5.4.1. A copy of the Purchase Order with suppliers documentation shall be sent to the QC
Department for review.
5.5. Free issue material or customer supplied material must meet all Code requirements of
ASME Section II and Section VIII, Division 1. Received material shall be documented on
the Material Examination Report as per exhibit number 6.
5.6. The QC Inspector is responsible for the inspection and verification of all materials
including consumables received and/or issued to be in accordance with Code compliance.
5.6.1. All materials are inspected visually, dimensionally and readily traceable to the mill
certificates. The QC Inspector shall inspect and verify for conformance to the
requirements. Material received and inspected shall be transferred to shop with all
original receiving and inspection reports. All original records of vessel material shall be
kept by shop. Mill test report review and acceptance will be documented by initial and
date of the QC Inspector on the mill test report.
5.6.2. A copy of all documentation is retained in a job file for reference fabrication.
5.6.3. Substitution of material shall only be made with the review and approval of the Client,
Design Engineer and Authorized Inspector.
5.7. Material traceability shall be verified and recorded by the QC Inspector.
5.7.1. Prior to cutting Code material, the material traceability number shall be transferred to
each pre-determined piece to maintain traceability to cutting.
5.7.2. All drop-off materials shall be positively identified.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 14 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
6. EXAMINATION AND INSPECTION PROGRAM
6.1. Vessel Fabrication Stage Inspection
6.1.1. The Examination and Inspection of ASME Code Pressure Vessels is the responsibility of
the QC department.
6.1.2. Stage Inspection of pressure vessels is controlled by means of a Inspection Traveler
Sheets as per exhibit number 7 prepared from the shop drawings by the QC Inspector who
shall assign his QC Inspection points, Hold (H), Witness (W), Review (R) or Monitor
(M) points and sign and date the quality plan. The QC Inspector shall submit the
Inspection Traveler Sheet to the AI prior to fabrication for his designation of inspection
points. AI inspection points shall be noted by *.
6.1.3. The Shop Foreman shall review the sequence of the activities provided on the Traveler
Sheet. The sequence includes examination and inspection activities.
6.1.4. When fabrication is complete, the QC Inspector shall perform his final inspection. If
acceptable, he shall signify his approval by initialing and dating the Inspection Traveler
Sheet when he has ascertained that all Code requirements have been met and shall submit
to the Authorized Inspector and Client for approval.
When a pressure vessel is not provided with an opening or other means of access to
inspect internal surfaces, an inspection point for the QC Inspector, client and AI will be
shown to permit internal inspection before starting final closure weld or bolted joint.
6.2. Pressure Testing
6.2.1. Pneumatic tests as prescribed in this paragraph may be used in lieu of hydrostatic testing
or when specified, except when the Code requires hydrostatic testing.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 15 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
6.2.1.1. The QC Inspector and Authorized inspector/Client shall witness the test. They shall
affix their initials and date onto the test chart.
6.2.1.2. The test pressure for pneumatic testing shall be 1.25 times the Maximum Allowable
Working Pressure (MAWP).
6.2.1.3. The pressure shall be gradually increased to not more than half of the test pressure (1.25
X MAWP). Thereafter, the pressure shall be increased in step one-tenth up to the test
pressure.
6.2.1.4. Then the pressure shall be reduced to four-fifths of the test pressure and held for
sufficient time to permit inspection.
6.2.1.5. When accepted, the QC Inspector/Client and Authorized Inspector shall sign and date
the Pneumatic Test Record.
6.2.2. Hydrostatic tests will be conducted as per ASME Code Requirements. The gauge should
be rated over a range twice the intended test pressure but in no case less than 1-1/2 the
test pressure or more than 4 times the test pressure.
6.2.2.1. The temperature of the water shall be maintained as per Code requirements.
6.2.2.1.1. For Section VIII, Division 1 vessels, they shall be subjected to a hydrostatic test
pressure which at every point in the vessel is at least equal to 1-1/2 times the
maximum allowable working pressure to be marked on the vessel multiplied by the
lowest ratio (for the materials of which the vessel is constructed) of the stress value S
for the test temperature on the vessel to the stress value S for the design temperature.
All loading that may exist during this test shall be given consideration.
