Upload
amanda-cunningham
View
218
Download
1
Embed Size (px)
Citation preview
PRESENTATIONPRESENTATION
BYBY
DEPTT. OF FPI & HORTICULTUREDEPTT. OF FPI & HORTICULTURE
GOVT. OF WEST BENGALGOVT. OF WEST BENGAL
Crops and Districts for NHM Intervention Program (2006-07)
Name of District Mango Guava Banana Pineapple Orange Flowers Cashew Betelvine Spice
Darjeeling
Jalpaiguri
Coochbehar
Uttar Dinajpur
Dakhin Dinajpur
Malda
Murshidabad
Nadia
North 24-parganas
South 24-parganas
Hooghly
Howrah
Burdwan
Birbhum
Purulia
Bankura
Purba Midnapore
Paschim Midnapore
Assistance sought for 9 Crops and 10 Districts
CROP WISE BREAKUP
S. No. Crop Area (Ha) Requirement of Planing material
1 Mango 4000 10lac
2 Pineapple 1000 640 lac
3 Guava 1300 5.2 lac
4 Orange 500 2 lac
5 Banana 1700 52.5 lac
6 Cashew 900 1.8 lac
7 Spice 600 -
8 Betel Vine 100 -
9 Flowers 1100 -
West Bengal NHM Annual Action Plan-2006-07
S. No. Program particularsOUTLAY FOR
2006-20071 Nursery 6122 Tissue Culture Labs 323 New Gardens Fruits 1117.54 New Gardens Flowers 301.725 New Gardens Spices 67.56 Plantation Crops 74.257 Rejuvenation 3008 Water Resources 3009 Protected Cultivation 59.25
10
11
Bee Keeping
Front line Demonstration
800
91.812 IPM 65013 Organic Farming 67014 HRD 182.17515 Post Harvest Management 2779.585516 Marketing assistance 378.744517 Mission Management 960.475
Total Assistance 9377.00
Rs. in Lakhs
Nursery for Planting materialNursery for Planting material
•PUBLIC SECTOR (4 HA.): 10
•PRIVATE SECTOR (4 HA): 10
•PRIVATE SECTOR (1 HA): 240
Tissue Culture
Public Sector
Sl. No Unit No
1 CDRS, KALIMONG 1
2 DEPTT. OF SCIENCE & TECHNOLOGY, NORTH 24 PGS. 1
3 BCKV, MOHANPUR 1
Total 3
Private Sector
Sl. No Unit No.
1 AGRI-HORTI SOCIETY, ALIPORE 1
2 BK BIOTECH, CHANDANNAGAR. 1
Total 2
Proposed Area Expansion program for FruitsProposed Area Expansion program for Fruits
Total area expansion in the 2006-07 is estimated at 8500 ha.
DistrictDistrict MangoMango GuavaGuava BananaBanana PineapplePineapple OrangeOrangeDarjeeling Darjeeling 500500 300300
JalpaiguriJalpaiguri 200200 500500 500500 200200
MaldaMalda 550550 100100
MurshidabadMurshidabad 550550 100100 300300
NadiaNadia 550550 100100 400400
North 24-PgsNorth 24-Pgs 550550 200200 200200
HooghlyHooghly 400400 100100 300300
PuruliaPurulia 600600 300300
BankuraBankura 600600 200200
Paschim Paschim MidnaporeMidnapore
200200
TotalTotal 40004000 13001300 17001700 10001000 500500
New Gardens FloricultureName of district Area in ha
Small & Marginal Other
Cut flower
Siliguri, Darjeeling 40 20
Jalpaiguri 30 20
North 24-parganas 40 20
Nadia 50 20
Paschim Midnapore 40 20
Total 200 100
Bulbous flowers
Siliguri 60 10
Jalpaiguri 50 20
North 24-parganas 80 20
Nadia 70 20
Paschim Midnapore 40 30
Total 300 100
Loose Flower
Siliguri 60 10
Jalpaiguri 90 10
North 24-parganas 30 20
Nadia 80 30
Paschim Midnapore 40 30
Total 300 100
Proposed Area Expansion program for Spice
S No Name of district/ Farm Other spices (ha) Assistance (Rs. In Lakh)
1 North 24-Pgs 220 24.75
2 Murshidabad 120 13.5
3 Jalpaiguri 120 13.5
4 Nadia 80 9
5 Darjeeling 60 6.75
600 67.5
Plantation Crops
Name of District Cashew nut
Area in ha. Requirement of fund ( Rs. in lakh)
Paschim Midnapore 500 28.125
Bankura 200 11.25
Purulia 200 11.25
Total: 900 66.375 (50.625 + 15.75)
Name of Districts Betelvine
Area in ha. Requirement of fund (Rs. in lakhs)
North 24- Pgs 40 2.25
Hooghly 20 1.125
Nadia 40 2.25
Total 100 7.875 (5.625 + 2.25)
Program for Rejuvenation
Sl No Name of District Area in ha
