Presented by Members:Tom Botello - Southern California Edison
Terry Baker - Platte River Power Authority
Reliability Coordination Task ForceReport to Finance and Audit Committee
December 5, 2012
2
• FAC Assignment• Summary of the Issue/Finding/Conclusions• Real-time Operations• Operations Support• Western Interconnection Synchrophasor
Program (WISP)• Compliance• Training• Recommendations
Report Agenda
3
• Terry Baker• Tom Botello• John Cupparo• Graham Edwards• John Meyer
Reliability Coordination Task Force (RCTF) Members
4
• July 18 Kick-off meeting in Portland, Oregon• August 15 In-person meeting in Denver• August 24 Meeting by Webinar• October 22 In-person meeting at the Vancouver
RC• November 20 Meeting by Webinar• November 23 Meeting by Webinar• November 27 Meeting by Webinar• December 4 In-person meeting in Salt Lake City
RCTF 2012 Working Sessions
5
• RCTF to examine the following: o Original scope of RC duties and expenseso Current scope of duties including expanded
duties since 2009o Future scope of duties and expenses
• Analyze key drivers for operational and budgetary change, WECC’s response to those drivers, and provide recommendations
FAC Assignment
Operations Planning
• Current -day/Real-time Support
• Next-day Study Data Validation and Mapping
• Seasonal SOL Coordination and Validation
• Emergency Plan Coordination
Real-time Operations
• Monitor and analyze real-time system conditions
• Coordinate system restoration activities
• Proactively respond to and mitigate potential adverse impacts to the BES
• Communicate with and direct corrective actions of registered entities during actual SOL exceedances
• Identify and mitigate potential/actual IROLs in real-time operations horizon
Compliance
• Document and Evidence Management
• Audit Preparation
• Event Analysis• Standards
Development• Compliance
Reporting• Disturbance
Reporting
Operations Support
• Application Architects
• Application Support
• DTS Support• EMS Modeling
• RAS Engineer
• Architecture Support
• Communications• IT Infrastructure• Systems
Administrator
WISP
• Broaden deployment of phasor measurement units throughout the Western Interconnection
• Implement telecommunication network necessary to support a large-scale production synchrophasor system
• Install synchrophasor applications for Western Interconnection
• Increase ability to integrate variable generation
• Enhance power system analysis capability/model validation
Training
• Develop/Deliver in-house training to new RC trainees and current RC staff to ensure compliance with mandatory standards and retention of NERC RC System Operator certification
• Conduct just-in-time training for new tools, applications, procedures, and processes
• Update job task analysis
• Develop/deliver NERC-certified restoration training to BAs, TOPs, and GOs
Other
• Direction and Oversight
• Administrative Support
• WECC and NERC Committee Work
• WECCRC.org Development
• Membership Request Management
Existing WECC RC Functions and Current Staffing
Current FTE – FilledCurrent FTE Approved – Unfilled
8216
Totals
7
• FERC/NERC Requirementso Highest level of authority responsible for the
reliable operation of the BESo Authority to prevent or mitigate emergencies in
next-day analysis/real-timeo Wide Area view of BES (situational awareness)o Tools, processes, and procedureso Broad purview to enable IROL calculation(s) that
may be based on parameters of transmission systems beyond any TOPs vision
Summary of the Issue
8
• Reliability Coordination in the Western Interconnectiono Past – Reliability through collaboration
Hosted by utilities – CAISO, BPA, WAPA Use of facilities, tools, and personnel
o Present – WECC’s Responsibility Independent facilities, tools, and responsibilities Compliance obligations questioned Reliability vulnerabilities exist
o Future – Implement RCTF Recommendations Increase staffing in critical areas Meet regulatory compliance requirements Reduce reliability vulnerabilities
