PRESENTATION TO THE SELECT COMMITTEE PRESENTATION TO THE SELECT COMMITTEE ON COOPERATIVE GOVERNANCE AND ON COOPERATIVE GOVERNANCE AND
TRADITIONAL AFFAIRSTRADITIONAL AFFAIRS04 SEPTEMBER 201204 SEPTEMBER 2012
BACKGROUNDBACKGROUND
Critical issues raised by the AG are as follows:• SCM• Human resource• Predetermined objectives• Information technology/Financial system• Quality of AFS(Material misstatements
2
BACKGROUNDBACKGROUND
Challenges/underlying factors • Inappropriate/poor skills• Poor performance reporting and management
with no consequences• No ownership of leadership: no appetite to take
responsibility
3
PRESENTATION OUTLINEPRESENTATION OUTLINE
• LEGISLATIVE MANDATE
• OPERATION CLEAN AUDIT PROGRAMME
1. Records Management Project2. Capacity Development Project3. MPAC4. Audit Remedial Plans
4
MFMA LEGISLATIVE MANADATE MFMA LEGISLATIVE MANADATE FOR MEC dlgta FOR MEC dlgta
Section 25: Failure to approve the budget before the start of the financial year, municipality must report to MEC dlgta.This must be read together with section 55 of MFMA which stipulates that the Mayor must inform MEC dlgta and the MEC shall undertake appropriate provincial intervention in terms of section 139
LEGISLATIVE MAN. CONT.LEGISLATIVE MAN. CONT.
• Sec 127[4][b]: The Auditor General must inform the MEC dlgta in the event that the Accounting Officer does not submit Annual Financial Statements
• Section 131(2) : MEC dlgta to assess all AFS’s and whether municipalities have appropriately addressed the queries raised by the AG and report to the Provincial Legislature
6
LEGISLATIVE MAN: CONT.LEGISLATIVE MAN: CONT.
• Section 132(3) : MEC dlgta to monitor whether municipalities have submitted annual performance reports and oversight report to the legislature.
• Section 136:Provincial intervention: MEC dlgta should act promptly in the event that he becomes aware that financial problems exist within a municipality. He will consult the mayor and also assess the extend of the problem and advice EXCO on appropriate action
7
LEGISLATIVE MAN: CONT.LEGISLATIVE MAN: CONT.
• Section 141 :Financial recovery plan.• The MEC dlgta must work closely with the MEC
Finance for the development, implementation and monitoring of Financial Recovery Plans
8
OPERATION CLEAN AUDIT OPERATION CLEAN AUDIT PROGRAMMEPROGRAMME
• RECORD MANAGEMENT• CAPACITY BUILDING• MPAC ESTALISHMENT • AUDIT REMEDIAL ACTION PLAN• OTHER INITIATIVES
9
RECORD MANAGEMENT RECORD MANAGEMENT
THEME:“PROPER RECORDS MANAGEMENT FOR CLEAN AUDIT
2014 AND BEYOND.”OBJECTIVES:• Develop and entrench a culture of proper records
management in municipalities• Promote good governance to enhance service delivery
through proper records and information management • Establish processes, mechanisms and procedures for
proper records management that will contribute towards the Clean Audit 2014 objective.
10
RECORDS MAN: CONT.RECORDS MAN: CONT.
Project deliverables• Establishment of sustainable and functional
records management procedures and practices within the BTO’s of priority municipalities
• Development and implementation of Approved Municipal Record Management File Plans
• Improved Municipal Audit outcomes by 2014
11
RECORD MANAGEMENT RECORD MANAGEMENT (cont.)(cont.)
PROGRESS /ACHIEVEMENT TO DATE PHASE 1- • Districts record management workshops for
Records Management officials of all 23 municipalities were conducted.
• 81 officials attended the District wide sessions.• The sessions were conducted as follows: 26-27
June in DRSM DM, 4-5 July in DKK DM, 10-11 July in NMM DM and 31 July -1 August in BPDM.
• Phase 1 is completed.
12
RECORD MANAGEMENT RECORD MANAGEMENT (cont.)(cont.)
PHASE 2- Record management awareness drive to politicians and senior officials of municipalities per district.
• 1st Consultation with Section 56 managers: BPDM on 15 August
• 2nd Consultation with Section 56 managers : 22 August NMMDM
• 3RD Consultation: 28th August DRSMDM• Still to confirm with DKKDM
13
CONT.CONT.
• Consultation with political leadership: MuniMEC of 31st August
Phase 3: 3 days Hands on Training for Records Managers
• Training for 33 officials from 11 priority municipalities: 11-13 Sept
• training for 24 officials from 12 non-priority municipalities: 18-20 Sept.
14
RECORD MANAGEMENT RECORD MANAGEMENT (cont.)(cont.)