Mango 1 Malda 600
2 Murshidabad 600
3 Nadia 300
4 North 24-parganas 200
5 Hooghly 100
Total - 1800
Cashewnut 6 Paschim Midnapore 200
Total- 200
Protected cultivation: Total 59.25 lakhGreen House Hi- tech Normal
Darjeeling 1 1
Hooghly 1 2
North 24-Pgs 2 4
Jalpaiguri 1
Paschim Midnapore
4
Total 8 8
Mulching Area (Ha)
Bankura 70
Purulia 70
Paschim Midnapore 40
Total 180
Shade Net Area (Ha)
Jalpaiguri 30
Nadia 150
North 24Prgs. 60
Paschim Midnapore 60
Hooghly 90
Total 390
Plastic tunnel Area (Ha)
Bankura 90
Purulia 120
Paschim Midnapore 90
Total 300
Integrated Pest Management projectSl. No Proposed Project Location Purpose Amount Rs. in Lakh
1 Promotion of IPM @ 0.01 lakh X 10000 ha
All Agri-Export Zone covering thirteen Districts
Improving horticultural produce both fresh & processed products
110
2 Establishment of Bio-control Laboratory @ Rs.80/-lakh / unit x 1 nos.
BCKVVRRS, Chinsura
Mass rearing of natural enemies / bio-agents.
160
3 Establishment of Plant health clinics, @ Rs.20/-lakh / unit x 7 nos.
PuruliaBankura (2)DarjeelingHooghlyPaschim MedinipurMurshidabad
Plant diagnostic center will promote adoption of Integrated Crop Management
140
4 Establishment of disease forecasting unit @ 4.00 lakh X10 unit
Darjeeling (2)JalpaiguriPuruliaHooghly (2)Paschim MedinipurNadia Bankura (2)
-do- 40
5 Leaf/ tissue analysis @ 20.00 lakh X 10
To analyze leaf tissue for assessment of nutrient uptake
200
TOTAL: 650
HRD: Total Assistance Rs. 182.175 lakh
Cost Heads per Institute Rs. in Lakhs
TRNG. OF SUPERVISOR/ ENTREPRENEURS 36.25
TRNG. OF GARDENER 94.675
FARMERS TRAINING PROGRAMME 37.5
FARMERS TRAINING CUM VISIT OUTSIDE STATE 6.25
TRAINING OF OFFICERS 7.5
Total 182.175
Post Harvest Management 2006-07
FacilitiesNo. of Units
Assistance Required (Rs. in lakhs)
Pack-house: 198 134.1625
Multipurpose Cold Storage 25 1349.96
Controlled Atmosphere Cold Storage 1 150
Refrigerated Vans/Container 30 199.992
Mobile Pre-cooling units 20 129.996
Collection/Grading/Sorting Centers 198 804.975
Two functional infrastructures for collection grading etc. of onion @ Rs.3.75 lakhs each. 2 7.5
Construction of low cost storage for onion bulbs @ Rs. 3000 per units. 100 3
Total (18 District) 2779.5855
Mission Management
Program Proposed Assistance Rs. in Lakhs
State & District Mission Structure including additional manpower & project preparation cost
5% of total annual expenditure on the basis of appraised needs
200
Support to cooperative for Infrastructural requirement
Cooperative support 480
Institutional strengthening hire/ Purchase of vehicles, hardware/ Software
130.475
Technical Support Group (TSG) 150
Total960.475
West Bengal NHM Financial Plan for 2006-07 Rs. in Lakhs
S. No. Program particulars Outlay1 Nursery 6122 Tissue Culture Labs 323 New Gardens Fruits 1117.54 New Gardens Flowers 301.725 New Gardens Spices 67.56 Plantation Crops 74.257 Rejuvenation 3008 Water Resources 3009 Protected Cultivation 59.25
10 IPM 65011 Organic Farming 67012 HRD 182.17513 Pollination Support 80014 Front Line Demonstration 91.815 Post Harvest Management 2779.585517 Marketing assistance 378.7445 18 Mission Management 960.475
Total Assistance 9377.00
SYNOPSIS OF FUND SYNOPSIS OF FUND REQUIREMENTREQUIREMENT
BACKLOG FOR 2005-06: BACKLOG FOR 2005-06: Rs. Rs. 4415.764415.76
FUND REQUIREMENT FOR 2006-07: FUND REQUIREMENT FOR 2006-07: Rs. Rs. 9377.009377.00
______________________________________________________________
TOTALTOTAL Rs. Rs. 13792.7613792.76
THANK YOUTHANK YOU