Summary of the Issue
9
Summary of RCTF Findings
• Additional personnel are recommended in the following areas:o Real-time operations
Broad purview to enable IROL calculations (granularity, specific focus)
Additional real-time tools, processes, procedures
o Operations support Creation of operating plans, procedures (seasonal and next-
day studies) System Modeling and model validation IT application support requirements
o Compliance supporto Training
10
Summary Conclusions
• WECC has a high level of responsibility and is at risk for reliability and compliance issueso Staffing is a major factoro Tools are a major factor
• Emergent tools and Standards will add to these risksoWISP-related displays, data, trainingo PER-005 and EOP-005
11
Real-Time Operations
• RC Contingency Analysis • Four RC System Operators on shift on
September 8, 2011o Prior to loss of North Gila-Hassayampa 500-kV line,
there were 287 harmful contingencies identified by RTCA
o RTCA run following line loss identified 632 harmful contingencies
o Between start of event and SONGS units tripping (less than 11 minutes) 1,185 alarms were generated
12
Real-Time Operations
• Similar events to SW Outage reveal RC real- time staffing concerns
• Ability to monitor current system specifics questioned by regulatorso Increase in required monitoring of RAS o Emergent tools such as WISPo Sub-100-kV facilities
• Specific interconnection area knowledge by RC System Operators needed to meet requirements
• RC phone calls per quarter have increased to over 37,000
13
Real-Time Operations
2009 2010 2011 2012 (Projected)
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
8455
992810528
1200712263
15660 15336
19730
RC Log Totals
Loveland RC
Vancouver RC
Loveland RCTotal Load: 48888 MWTotal BAs: 16Total TOPs: 25
Vancouver RCTotal Load: 104506 MW Total BAs: 21Total TOPs: 29
Vancouver RCTotal Load: 49666 MWTotal BAs: 16Total TOPs: 17
Loveland RCTotal Load: 47888 MWTotal BAs: 15Total TOPs: 24
CA/MX RCTotal Load: 54840 MWTotal BAs: 6Total TOPs: 13
17
• The RC must create and maintain operating plans, procedures, and processeso This documentation must:
Identify RC System Operator actions taken to address specific system conditions and events
Reflect compliance to mandatory NERC, FERC, and Regional requirements, policies, and procedures
• Currently no specific position to perform this function
Real-Time Operations - Documentation
18
• Additional personnel are recommended in order to:o Monitor the Western Interconnection to the level
of granularity expected by FERC, NERC, and the NPCC
o Respond effectively to the volume of alarms and RTCA results during an event to determine appropriate corrective action
o Create and maintain Operating Plans, Procedures, and Processes as required by NERC Standards
Real-Time Operations − Findings
Real-Time Operations
• Monitor and analyze real-time system conditions
• Coordinate system restoration activities
• Proactively respond to and mitigate potential adverse impacts to the BES
• Communicate with and direct corrective actions of registered entities during actual SOL exceedances
• Identify and mitigate potential/actual IROLs in real-time operations horizon
33 0 14FTE Totals
Current FTE – FilledCurrent FTE Approved – UnfilledFuture FTE Projection
WECC RC Function and Recommended FTE Increase
20
• SW Outage event and regulatory findings revealed seasonal planning gapso Not all WECC paths studied seasonallyo TOPs coordination weako Incomplete WECC contingency analysis
• Mitigating reliability vulnerabilitieso With an enhanced seasonal process and more
thorough assessments, the event may have been predicted
Operational Planning (Seasonal)
21
Operational Planning (Next-Day)
• Why did the RC next-day study not see the problem that caused SW Outage event?o Only study next-day peako Study automation incompleteo Need to assess sub-100-kV facilitieso Forecast data quality inputs need improvement
