Paper Report
Presenter: Jyun-Yan Li
Specification-based Compaction of Directed Tests for Functional
Validation of Pipelined Processors
Heon-Mo Koo Intel Corporation, 1900 Prairie City Road Folsom, CA 95630, USAPrabhat Mishra Computer & Information Science & Engineering ,University of Florida, Gainesville, FL 32611, USACODES+ISSS '08 Proceedings of the 6th IEEE/ACM/IFIP international conference on Hardware/Software codesign and system synthesis
2
Functional validation is a major bottleneck in microprocessor design methodology. Simulation is the widely used method for functional validation using billions of random and biased-random test programs. Although directed tests require a smaller test set compared to random tests to achieve the same functional coverage goal, there is a lack of automated techniques for directed test generation. Furthermore, the number of directed tests can still be prohibitively large.
This paper presents a methodology for specification-based coverage analysis and test generation. The primary contribution of this paper is a compaction technique that can drastically reduce the required number of directed test programs to achieve a coverage goal. Our experimental results using a MIPS processor and an industrial processor (e500) demonstrate more than 90% reduction in number of directed tests without sacrificing the functional coverage goal.
Abstract
3
Random and biased-random test program generation is widely used
Simulation-based validation in the design cycle Directed test generation has shorter tests in the same coverage
Directed test still large Multiple pipeline interactions reaches the target functional Test generation after compact This paper present FSM directed test generation
What is the Problem
4
Related workFSM model
[2, 20]
Abstraction FSM model[3, 8, 13,15,
17]
Model checker[10, 11]
Produce test program
Static Test compaction
Architecture Description Language
(ADL)[12]
Specification-based Compaction of Directed Tests for Functional Validation of Pipelined ProcessorsThis
paper:
Remove unreachable &
redundant state
Complex FSM models, state explosion problem
Generated from the abstract FSM
Define processor’s
functionalities
Reduce unnecessary
state
5
FSM modeling of pipelined processor Remove unreachable states Remove illegal transitions Remove redundancy state Test generation
Proposal method outline
6
Modeling of FSM state Total number of state =
Modeling of FSM transition
Pipeline processor FSM model
Processor’s state Sk :
SS1 SS2 SSU
N bits
stall
stall
7
Identifying unreachable states Pass instruction to either EX1 or EX2
State: xx0100xx or xx0001xx ,not xx0101xx
Compaction of FSM model
ID
EX1
EX2
EX1
EX2
Idle 00
Normal op. 01
Stall 10
Exception 11
8
Table 1 State: xx0001xx -> xx0101xx , not xx0001xx
Table 2 State: xx01xx -> xx00xx or xx01xx or xx11xx , not xx10xx
Table 3 State: xx11xxxx -> xx0000xx
Identifying illegal stage transitions
IDEXE
ID EXE
normal
normal
ID
normal
normal
ID EXE
exceptionidleIDEX
Eidle
Idle 00
Normal op. 01
Stall 10
Exception 11
9
Inevitable state Only one state in the next state list
Example。State: xx11xx -> xx00xx 。No need state : xx01xx, xx10xx
Identify redundancy
MEM
exception
idle
Idle 00
Normal op. 01
Stall 10
Exception 11
10
Coverage-driven test selection StateCovered flag
。Initial = 0 TransitionCovered flag
。Initial = 0
Test generation
ID
idle
oper
stall
IF
IALU
SC
SC
SC
ns
TC
TC
ps
…
…
…
=0
=0
=0
=0
=0
=1
=1SC StateCovered flag
TC TransitionCovered flag
ps Previous state
ns Next state
11
Multi-exception at clock cycle 7 overflow exception in IALU divide by zero exception in DIV memory exception in the MEM
Directed test generation [10]
Original property
Negated property
Decomposed into 3 sub-properties
Input source
Test program
12
17 function units WB: 2 states IALU, DIV: 4 states Else: 3 states Total possible states =
Test compaction results for MIPS processor
Experimental result of MIPS
Remove unreachable state
Remove illegal state & redundancy
(87.2+376.3−16.9)/(87.2+376.3)
13
Functional test compaction technique to reduce test program and achieve functional coverage
3 methods for compaction Identifying unreachable states Identifying illegal stage transitions Identifying inevitable state
My comment A idea for functional verification by the state FSM How to select test program to achieve 100% state and
transition coverage
Conclusion