Presentation to the Competition Commission South
Africa
Durban International Convention Centre
27 June 2018
PRASA
Metrorail KZN – Fast facts
2
Stations and Halts 103
Rail Track ( 365Km Owned by PRASA – 240km by Transnet)
605 km
Allocated Fleet (Train Sets) 57
Operating Times (03h30 – 23h30) 20 hours
Trains Scheduled per Weekday 445
Passengers per WeekdayApprox.130,00
0
Employees:
• FCTW 46 (includes Learner
ships)
2353
KWA ZULU NATAL
Metrorail KZN - Network Diagram
3
Corridors by ClassificationA rated: Umlazi to Durban KwaMashu to Dalbridge Bridge City to Dalbridge
B rated: Stanger to Dalbridge Cato Ridge to Durban Kelso to Durban
C rated: Pinetown to Durban Wests to Durban Crossmoor to Durban
Integrated Transport Plan - EThekwini Transport Authority
4
Rail identified as backbone to the IRPTN
Known as C2 corridor
All planning done in collaboration with allcity departments e.g. human settlements,Economic Development i.e. all futurespatial development considered.
First new trains expected in first quarter of 2020
The integration of rail with other public transport providers, coupled with the modernising of the rail environment, willattract more users. Commuter concerns, such as safety , security and servicereliability are key to the process.
Proposed Suburban Rail Network Expansions in KZN
5
A number of proposals for extending and expanding the suburban rail network have been proposed as potential enhancements. These include: Bridge City Corridor: although under construction it will be important to consider the
service pattern and timetable from this new station, once completed, including the division of trains between this route and KwaMashu;
Northern Link: significant development is planned along the Northern Urban Development Corridor stretching from Durban to King Shaka International Airport and a transport corridor has been reserved through the development. Capacity constraints at Duffs Road mean that a new rail corridor could be considered and it could offering higher speeds;
Pinetown to Pietermaritzburg via Cato Ridge: whilst there is a rail line between Pinetown and Cato Ridge it is currently not utilised and the potential to re-open the line, including an extension to Pietermaritzburg should be considered; and
Umgeni Business Park: the most appropriate mechanism of improving connectivity to this strategic employment site needs to be selected from a range of options. The railway infrastructure enables a heavy rail service to be implemented as a shuttle.
KZN Strategic Rail Plan – LRT Opportunities
6
Opportunities for Connectivity to other Provinces
7
8
Gender Equity
Prasa Levels KZN Region - October
2019
KZN Current Status
Total Female Employees52% (KZN Demo) 39.2%
Total Male Employees 48% (KZN Demo) 60.8%
Female employeesExecutives/GM’s Senior Management (109-104)
2% 0.2%
Female employeesMiddle Management
5% 0.5%
Female EmployeesTechnical /scarce and or critical grades
5% 45%
Female employeesBargaining grades
5% 37.7%
2% disabilityAll racial groupsMale/female
2% 2.3%
9
Transformation
Race Group Number Percentage Male Female
African 2008 85 1151 857
Coloured 25 1 15 10
Indian 158 7 122 33
White 157 7 137 20
10
Challenges Currently Facing Rail
• Rolling Stock – The continued battle to upkeep an aged and outdated fleet is resulting in at least 50% of the fleet being unavailable for service. The obvious results are reduced capacity, cancellations and in service failures.
• Infrastructure (Perway) – The Permanent Way (Track) is riddled with speed restrictions imposed for safety reasons. 85KM of track is desperately needed to improve the Perway condition. The provision of track has to be supported with “HOT” machinery to tamp and screen ballast stone, replace sleepers and improve drainage around the track
• Vandalism and theft – The theft of copper cable and valuable metal components is constant despite attempts to vandal –proof such.
• Encroachments by informal dwellers – Becoming problematic, embankments are undermined, drainage compromised and maintenance access also compromised.
• Open Network - Largely the reason for theft and vandalism – difficult to secure and police. Also results in unacceptably high levels of injury and death to persons walking on or crossing railway lines.
• Storm damages – Poor storm water management and settlements along the rail line has led to severe damage to rails and track side equipment. Landslides and water damage has disabled some services for up to six months.
Encroachments on the Rail Reserve
11
Vandalism and Theft
12
13
Factors Resulting in a Decline in Passenger Numbers
A gradual decline, particularly since 2015 has led to the decline. Key factors are:
Reduced capacity provision through limited rolling stock available for service
Increased number of speed restrictions extending travel times on longer corridors
A marked increase in delays and or cancellations
Reduced frequencies as a result of reduced rolling stock
Lack of availability, reliability and predictability.
Storm damages crippling services for extended periods forcing commuters to seek alternatives or relocate.
14
Passenger Trips History from 2009 to March 2018
15
Potential Solutions to inefficiencies
Improve the SCM processes to create quicker turnaround without compromising the process. Appoint multiple suppliers to reduce backlog. Reduce turnaround time for wreck repairs through insurance.
Consideration needs to be given to increase and decentralise authority to fast track spending especially Capital which often results I massive underspending, but so desperately required.
Appoint contractors to replace and align track after sourcing of track. Heavy on track machinery to follow to extend the lifespan of new track – ensure maintenance cycles are upheld.
Some processes have started to remove vagrants and informal dwellers but current practice is not sustainable. All affected such as Human Settlements, social services etc to become involved in a multi disciplinary approach.