and are too numerous Number of scheduled outages continues to increase A million rows of unit commitment data daily
22
• Additional personnel are recommended to perform the following activities: o Seasonal Planning:
Take lead in implementation of an enhanced process with more thorough assessments
Participate in the resolution of identified gaps in the WECC Regional process
o Next-Day Study: Complete study automation Assess sub-100-kV facilities Ensure quality of data inputs
Operations Planning - RCTF Findings
Operations Planning
•Current -day/Real-time Support
•Next-day Study Data Validation and Mapping
•Seasonal SOL Coordination and Validation
•Emergency Plan Coordination
9 5 11
FTE Totals
Current FTE – FilledCurrent FTE Approved – UnfilledFuture FTE Projection
WECC RC Function and Recommended FTE Increase
24
• Model Impacts to Situational Awareness• Three ways to improve accuracy of RTCA:o Increase accuracy of facility ratings and SOLso Increase number of RAS modeledo Expand modeling of lower-voltage networks
that impact the BES Sub-100-kV systems that parallel higher voltage
networks Sub-100-kV systems with both automatic and
manually-switched reactive devices
Operations Support – System Modeling
25
Operations Support – System Modeling
• RAS Engineer and EMS Modeling –• WECC RC System Operators are required to
improve awareness of the impacts of RAS
• Continuing increase in the number of WECC RAS
• A key component of improved awareness –• RAS modeling in the EMS and real-time
contingency analysis (RTCA)• Only 45 of 206 RAS modeled in RTCA
26
Operations Support – System Modeling
Jan-08 Jan-09 Jan-10 Jan-11 Jan-120
50
100
150
200
250
0 0
18
46 47
161
180195 200 206
RAS Modeled vs. Identified WECC RAS
Jan-08 Jan-09 Jan-10 Jan-11 Jan-120
500
1000
1500
2000
2500
3000
3500
702 718 722
1176
1604
3012 31093284 3270
3368
RAS Real-time Data Points in EMS
RT RAS Points in EMS
Minimum Expected RT Points
27
Operations Support – System Modeling
11/18/2010 2/26/2011 6/6/2011 9/14/2011 12/23/2011 4/1/2012 7/10/2012 10/18/20120
2000
4000
6000
8000
Model/Data/Tool Issues Identified and Addressed
Closed IssuesTotal Issues
Nu
mb
er o
f Is
sues
Jan-
09
Apr
-09
Jul-0
9
Oct
-09
Jan-
10
Apr
-10
Jul-1
0
Oct
-10
Jan-
11
Apr
-11
Jul-1
1
Oct
-11
Jan-
12
Apr
-12
Jul-1
2
Oct
-124000
5000
6000
7000
8000
4328 4192
4929 4737
5606 5677 55885081
5498 5566 5734 5872 59576421
7121
7775Contingencies Defined
# of Contingencies
28
• Addressing Model Deficiencies• WECC RC needs to be more proactive in the
modeling process by increasing the frequency of model reviews with TOPso West-wide System Model and Base Case
Reconciliation Task Force (WBRTF)o Develop process for periodic review and sign off of
model accuracyo Add more power system measurements
• Share data and application results
Operations Support – System Modeling
29
• Applications and IT areas of responsibility include, but are not limited to: o coordinated outage scheduling o EMS system support o load and interchange forecasting o operating system maintenance o change managemento cyber security administrationo networking
Operations Support - Applications and IT
30
• Application Architects and Support areas of responsibility include, but are not limited to: o support planning of IT initiatives to evaluate and determine
new tools, technology, and integration with external drivers such as SAFNR or data requests
o attend working groupso review new software releases o set system directiono upgrade pathso ensure a timely response for application support o ensure continued compliance with new CIP Standards
Operations Support - Applications and IT
31
• IT and Applications increases since 2009:o Number of applications increased from seven to 16o Number of users increased from 15 to 34
• As a cost savings measure, RC tool applications have been developed in-house o Creating a burden: volume of custom applications
requiring on-going maintenance have increased o Number of developed applications increased from