PHASE 4 – Record management inspections and physical and intensive support.
• In partnership with DSAC inspections on 11 priority municipalities to verify needs, challenges and non-compliance issues for intensive support: e.g. an amount of R800 000 has been set aside by the department to buy necessary equipment for Records Units in these municipalities. Costed business plans are being finalized to this end.
15
CAPACITY DEVELOPMENTCAPACITY DEVELOPMENT
• 180 municipal finance officials graduated in April 2012 for an NQF 3 Local Government Accounting Certificate.
• 111 officials will continue to NQF Level 4 facilitated by SAICA/SESTO starting Sept 2012.
• 106 municipal officials/ unemployed graduates started NQF Level 6 training in April 2011 facilitated by SAICA.[18 months']
• Second NQF 6 intake started in April 2012- October 2013
16
CONT.CONT.
• The department is in a process of ensuring that all the graduates are optimally utilised in the BTO of municipalities to address Audit queries and revenue enhancement projects amongst others.
17
Dept. Finance ProjectDept. Finance Project
Project Purpose• The department launched a Municipal Financial
Support Programme in June 2012• The project aims to improve financial governance
and build technical capability in municipalities• The programme is to ensure improvement with
the submission of AFS by all 23 municipalities by end August
• The technical support will be provided to municipalities over a period of 2 years
18
Cont.
Project Deliverables/ Achievements to date• 22 B.Com graduates have been deployed to 14
municipalities since March 2012. The graduates have gone through an Internal Audit Learnership in PT
• 16 Service Providers have been deployed to 13 municipalities to assist with the preperation of AFS and Grap compliant asset registers
• All 23 municipalities submitted AFS for 2011/12 including backlogs dating from 2008/09
19
MPAC MPAC
• All 23 MPACS were established by November 2011• The department in partnership with AG conducted
induction and orientation work sessions for all 23 MPACs per district from November 2011- March 2012
• The department in partnership with PT and APAC, conduct another round of work sessions for MPACs in May-June 2012
• Annual Work plans have been provided for each MPAC for adoption and implementation by Council
• District Based forums to support MPACs will commence in DRSMDM on 28 August
20
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
PROGRESS PER DISTRICTDr Kenneth Kaunda DM• MPAC Visited the projects that are implemented in local
municipalities to check progress.• MPAC had interviews with management to discuss monthly,
quarterly and annual reporting, MPAC budget, MPAC support staff, Internal controls
• Annual report was perused and subsequent to that, the oversight report was drafted and tabled in council.
• Investigations were conducted against officials with criminal charges and the process is still unfolding.
• The entity [Development Agency] was also investigated and findings were presented to council.
21
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
City of Matlosana LM• MPAC came into effect during February 2012.• Annual program drafted and approved by council.• Nine meetings were held in the preparation of the oversight
committee.• There were several community consultations and feedback
was presented.• MPAC made clear recommendation on both the annual
report and oversight reports.• MPAC managed to have the meetings with AG, most issues
were clarified.• MPAC will engage management to discuss IDP and budget
issues.• It was indicated that Municipal Managers contract have not
yet been signed but the matter will be addressed as soon as possible. 22
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Tlokwe City Council LM
• MPAC was established on 27 November 2011.• 2012/13 work program will be tabled to council soon. • Several meetings were held since MPAC was established.• Annual report was not tabled in time therefore oversight by
MPAC was compromised.• Several reports were perused by MPAC and findings were
tabled to council.• MPAC is still engaging with the oversight report• Code of conduct and laws for MPAC is approved by council.• Sec 71 and 72 reports are not yet attended to.
23
Ventersdorp• MPAC established but not functional.• Annual workplan developed but not adopted• MPAC was not involved in the IDP/budget process.
Maquassi Hills• MPAC established but not functional• Only one meeting was held• Annual workplan developed but not adopted• MPAC was not involved in the IDP/budget process
24
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Ngaka Modiri Molema District
• Work programme adopted• Internal Audit is functional and provide adequate
support• Some members of MPACs were not invited to the
strategic planning meeting• One meeting was held• Officials are not supportive to the MPAC
25
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Tswaing• Work programme adopted• Administrative staff is supportive• Annual Report not completed• All position for section 57 are filled and 46
managers have signed performance agreements (Although they have not submitted them to dlgta)
• Shared services is working properly• Local Labour Forum (LLF) is performing well
26
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Ratlou
• Workplan was adopted on 31/11/2011• Four meetings were held• Municipal Manager provides assistance• Capital projects are not completed• Section 57 position are filled except CFO post
27
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Ramotshere• Work programme was adopted• One meeting was held• Annual Report was tabled on 31/01/2012• MPAC members are allocated functions according to
the programme• On 18/04/2012 and 02/05/2012 meeting was
postponed because the members were not forming a quorum. This was resolved with the intervention by the Speaker
• Challenges • Attendance, not forming a quorum
• Delay from Directors to submit information, councilors are in other portfolio committees 28
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Ditsobotla• MPAC is functional• Attempted to hold two meetings but were postponed • Annual report submitted• Work closely with LLF• Asked assistance from DLGTA so as to function properly
Challenges • No administrative staff• Year Plan not approved
29
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Mafikeng• Awaiting Audit Report• There is no cooperation between council and LLF• Work plan not adopted by council• They are using a provisional programme• MPAC were concerned about invitation sent to AG, LG&TA
and PT for a sitting on February, all of them did not attend. It was clarified that the invitation was not clear.
