The two identified similar virendeel girders were placed horizontally over the prepared ground on sleeper supports The girders were provided with white wash Torsteel… Civil-Aid…

Presentations.ppt

Embed Size (px)

Citation preview

Page 1: Presentations.ppt

The two identified similar virendeel girders were placed horizontally over the prepared ground on sleeper supports

The girders were provided with white wash

Torsteel…

Civil-Aid…

Page 2: Presentations.ppt

The girders were inspected in detail for any cracks.

The girders were placed such that they are parallel to each other with top chord facing each other

Torsteel…

Civil-Aid…

Page 3: Presentations.ppt

MS stools were provided in between the girders at every

1.0 m spacing

Torsteel…

Civil-Aid…

Page 4: Presentations.ppt

A view of pressurised Hydraulic jacksTorsteel…

Civil-Aid…

Page 5: Presentations.ppt

Hydraulic jacks were fitted to the MS stoolsTorsteel…

Civil-Aid…

Page 6: Presentations.ppt

Mechanical jacks with prooving rings (25 T each) fitted to the MS stools provided at the girder ends for application of load through mechanical jacks manually

Torsteel…

Civil-Aid…

Page 7: Presentations.ppt

Hydraulic jacks were connected to a common manifold

with a centralized power pack through Hydraulic hoses

Torsteel…

Civil-Aid…

Page 8: Presentations.ppt

A close up view of DeflectometerTorsteel…

Civil-Aid…

Page 9: Presentations.ppt

Deflectometers were also placed at the reaction end to measure the support movement under load

Torsteel…

Civil-Aid…

Page 10: Presentations.ppt

Initial readings of all deflectometers were recorded

Torsteel…

Civil-Aid…

Page 11: Presentations.ppt

Tension belts were tied together with a wire rope

coupled with turn buckle

Torsteel…

Civil-Aid…

Page 12: Presentations.ppt

View of set up prior to commencement of load test Torsteel…

Civil-Aid…

Page 13: Presentations.ppt

During the process of loading, the appeared cracks were

measured by crack scope

Torsteel…

Civil-Aid…

Page 14: Presentations.ppt

Ultrasonic Pulse Velocity Test was conducted across the crack to check the continuity of crack

Torsteel…

Civil-Aid…

Page 15: Presentations.ppt

The entire set-up was dismantled after the test is

completed and girders were erected

Torsteel…

Civil-Aid…

Page 16: Presentations.ppt

LOAD TEST ON PSC BOX GIRDER

Page 17: Presentations.ppt

POSITION OF DEFLECTOMETERS FOR

MEASUREMENT OF DEFLECTION

Page 18: Presentations.ppt

POSITION OF AXLE FOR APPLICATION OF TEST LOAD

Page 19: Presentations.ppt

POSITION OF TRUCK AND TRAILOR WITH DEFINED LOADS

Page 20: Presentations.ppt
Page 21: Presentations.ppt
Page 22: Presentations.ppt
Page 23: Presentations.ppt
Page 24: Presentations.ppt
Page 25: Presentations.ppt
Page 26: Presentations.ppt
Page 27: Presentations.ppt
Page 28: Presentations.ppt
Page 29: Presentations.ppt
Page 30: Presentations.ppt

Load test on assembly of precast units

Page 31: Presentations.ppt

Testing of efficacy of welded joints in auditorium frames – PES college, Bangalore

Page 32: Presentations.ppt

Pull out test on embedded rebar in concrete

Page 33: Presentations.ppt

Lateral load test on handrails at Sri. Kanteerava Outdoor stadium

Page 34: Presentations.ppt

Lateral load test on handrails at Sri. Kanteerava Outdoor stadium

Page 35: Presentations.ppt

Load test on slab of connecting corridor at

Infosys, Mangalore

Page 36: Presentations.ppt

Load test on centralized trusses of Sri. Kanteerava outdoor stadium – Test load was applied at the tip of trusses by placing concrete blocks on steel cradle

(strain and deflection was measured)

Page 37: Presentations.ppt

Pull out test on mechanical anchors