6.2.2.1.2. It is recommended that the test pressure shall not be applied until the vessel and its
contents are at about the same temperature. If the test temperature exceeds 120
degrees F, it is recommended that inspection of the vessel be delayed until the
temperature is reduced to 120 degrees F or less.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 16 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
6.2.2.2. The QC Inspector/Client shall affix his initials and date onto the test chart.
6.2.2.3. The test pressure for hydrostatic testing shall be at least equal to 1.5 times the Maximum
Allowable Working Pressure (MAWP).
6.2.2.4. After successful application of the test pressure, it is reduced to two-thirds for a close
examination of all welds.
6.2.2.5. When accepted, the QC Inspector and Authorized Inspector/Client shall sign and date
the Inspection Traveler Sheet.
6.3. Data Reports
6.3.1. Upon completion of a vessel the applicable Manufacturer's Data Report shall be prepared
as completed from the final records by the QA Manager.
6.3.2. The completed Manufacturer's Data Report, together with the final records, shall be
presented to the Authorized Inspector for his review. When he is satisfied that all Code
requirements have been met as per the Code, he will sign and date the Manufacturer's
Data Report.
6.3.3. The Authorized Inspector shall verify the application of the Code Symbol U-Stamp to the
nameplate.
6.3.4. The National Board serial numbers shall be controlled and issued by the Q.A.M.
6.3.4.1. A record of issuance shall be kept showing date issued, type of vessel to be used upon,
and manufacturer's serial number and date sent to the National Board.
6.3.4.2. All pressure vessels meeting all Code requirements of the Code shall be stamped with
the ASME Code Stamp.
6.3.4.3. The Project Manager shall submit to the National Board the original and one legible
copy of all Manufacturer's Data Reports required for the stamped vessel (See Section
18).
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 17 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
6.3.5. All documentation shall be retained on file.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 18 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
7. CORRECTION OF NONCONFORMITIES
This section describes the methods used to control and resolve nonconforming conditions
found in material, fabrication, documentation or construction.
7.1. Definition
Nonconformance - is a deficiency in characteristic, documentation or procedure which
renders the quality of an item unacceptable or indeterminate and not in compliance with the
ASME Code and this Manual.
7.2. Responsibility
All personnel have the responsibility to report any non-conforming conditions, which
they have knowledge of.
7.2.1. It is the QC Inspector's responsibility to initiate and issue the Non-Conformance Report
as per exhibit 8.
7.2.2. The QC Inspector shall prescribe a recommended corrective action.
7.3. Procedures
Deviations will be handled by the QC Inspector.
7.3.1. When nonconformity is found, if it cannot be immediately resolved by the QC Inspector,
it shall be identified.
7.3.2. A Non-Conformance Report shall be prepared for non conforming items by the QC
Inspector
7.3.3. Copies of the Non-Conformance Report are issued to the Addressee, Authorized
Inspector, Project Manager Client and Shop Foreman. The original shall be retained in
the Job File. In case of repair to the base material, the Authorized Inspector/Client will
be notified for his concurrence and designation of his 'hold' points. All use as is
dispositions shall be notified to the AI prior to implementation.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 19 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
7.3.4. The Project Manager shall be responsible for the final rectification of the
nonconformance. When corrective action has been completed/accepted by the QC
Inspector and AI, the QC Inspector and AI shall sign and date.
7.3.5. The QC inspector shall verify that the corrective action taken has satisfactorily restored
the condition to within compliance of the Code.
7.3.5.1. Satisfactory results shall be documented by the Project Manager. Copies shall be
distributed and the original retained in the file.
7.3.5.2. Unsatisfactory results that have been ineffective in correcting the non-conformance shall
be re-addressed by issuing a revised Non-Conformance Report.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 20 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
8. WELDING CONTROL
8.1. General
8.1.1. All welding on Code vessels shall comply with a written Welding Procedure
Specification (WPS) in accordance with ASME Section IX.
All welding on Code vessels shall be performed by qualified welders and/or operators in
accordance with ASME Section IX.
8.1.2. Welder(s) and Welding Operator(s) are qualified and certified to the essential variables by
the Project Manager.
8.2. Project Planning (Pre-Fabrication)
8.2.1. When documents are received from the Design Engineer, the Project Manager reviews
the drawings and specifications from which he prescribes appropriate Welding Procedure
Specification (WPS) and Welder Qualifications for the Project.
8.2.2. Welding Procedure Specification(s) (WPS) shall be sourced from the Design Engineer
files to meet project requirements. Should project requirements fall outside the limits of
the variables expressed in the Welding Procedure Specification, a new Procedure will be
required to meet these requirements. However, if only nonessential variables are
changed, then the WPS can be revised to reflect that change.