30
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Bojanala Platinum District Municipality• MPAC was established on the 24 January 2012• There is a work plan for MPAC which will be tabled to council• Public participation meetings held as follows: • 19 January 2012 = Moretele LM• 19 January 2012 = Madibeng LM• 22 March 2012 = Kgetleng LM• 22 March 2012 = Moses Kotane • There have been meetings with locals to deliberate on critical issues • Members attended most workshops including those coordinated by
dlgta• One legal adviser appointed to assist MPACChallenges• No budget to carry out MPAC duties• There is no supporting staff to carryout admin functions
31
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Moses Kotane LM• MPAC was established on the 28 October 2011• There are 11 MPAC members• MPAC drafted their first quarterly report • All members attended the MPAC induction• No support staff, a request was made to council to that
effectChallenges• No budget to carry out MPAC duties• There is no supporting staff to carryout admin functions• Not all councilors fully comprehend the roles of MPAC and
its duties. Therefore there is a need to capacitate council.• Request was made to Provincial Treasury and dlgta to
support MPAC32
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Madibeng LM• 2009/10 and 2010/11 annual report were not submitted
on time• The above reports were submitted to Auditor General
but rejected since financial matters were not included.• Annual reports were scrutinized, and recommendations
were tabled to council• After the corrections were made, the report was
approved by council and published.• Comments by the public are still to be obtained.• Resolution was taken that two officials will be supporting
MPAC with admin work.• No hearing or investigations were made or
recommended by MPAC as yet33
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
Moretele LM• MPAC members attended all workshops facilitated by
DLG&TA• Several meetings and Imbizos were held during March
2012.• MPAC consulted the community with regard to the annual
report. • Summoned different departments within municipality to
clarify and resolve various burning issues.• No budget for MPAC and currently utilizing budget of
speakers’ office.• One official was seconded to do MPAC secretariat duties.• MPAC appreciates the support by Province.
34
MPAC CONT.MPAC CONT.
• DRSM DISTRICT MUNICIPALITY– Conducted detail analysis of the SCM Reports- Supply
Chain Management Report for the period ended 31 June 2012.
– Conducted detail analysis of the Management Reports (Section 71 Report) for the period ended 30 June 2012 e.g. Departmental expenditure performance
– Planning, Budgeting, and Performance ManaConducting of the 3rd Quarterly Review of the implementation of the 2011/2012 IDP Process Plan/District gement Programme – 2012/2017.
35
CONT.CONT.
– Conducting the Quarterly Review of the performance and effectiveness of the District Public Accounts Committee (DPAC).
– Review of the Annual Work Programme– Review of the Service Delivery Budget Implementation Plan
(SDBIP)– Review of the Performance Agreements – MM and Section 56
Managers– Amendments of the Terms of Reference – change of name from
DPAC to MPAC – The DPAC members and officials attended the training on the
Oversight Role of Councillors organized by the Institute of Municipal Finance Officers (IMFO) from the 16-17 January 2012
36
CONT.CONT.
• Kagisano Molopo LM• MPAC members are lacking skills and capabilities
to deal with reporting issues.• There are nine members.• Many meetings were called but members did not
attend.• MPAC is not functional.• Three Service Providers are appointed by PT to
assist municipality to prepare AFS, therefore hope is that municipality will submit on time.
37
CONT.CONT.
Greater Taung LM• MPAC consist of ten members• Chairperson was only appointed in July 2012.• There is lack of corporation between MPAC and
administration.• There is political instability that hampers the duties of
MPAC.• Oversight committee still exist therefore there is clash
between their roles and MPAC roles. • Appointed chairperson promised that they will report on
their functionality during September 2012.
38
Cont.Cont.
Naledi LM• MPAC’s annual work plan was approved by
council.• Six meetings were held.• No reports received from MM. • No corporation between MPAC and administration.• There was a meeting with MM and MPAC
requested that in the next meeting MM must bring along reports.
• 39
Cont.Cont.
Mamusa LM• MPAC is composed of five members.• There is no assistance or support staff.• Only one meeting was held.• MPAC is not functional.• Municipality was advised report their frustrations
to MEC dlgta, Council, and District municipality. •
40
Cont.Cont.