two to 53
• Support staff increased from five to six
Operations Support - Applications and IT
32
Operations Support - IT Infrastructure
0
20
40
60
80
100
120
140
160
148
171216 14
23
42
17 20
37
114
23
58 61
156
IT Infrastructure
2009
2010
2011
2012
33
Operations Support - IT Infrastructure
2009 2010 2011 20120
50
100
150
200
250
40
8090
232
0 0
50
218
1 2 4 4
Server Count Increase
Non-WISP Servers
WISP Servers
# of Dedicated Systems Administrators
• In 2009 average was 40 servers/IT employee• Today, it is over 112 servers/IT employee
34
WISP − IT Infrastructure
• WISP is cutting edge technologyo WECC staff to develop and maintain custom
software for the WISP programo There will be a 40 percent increase in the
amount of data storage in SQL databases with the synchrophasor systems
o Voltage Stability Analysis will be integrated with 1500 points of synchrophasor data that will be maintained and tuned
35
• Additional personnel needed in the following in order to:o Identify and address model deficiencieso Make necessary improvements to the modelo Ensure proper model validation with TOPso Model all WECC Region RAS and real-time RAS
data points in the WECC RC EMSo Provide maintenance and support for an
increasing number of users, applications, and servers
o Ensure compliance
Operations Support − RCTF Findings
Operations Support
•Application Architects•Application Support•DTS Support•EMS Modeling•RAS Engineer•Architecture Support•Communications•IT Infrastructure•Systems Administrator
20 3 12
FTE Totals
WECC RC Function and Recommended FTE Increase
Current FTE – FilledCurrent FTE Approved – UnfilledFuture FTE Projection
37
• WECC RC Compliance staffing has experienced high turnover in the last three years
• As of 11/26/12 only one staff position is dedicated to Complianceo Compliance monitoring and documentation
undertaken by upper-level RC management resulting in additional work often outside normal duty hours
Compliance
38
• The WECC RC increased staffing will improve the ability to:o Meet the March 2012 WECC Board Resolution
that established clear compliance expectations for WECC
o Meet increased compliance and reliability responsibilities
o Meet increased regulator expectationso Mitigate increasing regulatory and
financial risks
Compliance - RCTF Findings
Compliance
•Document and Evidence Management
•Audit Preparation•Event Analysis•Standards Development•Compliance Reporting•Disturbance Reporting
111
FTE Totals
Current FTE – FilledCurrent FTE Approved – UnfilledFuture FTE Projection
WECC RC Function and Recommended FTE Increase
40
• Reliability Coordination Trainerso Training responsibilities are identified in NERC
Reliability Standards
• DTS Engineers o Support increase in system restoration drills,
exercises, and simulationso Assist in developing implementation of new
TOP and region-specific restoration training scenarios
Training
41
NOTE: Includes projected hours for remainder of 2012
Internal -Training Hours
CEHs (Hrs) Standards (Hrs) Simulation (Hrs) Professional (Hrs)
2009 109 14 66 0
2010 843.5 579 501.5 0
2011 1810 1235.5 826 1473
2012 2406 1128 995 1822
250
750
1250
1750
2250 2009
2010
2011
2012
42
• Additional personnel recommended to:o Provide required training to RC staffo Provide required training to regional reliability
entitieso Ensure training documentation is maintained as
a providero Ensure compliance with NERC Reliability
Standards
Training - RCTF Findings
Training
•Develop/Deliver in-house training to new RC trainees and current RC staff to ensure compliance with mandatory standards and retention of NERC RC System Operator certification
•Conduct just-in-time training for new tools, applications, procedures, and processes
• Update job task analysis •Develop/deliver NERC certified restoration training to BAs, TOPs, and GOs
456
FTE Totals
WECC RC Function and Recommended FTE Increase
Current FTE – FilledCurrent FTE Approved – UnfilledFuture FTE Projection
44
Conclusions
