BUFFALO BAYOU DEVELOPMENT TEAM

Presented and arranged by:Jason Vila and Sergio Castillo

Page 2: Presented and arranged by: Jason Vila and Sergio Castillo

Project Description

Requirements: Family oriented entertainment Scenic over look of the bayou Ample parking space Scenic park, entertainment, and fitness options Generate enough revenue to pay back construction costs

Details: 2.5 acres Previously served as two parking lots Bounded by Commerce Street, La Branch Street, and Caroline

Street Flood plain for the Buffalo Bayou

Page 3: Presented and arranged by: Jason Vila and Sergio Castillo

Conceptual Ideas

Building Features and Land Use: Restaurants Outdoor Theatre and Stage Night Club Retail Space Gym Rock gym and central rock climbing pillar Dodge ball or Sky High Flood Plain Rain water harvesting facility on roof

Ravichandran
Retail space includes all shops
Ravichandran
Talk abt this very briefly to score some green points with the judges. Sergio, we discussed about having a tank that stores the rain water from the site and use it for toilet and irrigation purposes on site.
Page 4: Presented and arranged by: Jason Vila and Sergio Castillo

Architectural DesignPerspective View X –ray Elevation

Plan

Elevation

Page 5: Presented and arranged by: Jason Vila and Sergio Castillo

Conceptual Rendering

Site Plan realisticPerspective View

Page 6: Presented and arranged by: Jason Vila and Sergio Castillo

Foundation and Structural Plans

Foundation: Due to the previous status of the site being a parking

lot, the foundation has already been constructed with concrete.

The parking lot will remain as the building will expand upward.

Structural : Entire structural plan will be based on concrete. Concrete beams: 5 – 10 ft. Concrete girders: 10 - 25 ft. Concrete columns: 20 - 25 ft.

Page 7: Presented and arranged by: Jason Vila and Sergio Castillo

Construction Specifics

Glass windows Tile flooring Accessible Green roof Concrete walls (could be tile) Retaining walls on the roof Lockers for the gyms Parking lot at ground level Hydraulic Pump Elevators Inside retailing --- involves core and shell

construction (walls, flooring, etc.)

Page 8: Presented and arranged by: Jason Vila and Sergio Castillo

Budget and Construction Schedule

Page 9: Presented and arranged by: Jason Vila and Sergio Castillo

Area Water and Wastewater

Page 10: Presented and arranged by: Jason Vila and Sergio Castillo

Satellite Visual

Page 11: Presented and arranged by: Jason Vila and Sergio Castillo