8.2.3. Only qualified welders will be used for welding of Code items.
8.2.4. Copies of the applicable Welding Procedure Specification(s) (WPS), and Welder's
certificate shall be submitted to client through Project Management. These documents
will be available for review to the Authorized Inspector at all times.
8.3. Qualification of Welding Procedures
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 21 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
8.3.1. The Project Manager is responsible for conducting the qualification of procedures and
certifying the procedure qualification record.
8.3.2. Materials and Consumables required are sourced as per engineering requirement.
8.3.3. Qualification and documentation of the welding procedure shall be in accordance with
ASME IX.
8.3.4. WPS shall be submitted to the A.I. upon request. The AI may require re-qualification of
welders or procedures for just cause.
8.4. Welder and Welding Operator Renewal
8.4.1. The Project Manager will have ultimate responsibility for the maintenance of welders and
welding operator's qualification. Qualified welders and operators continuity is
documented on the Welders Performance Record Exhibit #9.
8.4.2. The performance qualification of a welder or welding operator shall be affected when one
of the following condition occur:
8.4.2.1. When he has not welded during a period of 6 months or more using a specific process.
8.4.2.2. When there is a specific reason to question his ability to make welds that meet the
specification, the qualifications which support the welding he is doing shall be revoked.
All other qualifications not questioned remain in effect.
8.4.3. Adequate proof of documentation that supports the effective use of a welding process by
the welder shall renew that welders qualification for another period.
8.4.3.1. Welders that have inadequate proof of documentation or have exceeded the limits shall
require requalification.
8.5. Qualification of Welders and Welding Operators
8.5.1. The Qualification of welders shall be the responsibility of the Project Manager.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 22 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
8.5.2. Welders and welding operators are qualified by any of the two methods listed below:
test coupon
or Production test (If not GMAW Short circuiting)
8.5.3. Qualification of Welders and Welding Operators shall be in accordance with ASME IX.
8.6. Production Welding
8.6.1. The QA Manager is responsible for verifying that all production welders are qualified,
and the Shop Foreman is responsible for instructing each welder in the appropriate WPS
he shall use.
8.6.2. Each welder and welding operator shall stamp or stencil the identifying number, letter, or
symbol, assigned by the QA Manager, adjacent to and at intervals of not more than 3 ft.
along the welds which he makes in steel plates 1/4 in. and over in thickness and in
nonferrous plates 1/2 in. and over in thickness; or a record shall be kept by the QA
Manager of welders and welding operators employed on each joint which shall be
available to the Inspector. For identifying welds on vessels in which the wall thickness is
less than 1/4 in. (6mm) for steel material and less than 1/2 in. (13mm) for nonferrous
material, suitable stencil or other surface markings shall be used; or a record shall be kept
of the welders and welding operators employed on each joint by the QA Manager which
shall be available to the Authorized Inspector/Client.
8.6.3. The appropriate Welding Procedure Specification (WPS) use shall be determined by the
QA Manager after consultation with the Shop Foreman. The procedures will be noted on
the "Approved for Construction" drawings (AFC).
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 23 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
8.6.4. Tack welds shall be made in accordance with qualified procedures and welders; all tack
welds, which are not, removed, shall be feather ground and visually inspected for defects
by the Shop Foreman. Tack welds made by subcontractors shall be removed. However,
they shall be made in accordance with a qualified procedure approved by the Q.A.M.
8.6.5. Welder and Welding Operators I.D. numbers are recorded onto the Welders Performance
Record. This record is retained on file.
8.6.6. The QC Inspector shall audit the welding in compliance to the WPS.
8.7. Welding Material
8.7.1. All welding filler metals and fluxes are purchased as per requirements either verbally or
by use of a Purchase Order.
8.7.2. All welding materials are received as per requirements.
8.7.3. Welding materials are to be stored in accordance with the Code and Filler Metal
Manufacturing Recommendations.
8.7.4. It is the Shop Foremans responsibility to ensure correct Welding Consumables are used in
accordance with the applicable Welding Procedure Specification (WPS). Sufficient
quantity is issued to the welders to complete the welding job by the Shop Foreman who
then instructs the welders of the correct WPS to be used. WPS are made available to all
welders/welding operators.