To police the network in its current state is labour intensive – current suggestions include technological advances such as electronic detection, drones and camera surveillance of the network.
16
Pricing – Comparisons to Road Based Services
Zone (Distance) KM
Single Rail Fare Bus Fare Taxi Fare
1. 0-10 7.00 5.50 9.50
2. 11-20 7.50 17.00
3. 21-30 8.50 20.00
4. 31-40 9.00 25.00
5. 41-59 10.50 25.00
6. 60-89 11.50 38.00
7. 90+ 12.50 60.00
17
Capex Trends from 2014 to 2018
0.00
20 000 000.00
40 000 000.00
60 000 000.00
80 000 000.00
100 000 000.00
120 000 000.00
140 000 000.00
160 000 000.00
Budget Total Spent
CAPEX SPENDING 2016/2017 and 2017/2018
2016/2017 2017/2018
27.07% 32.20%
PRASAwww.prasa.com
18
MOUNT VERNON
ILFRACOMBE
RE
NIS
HA
WW
PA
RK
RY
NIE
KE
LS
O
End of METRO Service
PIETERMARITZBURG
CATO RIDGEGEORGEDALE
KWA TANDAZA
KARRIDENE
SC
OT
TB
UR
GH
HA
RR
ISO
N
INC
HA
NG
A
DR
UM
MO
ND
BOTHAS HILL
PADLEY
HILLCREST
GILLITS
KLOOF
HAMMERSDALE
CLIFFDALE
UM
ZIN
TO
UMKOMAAS
UMGABABA
ILLOVO BEACH
WINKELSPRUIT
MO
NT
CLA
IR
ME
RE
BA
NK
RE
UN
ION
UM
BO
GIN
TW
INI
ISIP
ING
O
PE
LG
RIM
JACOBS FUEL FLOW
ISLA
ND
VIE
W
FY
NN
LA
ND
S
WE
ST
S
WE
NT
WO
RT
H
KIN
GS
RE
ST
UMLAZI
LINDOKUHLE
KWA-MNYANDU
ZWELETHU
CROSSMOOR
CHATSGLEN
WESTCLIFF
BAYVIEW
HAVENSIDE
NSHONGWENI
DELVILLE WOOD
KWA NDENGEZI
DASSENHOEK
SITUNDU HILLS
THORNWOOD
MARIANHILL
KLAARWATER
SHALLCROSS
BURLINGTON
CAVENDISH
BO
OT
H
CATO CREEKMAYDON WARF
DU
RB
AN
ST
AT
ION
RO
SS
BU
RG
H
UM
BIL
O
CO
NG
ELLA
DA
LB
RID
GE
BE
RE
A R
OA
D
End of METRO section
PINETOWN
SARNIA
GLEN PARK
MOSELEY
NORTHDENE
ESCOMBE
MALVERN`
POET’S CORNER
HILLARY
BELLAIR
SEA VIEW
UM
GE
NI
BR
IAR
DE
NE
GR
EE
NW
OO
D P
AR
K
RE
D H
ILL
AV
OC
A
DU
FF
’s R
OA
D
PH
OE
NIX
MO
UN
T E
DG
EC
OM
BE
TE
MP
LE
KE
NV
ILLE
EF
FIN
GH
AM
KWA MASHU
TEMBALIHLE
NEW BRIDGE
CITY LINE
TONGAAT
TONGAAT CENTRAL
FLAMINGO HEIGHTS
NYANINGA (#)
CANELANDS
VERULAM
OTTOWA
FRASER
COMPENSATION
UMHLALI
SHAKASKRAAL
TIN
LE
Y M
AN
OR
GROUTVILLE
CHARLOTTEDALE
GLEDHOW
STANGER
MO
SE
S M
AB
HID
A
SPRINGFIELD
PORT
SHEPSTONE
CLAUSTAL
WYEBANK
CLA
IRW
OO
D
KELSO
Projects : Spatial Representation Along Entire Network
18
DU
RB
AN
SPRINGFIELD
DEPOT MODERNISATION
RO
SSB
UR
GH
CTC
RESIGNALLING
STATION MODERNISATION (Phase 1)
DU
FFS
RO
AD
UMLAZI
BER
EA R
OA
D
NATIONAL STATION UPGRADE (NSUP)
NATIONAL STATION PRECINCT PLAN (NSPDP)
UMLAZI KWAMASHU
BER
EA R
OA
D
UMGENI BUSINESS PARK
KWAMNYANDU
DU
RB
AN
ISIP
ING
O
KWAMNYANDU
ROLLING STOCK FLEET RENEWAL
NATIONAL STATION IMPROVEMENT PROGRAMME (NSIP)
PINETOWN
NORTHDENE
GROUTVILLE
KWA TANDAZA
BAYVIEW
BURLINGTON
WINKELSPRUIT
PA
RK
RY
NIE
STANGER
FY
NN
LA
ND
S
MALVERN`
BELLAIR
HAMMERSDALE
SC
OT
TB
UR
GH
UMGABABA
VERULAM
CROSSMOOR
CHATSGLEN
HAVENSIDE
PE
LG
RIM
HILLARY
MOSELEY
MOUNT VERNON
CHARLOTTEDALE
OTTOWA
COMPENSATION
FRASER
PH
OE
NIX
WESTCLIFF
SHALLCROSS
19