Lekwa Teemane• MPAC was established during Sep 2011• There is no support staff provided.• Meetings are held after bi-monthly but reports are
not submitted.• Most senior managers are acting.• Audit committee does not engage MPAC when
dealing with important issues.• MPAC is considered dysfunctional.•
41
State of MPAC establishment and State of MPAC establishment and functionality cont…functionality cont…
RECOMMENDATIONS
• All MPACs to finalise their workplans and table for adoption
• Establishment and launching of District and Provincial MPAC Chairpersons Forum
• MEC for local government to review the reporting protocols of MPACs [To ensure that MPAC recommendations are tabled to before councils]
42
AUDIT REMEDIAL PLANSAUDIT REMEDIAL PLANS
• 10 municipalities that have received 2010/11 audit outcomes have completed and submitted Audit Remedial Plans to the department
• The department is in the process of finalizing section 131[2] reports for the 2010/11 audit
• The department has already submitted section 131[2] reports for 2007/08,2008/09 and 2009/10 as required by legislation.
43
OTHER ACHIEVEMENTSOTHER ACHIEVEMENTS
• The department has appointed 2 Deputy Director’s , each responsible for Operation Clean Audit and Revenue Management respectively.
• Deployed AD Municipal Finance to Lekwa Teemane as acting CFO, since February to date.He has assisted the municipality to move from disclaimer to qualified audit opinion.
44
The way forward is however best captured by our Former State President:
““Our actions as local government should make an Our actions as local government should make an invaluable contribution to the important task of creating a invaluable contribution to the important task of creating a
humane society and a humane city where we work humane society and a humane city where we work selflessly for the betterment of local communities where selflessly for the betterment of local communities where we fully understand that our responsibilities are to the we fully understand that our responsibilities are to the
people, and we are every step of the way, accountable, people, and we are every step of the way, accountable, sensitive and responsive to the needs of the people”.sensitive and responsive to the needs of the people”.
PPresident Thabo Mbeki
The The people people
own own thethe car car
The Executive Mayor drives the car for the owners -
The Municipal Manager looks after the engineof the car
THE MUNICIPALITY IS LIKE A MOTOR VEHICLE
To keep going the car To keep going the car needsneeds
OIL & PETROLOIL & PETROL
Political Leader Managers & Administrators
The Municipality needsGovernors & Administrators
• VISION• MISSION
Where the Countrydesires to be.
Using CLEAN AUDIT as
intervention
• Municipal Excellence• Democratic Governance• Basic Service Delivery• Infrastructure Development• Financial Sustainability• Economic Growth
Current reality
Current future
Little risk in small steps
DesiredDesiredfuturefuture
DesiredDesiredfuturefuture
• Municipal Excellence• Democratic Governance• Basic Service Delivery• Infrastructure Development• Financial Sustainability• Economic GrowthA big leap will
make a difference!
CLEAN AUDIT CLEAN AUDIT 20142014
MUNICIPAL EXCELLENCE
Achieve the goals of:
Municipal Excellence
Democratic Governance
Basic Service Delivery
Infrastructure Development
Financial Sustainability
Economic Growth
CLEAN AUDIT 2014
– Municipal Basic Service Delivery & Infrastructure– Local Economic Development – Good Governance, Community Participation &
WCs– Financial Viability and Management
Drivers of the Municipal Clean Audit 2014
Mayoral / Exec Comm.
Municipal Manager
Community Participation
Municipal Transformation & Organizational Development
Local Government StrategicAgenda
CLEAN AUDIT 2014
CURRENT DEVELOPMENT
REALITY
VISION AND
MISSION
VALUE SYSTEM AND CORPORATE CULTURE
CURRENTDESTINATION
FUTURE DESTINATION
CLEAN AUDIT BUS
Process Plan
Integrated Development Plan
CLEAN AUDIT
Executive Mayor / Mayoral Committee
Municipal Manager /
Senior Managers
CLEAN AUDIT
Mayoral Committee & Councillors
Senior Management and Staff
Ward Committees
Community Development Workers
Ward Field Workers
Stakeholders and Community
MPAC
CLEAN AUDIT
Key Performance Areas (KPA’s)
Strategies and Development Objectives
Key Performance Indicators (KPI’s)
Performance Targets
Projects/Programmes/Plans
Operational Business Plans
CLEAN AUDIT
Finance
Equipment / Material
Performance Management
Communication
CLEAN AUDIT
Municipal Council (Institution)
Committees
Decision-making process
Organisational Structure
Systems
Policies / Procedures
By-laws
Delegated Powers & Functions
CLEAN AUDIT
CLEAN AUDIT
Monitoring, Evaluating and Reporting
Thank you.