8.8. Equipment Maintenance
8.8.1. All welding leads, cutting torches and other apparatus shall be kept clean and free of
unnecessary dirt, grease, moisture or any other foreign matter.
8.8.2. Welding machines shall be blown free of dust.
8.8.3. Electrode Holding and Storage Ovens shall utilize thermostats to ensure proper
temperature control.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 24 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
8.9. Authorized Inspector
8.9.1. The WPS and the Welder/Welding Operator shall be requalified when required by the AI.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 25 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
9. NON DESTRUCTIVE EXAMINATION - NDE
9.1. General
9.1.1. All NDE shall be performed by a qualified examiner or outside company, under the
direction of a written procedure, using calibrated equipment in accordance with ASME
Section V and VIII, Division 1.
9.2. Project Planning (Pre-Fabrication)
9.2.1. When documents are received from the Design Engineer, the Project Manager reviews
the drawings and specifications from which he prescribes the appropriate NDE
Procedures.
9.3. The NDE requirements of pressure vessels are noted on the fabrication drawings by the
Engineering Manager.
9.4. Non Destructive Examination (NDE) performed on the Code Vessels shall be conducted in
accordance with a written procedure certified by the Level III personnel, who shall be
qualified in accordance with written practice. SNT-TC-1A
9.4.1. All NDE reports including radiographic film shall be reviewed for Code compliance by
the QA Manager.
9.4.2. Should the examiner have any doubt, he shall consult with the QC Inspector.
9.5. Documentation & Reporting
9.5.1. The NDE As-built drawings of the Code vessels shall be maintained by the QC Inspector
for documentation purposes.
9.5.2. Any or all NDE Documentation shall be made available for review to the Authorized
Inspector/Client.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 26 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
9.5.3. All NDE Documentation shall be retained on file.
9.6. Subcontracting
9.6.1. The subcontractor is to perform all NDE testing. The QA Manager shall appoint by letter
a Level III to act on behalf of Kamgage for all NDE. The Level III shall accept this
appointment by letter.
9.6.2. The subcontractor shall submit the calibration of his equipment and procedures for QA
Manager's approval. All NDE personal shall be qualified in accordance with SNT-TC-1A
Code accepted edition.
9.6.3. Materials sent to the subcontractor's facility shall be properly identified/marked and
inspected upon return from the vendor for proper identification and damage.
9.6.4. As a minimum, a calibrated density strip and a film viewer will be available.
9.6.5. The A.I. may call for requalification of procedures or personnel for just cause.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 27 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
10. POSTWELD HEAT TREATMENT
10.1. General
10.1.1. Postweld heat treatment shall be performed in accordance with a procedure approved by
the QC Inspector. The requirements of the applicable sections of ASME Section VIII
Division 1 shall be met.
10.2. Project Planning (Pre-Fabrication)
10.2.1. Before preparing the vessel for stress relieve the final visual and dimensional checks
should be carried out. When it is found to be satisfactory, the QC Inspector shall sign the
final inspection reports and the release for stress relieve.
10.2.2. The QA Manager shall review the Postweld Heat Treatment Procedure and the Approved
for Construction (AFC) drawings to establish the vessel thermocouple assignment.
10.2.3. The QA Inspector and Shop Foreman shall review the thermocouple arrangement
drawings and mark the location on the vessel.
10.2.4. After the clamps have been welded in place in accordance with a qualified welding
procedure, the QC Inspector shall inspect the location of the clamps prior to furnace start
up to assure correct thermocouple location. Clamps shall be welded by Kamgage and
shall be of appropriate material.
10.3. Subcontracting
10.3.1. The subcontractor is to perform a postweld heat treatment operation. The QC Inspector or
the Project Manager will review the procedure with the subcontracting company
representative.
10.3.2. The subcontractor shall submit the calibration certificate of the recorder to the QA
Manager for the approval.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 28 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
10.3.3. Materials sent to the subcontractor's facilities shall be properly identified/marked and
inspected upon return from the vendor for proper identification and damage.
10.4. Documentation & Records
10.4.1. All postweld heat treatment documentation shall be signed and dated by the
subcontractor.
10.4.2. Visual inspection of the internals after PWHT shall be carried out by the QC Inspector.
10.4.3. The documentation shall be presented to the Authorized Inspector/Client for his review.
10.4.4. All documentation shall be retained on file.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 29 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
11. CALIBRATION OF MEASUREMENT AND TEST EQUIPMENT
11.1. All test equipment, including subcontractors used for verifying Code items shall be
calibrated in accordance with this section and Gauge Calibration Log maintained as per
exhibit 10.