• WECC has a high level of responsibility and is at risk for reliability and compliance issueso Staffing is a major factoro Tools are a major factor
• Emergent tools and Standards will add to these risksoWISP related displays, data, trainingo PER-005 and EOP-005
45
• Increase monitoring areas from two to three• Add 47 WECC RC FTEs to enhance and
improve the capability of the RC as follows:o 2013 - 17 FTEso 2014 - 22 FTEso 2015 - 8 FTEs
• Acquire additional tools as identified in the projected budget
RCTF Recommendations
Current FTE – FilledCurrent FTE Approved – UnfilledFuture FTE Projection
821647
Totals
Operations Planning
• Current-day/ real-time Support
• Next-day Study Data Validation and Mapping
• Seasonal SOL Coordination and Validation
• Emergency Plan Coordination
9 5 11
FTE Totals
Real-time Operations
• Monitor and analyze real-time system conditions
• Coordinate system restoration activities
• Proactively respond to and mitigate potential adverse impacts to the BES
• Communicate with and direct corrective actions of registered entities during actual SOL exceedances
• Identify and mitigate potential/actual IROLs in real-time operations horizon
33 0 14
FTE Totals
Compliance
• Document and Evidence Management
• Audit Preparation
• Event Analysis• Standards
Development• Compliance
Reporting• Disturbance
Reporting
111
FTE Totals
IT Applications, Engineering
Support, & IT Support
• Application Architects
• Application Support
• DTS Support• EMS Modeling
• RAS Engineer
• Architecture Support
• Communications• IT Infrastructure• Systems
Administrator
FTE Totals
1220 3
WISP
• Broaden deployment of phasor measurement units throughout the Western Interconnection
• Implement telecommunication network necessary to support a large-scale production synchrophasor system
• Install synchrophasor applications for Western Interconnection
• Increase ability to integrate variable generation
• Enhance power system analysis capability/model validation
029
FTE Totals
Training
• Develop/Deliver in-house training to new RC trainees and current RC staff to ensure compliance with mandatory standards and retention of NERC RC System Operator certification
• Conduct just-in-time training for new tools, applications, procedures, and processes
• Update job task analysis
• Develop/deliver NERC certified restoration training to BAs, TOPs, and GOs
456
FTE Totals
Other
• Direction and Oversight
• Administrative Support
• WECC and NERC Committee Work
• WECCRC.org Development
• Membership Request Management
504
FTE Totals
WECC RC Function and Recommended FTE Increase
47
Budget Projections1 BASE BUDGET
2012 2013 2014 2015 2016 20172 Includes WISP, RC tools, approved FTE's and an across
the board 3% inflation increase $14,438,927 $19,024,411 $20,400,136 $21,010,320 $21,588,266 $23,169,891
3 TOTAL DOLLAR INCREASE FROM PREVIOUS YEAR $1,490,803 $3,585,484 $2,375,725 $610,184 $577,946 $1,581,6254 PERCENT INCREASE FROM PREVIOUS YEAR 10% 19% 12% 3% 3% 7%5 FUTURE REQUIREMENTS 6
Approved but unbudgeted FTE salaries, loading and set up cost. Not budgeted, staggered hiring in 2012 but included in 2013 base budget. And, over-runs for Operating Expenses and Fixed Assets. $1,520,569
7 18 unbudgeted requested 2013 FTE salary & loading costs. Staggered hiring in 2013. Full cost in 2014 and beyond. Includes 3% inflation increase on salaries.
$1,648,480 $1,702,759 $1,757,038 $1,811,317 $1,865,5968 Build out unbudgeted construction cost for 2013
requested 12 FTE. (6 FTE are in real-time control room)
$157,500 9 22 requested 2014 FTE salary & loading costs.
Staggered hiring in 2014. Full cost in 2015 and beyond. Includes 3% inflation increase on salaries.
$2,098,286 $2,164,627 $2,230,968 $2,297,30910 Build out construction cost for 2014 requested 14 FTE
(8 FTE are in real-time control room) $183,750 11 8 requested 2015 FTE salary & loading cost.
Staggered hiring in 2015. Full cost in 2016 and beyond. Includes 3% inflation increase on salaries.
