9
presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the OASIS PLCS TC 45’th meeting 2009-06-10 Proposal for increased efficiency of the OASIS PLCS TC

presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

  • Upload
    lamar

  • View
    24

  • Download
    2

Embed Size (px)

DESCRIPTION

Proposal for increased efficiency of the OASIS PLCS TC. presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the OASIS PLCS TC 45’th meeting 2009-06-10. This presentation Description of the current situation The intention and result The proposal - PowerPoint PPT Presentation

Citation preview

Page 1: presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

presented byMats Nilsson – Swedish Defense Materiel Administration (FMV)

at theOASIS PLCS TC 45’th meeting 2009-06-10

Proposal for increased efficiency ofthe OASIS PLCS TC

Page 2: presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

Mats Nilsson, FMV Log SamO – 2009-05-26

Proposal for increased efficiency of the OASIS PLCS TC

This presentation

• Description of the current situation• The intention and result• The proposal• Work and decisions• FMV statement

Page 3: presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

Mats Nilsson, FMV Log SamO – 2009-05-26

Proposal for increased efficiency of the OASIS PLCS TC

The current situation• Development of the AP, DEXs, and development infrastructure is

discontinuous and slow

• Coordination of business DEX development is absent

• Technical oversight is inadequate

• More and more attention is given to PLCS, but this means we’re also at higher risk of getting a wide spread bad reputation

- After 10 years of development, we still haven’t got a single specification of PLCS usage available to the public that is stable enough to allow a full scale implementation at a reasonable risk!

Page 4: presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

Mats Nilsson, FMV Log SamO – 2009-05-26

Proposal for increased efficiency of the OASIS PLCS TC

The intention

To establish a way to ensure that funding is in place to allow the main OASIS PLCS TC activities to be performed continuously

The result• Specifications/standards developed efficiently and ballot comments

resolved swiftly• the DEXlib and other infrastructure is supporting the development,

configuration management and publication of DEXs and compatible software

• Business DEX developments coordinated in a way that PLCS dialects are reduced, resources for generic DEXs and Templates are made available and issues or suggestions for improvement are collected

• The benefits of PLCS are communicated clearly and the usage of the standard is broadened

Page 5: presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

Mats Nilsson, FMV Log SamO – 2009-05-26

Proposal for increased efficiency of the OASIS PLCS TC

The proposal• Create a listing and description of the most important and central

OASIS PLCS TC activities

• Estimate the annual time needed to perform these activities, and the funding needed for personal and possible infrastructure

• Identify contributors willing to commit to fund this estimate over a three year period, with an annual possible prolongation of one year

• Develop a method/solution for how the committed resources shall be transformed into actual work being performed

• Develop a method/solution for how decisions on where to direct the resources shall be made

Page 6: presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

Mats Nilsson, FMV Log SamO – 2009-05-26

Proposal for increased efficiency of the OASIS PLCS TC

The way forward• Agree with the Intension, or present an alternative approach

Agree with the main principals of the proposal

• Create a group that can refine the proposal further and make it come into life

• Begin an efficient production of specifications and standards!

To continue as of today does not allow FMV to plan its implementation of PLCS efficiently, which jeopardises future Swedish involvement in the development of the standard.

Page 7: presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

Mats Nilsson, FMV Log SamO – 2009-05-26

Proposal for increased efficiency of the OASIS PLCS TC

FMV commitment

FMV commit to contribute up to 100.000 € per year, given that the same commitment is made by the other major players

- Are you in or not!?

Page 8: presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

Mats Nilsson, FMV Log SamO – 2009-05-26

Proposal for increased efficiency of the OASIS PLCS TC

- - - (presentation end) - - -

Page 9: presented by Mats Nilsson – Swedish Defense Materiel Administration (FMV) at the

Mats Nilsson, FMV Log SamO – 2009-05-26

Proposal for increased efficiency of the OASIS PLCS TC

Activity

TC administration- Provide teleconference facility- Provide web meeting facility- Plan, prepare for and chair TC meetings- Compose and distribute TC meeting agenda- Take meeting notes and file protocols

TC technical development and coordination- (TOG activities)- Develop and maintain the DEXlib Help and Information Pages

TC infrastructure- Uphold the domain names ‘plcs.org’ and ‘plcs-resources.org’- Develop DEXlib and tools functionality- Maintain the ‘plcs-resources’ web site

TC communication- Develop and maintain up-to-date presentation material- Maintain the OASIS PLCS TC web

TC quality assurance and testing- Arrange test rally .Total annual TC resources

Pers. Time Equip. CostTotal

x x x x x

x x x x x

x x x x x

x x x x x

x x x x x

x x x x x

x x - x x

x x - €30 x

x x x x x

x x €200 x x

x x x x x

x x - x x

x x x x x

. n n n n

n