11.2. Each item of measurement, test and examination equipment which requires calibration
shall be identified by marking with a serial number and calibration date.
11.3. The QC Inspector is responsible for ensuring that all equipment is maintained in current
calibrated condition.
11.4. Calibration may be performed by a qualified testing laboratory, having adequate standards
traceable to the National Standards or similar, and able to provide certificates of
calibration.
11.5. Mechanical Test Equipment (Laboratory) shall be calibrated in accordance with ASME SA
370.
11.6. Each calibrated item shall have a Calibration Record maintained by the QA Manager or his
designee in the calibration file.
11.7. Calibration record shall be available for review.
11.8. When instruments are found out of calibration, the QC Inspector or his designee will
remove it from the work area and arrange for its calibration or replacement.
11.9. Calibration of all measurements and test instruments are controlled. There will be
calibrations on an annual basis.
11.10. Micrometers and/or calipers shall be checked for accuracy before and after each use to a
test block of a known thickness. These verifications will not be recorded.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 30 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
12. RECORDS RETENTION
12.1. All documentation described in this manual is collated at the completion of the job, and
reviewed for completeness, prior to preparation of the Manufacturer's Data Report.
12.2. Manufacturer's Data Reports, upon certification by the QAM and AI, shall be furnished to
the user or his agent, and to the Authorized Inspector if required.
12.3. All documentation for the job shall be assembled into a Job Data Book. The original data
book will be retained by the company and copies of which will be distributed to the client.
12.4. Manufacturer Data Reports shall be retained for a minimum of five (5) years if not
registered with the National Board.
12.5. The National Board serial numbers shall be controlled and issued by the Project Manager.
All pressure vessels will be stamped with the A.S.M.E. Code Symbol Stamp upon
satisfactory completion.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 31 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
13. AUTHORIZED INSPECTOR
13.1. The Authorized Inspector is the Inspector required by Code, who is employed by an
ASME, accredited Authorized Inspection Agency.
13.2. When requested by the Authorized inspector, hold witness and review points shall be
identified on the checklist for those activities he wishes to witness and verify.
13.3. The QC Inspector is the liaison with the Authorized Inspector, and is responsible for
keeping him advised of the progress of the work.
13.4. The Authorized Inspector shall have access to and be furnished with all drawings,
calculations, specifications, procedures, repair procedures, records, test results and any
other documents as required performing his duties.
13.5. All non-conformance and corrective actions shall be submitted to the Authorized Inspector
for his review.
13.6. The QA Manager shall notify the Authorized Inspector sufficiently in advance of pressure
tests so that he may be present to witness them.
13.7. The final records, together with the completed Manufacturer's Data Report shall be
submitted to the Authorized Inspector for his review and signature. The Authorized
Inspector shall sign the Manufacturer's Data Report when he has satisfied himself that all
Code requirements have been met.
13.8. The QC Inspector shall provide a controlled copy of the Quality Manual for the Authorized
Inspector at all times.
13.9. The Authorized Inspector will review and accept all changes to the Quality manual prior to
distribution to manual holders.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 32 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
13.10. The Authorized Inspector and/or the AI's Supervisor shall have free access to all parts of
the Shops, suppliers or material manufacturers where work is being performed.
13.11. The Authorized Inspector shall be responsible for his inspection requirements as ASME
Section VIII Specifies.
13.12. The QC Inspector will provide necessary assistance to the Authorized Inspector during
the Annual Audit required by the National Board rules and regulations and ASME QAI-1.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 33 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
14. ANNUAL AUDIT
14.1. An Annual Audit of the Quality Control System may be made by an independent person
within Hardy Machine & Design, Inc., if deemed necessary by the QAM.
14.2. The Audit shall verify implementation of the entire Quality Control System and report
findings.
14.3. Audit Reports are submitted to the Quality Assurance Manager for review and copies shall
be forwarded to the affected department.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 34 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
15. CONTROL OF CODE STAMP
15.1. The Hardy Machine & Design policy is to maintain control over the Code Symbol Stamp
and to assure its proper use.
15.2. Procedures
15.2.1. The Code Symbol Stamp is controlled by the Quality Assurance Manager. All requests
for the use of the Code symbol stamp shall be made directly to the Quality Assurance
Manager.