$854,394 $878,518 $902,64212 Build out construction cost for 2015 requested 5 FTE
(3 FTE are in real time control room) $65,625 13 We will need to acquire 11250 Sq feet of space in
2013 as it becomes available in LRCC and VRCC so we don't lose the option in the current buildings. This is an added $17,000 per month. Assuming full cost beginning in 2013
$204,000 $204,000 $204,000 $204,000 $204,00014 Increase each year $1,520,569 $2,009,980 $4,188,795 $5,045,684 $5,124,803 $5,269,54715 Totals for base & future budgets (line 14 plus line 2) $15,959,496 $21,034,391 $24,588,931 $26,056,004 $26,713,069 $28,439,43816 PERCENT INCREASE FROM BASE BUDGET 10% 10% 17% 19% 19% 19%
NOTE -- 2013 DOE expansion of control rooms is $3.5 million dollars, anything outside of the $3.5 million will be a WECC cost.
NOTE -- the Enhanced Curtailment Calculator is in 2014 WECC Business Plan but not in the budget because it has not been approved by the WECC OC.
NOTE -- 2012 budget is projected to exceed base approved budget by $1,520,569 due to cost overrun in Personnel, Operating Expenses and Fixed Assets.
NOTE -- 2013 and 2014 Total Dollar Increase From Previous Year (Line 4) is due to change in WISP funding from DOE to WECC
NOTE -- 2017 Total Dollar Increase From Previous Year is due to hardware refresh for WISP support
Questions?
49
Back Up Slides
50
Control Room Facilities Comparison
MISO
WECC RC Vancouver
51
Acronym GuideBA – Balancing AuthorityBES – Bulk Electric SystemCIP – Critical Infrastructure ProtectionDTS – Dispatcher Training SimulatorEMS – Energy Management SystemFTE – Full-time EquivalentIROL – Interconnection Reliability Operating LimitNERC – North American Electric Reliability CoordinationRAS – Remedial Action SchemeRC – Reliability CoordinatorRTCA – Real-time Contingency AnalysisSOL – System Operating LimitSONGS – San Onofre Nuclear Generating StationTOP – Transmission OperatorUSF – Unscheduled FlowWBRTF – West-wide System Model and Base Case Reconciliation Task Force WISP – Western Interconnection Synchrophasor ProjectWSM – West-wide System Model
52
Real Time Operations
• Subregional strategic shift from two to three areas:o More RC System Operators monitoring the systemo Wide area coordination with specific and targeted
increase in focus o Dedicated on-shift engineer in each control room to
ensure accuracy of data and provide study supporto Improved and more specific regional procedures,
operating guides, and corresponding displays
53
2009 2010 2011 20120
2
4
6
8
10
12
14
16
Applications Support 2009 - 2012
Number of Applica-tions
Support Staff
Operations Support - Applications
7
5
10
56 6
11
16
54
Operations Support - Applications
2009 2010 2011 20120
5
10
15
20
25
30
35
Support Staff to Users Ratio 2009 - 2012
Users
Support Staff
15
24
28
34
5 56 6
55
Operations Support - Applications
2009 2010 2011 20120
10
20
30
40
50
60
25
24
53
0 1 2 2
Application Development 2009 - 2012
Developed Applications
Development Staff
Operations Support - RCWorkbook – Monitoring RTCA
CONFIDENTIAL
Post-contingent branch, interface, and bus voltage limit exceedances presented. Island contingencies as well as unsolved contingencies (potential IROLs) are presented using this WECC RC developed tool.