15.2.2. The Project Manager, prior to start of work, shall obtain from the client, and prepare from
drawings and/or specifications, a list of the items or systems that will be required to be
stamped and stamping to be witnessed by the Authorized Inspector.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 35 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
16. ORGANIZATIONAL CHART
Kamgage Fabrication
Company Secretary
Design Engineers
& CAD Drafting
Estimating
Technical/Sales
QC Inspector
QA Manager
Procurement
Project Managers
NDE X-Rays
Postweld Heat-treating
Subcontractors Manager
Shop Welders
Shop Foreman
Operating Officer
President
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 36 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
17. NATIONAL BOARD OF REGISTRATION
Items that require National Board numbers shall be issued in numerical order without skips
or gaps by the QA Manager. The QA Manager shall maintain a record, which includes date
of issue, type of item and manufacturers serial number, and date sent to National Board,
which will be transmitted within 90 days of issuance.
The QA Manager shall submit to the National Board the original and one legible copy of all
Manufacturers Data Reports required for Code items. The arrangement of nameplate
marking is indicated on Exhibit #11.
Hardy Machine & Design, Inc. February 23, 2004
Quality Assurance Manual Page 37 of 47
Printed copies of this manual are Uncontrolled Rev. 1
Printed copies of this manual are Uncontrolled
18. EXHIBITS
EXHIBIT NO. 1: Q.C.S.M DISTRIBUTION LOG
EXHIBIT NO. 2: Q.C.S.M. REVISION LOG
EXHIBIT NO. 3: DRAWING TRANSMITTAL FORM
EXHIBIT NO. 4: BILL OF MATERIAL
EXHIBIT NO. 5: PURCHASE ORDER
EXHIBIT NO. 6: MATERIAL EXAMINATION REPORT
EXHIBIT NO. 7: INSPECTION TRAVELER SHEET
EXHIBIT NO. 8: NON-CONFORMANCE REPORT
EXHIBIT NO. 9: WELDERS PERFORMANCE RECORD
EXHIBIT NO. 10: GAUGE CALIBRATION LOG
EXHIBIT NO. 11: STAMPING ARRANGEMENT
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 1
Q.C.S.M DISTRIBUTION LOG
NUMBER ISSUED TO SIGNATURE TITLE DATE
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 2
Q.C.S.M. REVISION LOG
REVISON SUMMARY Q.C.M
SIGNATURE & DATE
A.I.
SIGNATURE & DATE
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 3
DRAWING TRANSMITTAL
TO: _________________________________ WORK ORDER NO: ____________________
ATTACHED ARE THE FOLLOWING:
THESE ARE TRANSMITTED FOR:
BY: _______________________________________________ DATE: __________________
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 4
BILL OF MATERIALS
DATE
BILL OF MATERIALS NO.
TO:
QTY. DESCRIPTION UNIT
WEIGHT
TOTAL
WEIGHT
UNIT
PRICE
TOTAL
PRICE
Hardy Machine & Design
5737 Windfern St.
Houston, TX 77041
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 5
PURCHASE ORDER
ISSUE DATE PURCHASE ORDER NO.
SUPPLIER: SHIP TO:
Contact Phone : Contact
Phone :
Fax : Fax :
REQD DELIVERY DATE SHIPPING METHOD TAXABLE PAYMENT TERMS SIGNATURE & DATE
YES NO
ITEM NO. DESCRIPTION QTY UNIT
WEIGHT
UNIT
PRICE
TOTAL
PRICE
TAX
TOTAL
5733 Windfern Rd.
Houston, TX 77041
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 6
MATERIAL EXAMINATION REPORT
P.O.________________________________ SHOP ORDER____________________________
ITEM NO.___________________________ DESCRIPTION___________________________
CHECK LIST
1. APPEARANCE: ______________________________________________________
2. THICKNESS: ______________________________________________________
3. DEFECTS: ______________________________________________________
4. TRACEABILITY: ______________________________________________________
5. HEAT NUMBERS: ______________________________________________________
6. MATERIAL ID: ______________________________________________________
7. DIMENSIONS: ______________________________________________________
8. MISCELLANEOUS:_____________________________________________________
MATERIAL RECEIVED BY: ________________________________ DATE: ___________
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 7-1
Job Number:__________
SECTION:
INSPECTION TRAVELERS SHEET
O.D. ________________ I.D. _______________
VESSEL ____________ PIPE ______________ CUSTOMER/INSPECTO
R Q.C. A.I.
REMARKS
*A.I. HOLD
POINTS
CALCULATIONS
SERIAL NUMBER
DRAWING NUMBER
NATIONAL BOARD NUMBER
DATA REPORT
MILL TEST REPORTS
SHELL THICKNESS
HEAD THICKNESS
FORMED SECTIONS
HEAT NUMBER, SHELL
HEAT NUMBER, HEAD
GRADE OF MATERIAL, SHELL
GRADE OF MATERIAL, HEAD
CUT EDGES
PIPE SURFACE
PLATE SURFACE
INSPECTION FITTINGS
ALIGNMENT
WELDING PROCEDURE
WELDER QUALIFICATION
WELDER SYMBOLS
PREHEAT
WELDING APPEARANCE
POST WELD HEAT TREATMENT
X-RAY, R-1, R-2, R-3, R-4
MAGNA FLUX-DYE PENETRANT
HYDRO TEST
NAME PLATE, STAMPED OR ATTACHED
TEST GAUGE NUMBER
INTERIOR OR EXTERIOR COATING
CUSTOMER ______________________________________ P.O. # __________ ITEM # _______
SHIP TO: ______________________________________________________________________________
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 7-2
JOB # CUSTOMER: DESCRIPTION:
MATERIAL IDENTIFICATION
ITEM HEAT NO. MNFR SLAB MIKE
H-
H-
RG-1
RG-2
RG-3
RG-4
RG-5
FLANGES AND COUPLINGS
MK MFG MK MATL. MK MFG MK MATL.
SPECIAL NOTES:
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 7-3
JOB # CUSTOMER: DESCRIPTION:
PART FUNCTIONS IN PROCESS FABRICATION & INSP.
& L.O. PREP FORM FIT WELD X-RAY NDE
ITEM QC AI QC AI QC AI QC AI QC AI QC AI QC AI
SPECIAL NOTES:
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 8
NONCONFORMANCE REPORTS
WORK ORDER NO: REPORT NO.
CUSTOMER:
DESCRIPTION OF NONCONFORMITY:
SIGNED: ___________________ QC INSPECTOR
RECOMMENDED DISPOSITION
USE-AS-IS REPAIR/REWORK SCRAP/RETURN TO VENDOR
SIGNATURE & TITLE:
DATE:
DISPOSITION APPROVAL:
DESIGN ENGINEER: DATE:
Q.C. MANAGER: DATE:
AUTHORIZED INSPECTOR: DATE:
DISPOSITION VERIFIED:
INSPECTED BY: DATE:
AUTHORIZED INSPECTOR REVIEW:
ACCEPTED
REJECTED
SIGNED: DATE:
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 9
WELDERS PERFORMANCE RECORD
DATE: ______________
NAME: _______________________ STAMP NO.: ________________ YEAR: ___________
CHECK THE MONTHS DURING WHICH THE WELDER WELDED UNDER THE
FOLLOWING PROCEDURE:
WPS _____________________________________
PROCESS ________________________________
JANUARY ______________ FEBRUAURY ___________ MARCH ____________
APRIL ______________ MAY ___________ JUNE ____________
JULY ______________ AUGUST ____________ SEPTEMBER ____________
OCTOBER ______________ NOVEMBER ___________ DECEMBER ___________
_____________________________
PRODUCTION MANAGER
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 10
GAUGE CALIBRATION LOG
NAME OF EQUIPMENT______ MODEL NO. _______________ SERIAL NO. ________
SIZE AND TYPE ____________ MANUFACTURER __________ ACCURACY ________
DATE ACQUIRED __________ CALIBRATION FREQUENCY ______________________
STATUS
CALIBRATED RESULTS DATE CHECKED BY DATE DUE DATE
MAINTENANCE HISTORY
Printed copies of this manual are Uncontrolled
EXHIBIT NO. 11
Stamping Requirements
Facsimile of Required Stamping for National Board Registration
Acceptable forms of National Board marking:
NATL BD. NATL BD
NATIONAL BD
NATIONAL BOARD
The size of the National Board stamping shall not be less than that required by the applicable
code of construction for the item being stamped.
National Board markings shall appear only on pressure retaining items registered with the
National Board.
* NATL BD. (National Board Serial Number)
Stamping in this area shall comply with the requirements of the applicable
construction code