57
External -Training Hours
CEHs (Hrs) Standards (Hrs) Simulation (Hrs) Professional (Hrs)
2009 1890 326 1414 0
2010 3903 1781 2916.5 0
2011 6438 2538 5321.5 3010
2012 8345 2870 7462 8345
500
1500
2500
3500
4500
5500
6500
7500
8500
2009
2010
2011
2012
58
Training - External Savings
Airfare and car rental are not included in the estimated savings
2009 2010 2011 2012 2013 Restora-tion 4 Regions
(Projected)
Registration 59000 122000 201250 260750 250000
Per Diem + Hotel 47200 97600 161000 208600 200000
Grand Total Savings 106200 219600 362250 469350 450000
$25,000
$75,000
$125,000
$175,000
$225,000
$275,000
$325,000
$375,000
$425,000
$475,000
Registration
Per Diem + Hotel
Grand Total Savings
59
Training - Internal Cost Savings
Airfare and car rental are not included in the estimated savings
2009 2010 2011 2012
Registration 3500 26250 56500 60000
Per Diem + Hotel 2800 21000 45200 48000
Grand Total Savings 6300 47250 101700 108000
$10,000
$30,000
$50,000
$70,000
$90,000
$110,000
Registration
Per Diem + Hotel
Grand Total Savings
60
Real-time Operations
2009 2010 2011 2012Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3
0
5000
10000
15000
20000
25000
Number of Recorded Calls
Vancouver RC
Loveland RC
Are these numbers by Quarter?
61
Real Time Operations
BA TOP0
5
10
15
20
25
6
13
15
24
1617
BA/TOP Sub-Regional Assignments
(CA/MEX)
Loveland RC (Rocky Mountain and Desert SW)
Vancouver RC (Pacific NW)
Current FTE – FilledCurrent FTE Approved – Unfilled
8115
Totals
Operations Planning
• Current -day/real-time Support
• Next-day Study Data Validation and Mapping
• Seasonal SOL Coordination and Validation
• Emergency Plan Coordination
9 5
FTE Totals
Real-time Operations
• Monitor and analyze real-time system conditions
• Coordinate system restoration activities
• Proactively respond to and mitigate potential adverse impacts to the BES
• Communicate with and direct corrective actions of registered entities during actual SOL exceedances
• Identify and mitigate potential/actual IROLs in real-time operations horizon
33 0
FTE Totals
Compliance
• Document and Evidence Management
• Audit Preparation
• Event Analysis• Standards
Development• Compliance
Reporting• Disturbance
Reporting
00
FTE Totals
Operations Support
• Application Architects
• Application Support
• DTS Support• EMS Modeling
• RAS Engineer
• Architecture Support
• Communications• IT Infrastructure• Systems
Administrator
FTE Totals
20 3
WISP
• Broaden deployment of phasor measurement units throughout the Western Interconnection
• Implement telecommunication network necessary to support a large-scale production synchrophasor system
• Install synchrophasor applications for Western Interconnection
• Increase ability to integrate variable generation
• Enhance power system analysis capability/model validation
29
FTE Totals
Training
• Develop/Deliver in-house training to new RC trainees and current RC staff to ensure compliance with mandatory standards and retention of NERC RC System Operator certification
• Conduct just-in-time training for new tools, applications, procedures, and processes
• Update job task analysis
• Develop/deliver NERC certified restoration training to BAs, TOPs, and GOs
56
FTE Totals
Other
• Direction and Oversight
• Administrative Support
• WECC and NERC Committee Work
• WECCRC.org Development
• Membership Request Management
04
FTE Totals
Existing WECC RC Functions and Current Staffing
63
Improving Models - Adding Measurements
Feb-0
9
Apr-0
9
Jun-
09
Aug-0
9
Oct-09
Dec-0
9
Feb-1
0
Apr-1
0
Jun-
10
Aug-1
0
Oct-10
Dec-1
0
Feb-1
1
Apr-1
1
Jun-
11
Aug-1
1
Oct-11
Dec-1
1
Feb-1
2
Apr-1
2
Jun-
12
Aug-1
20
10000
20000
30000
40000
50000
60000
Data Points Monitored by WECC RC
MW, MVAR, tap posi-tions
CB & Switch Status
Adding measurements is necessary but translates to more alarms for the RC System Operators. Many measurements are still needed.