Jindal Steel & Power Limited 11
Q3 Performance Highlights FY 14Jindal Steel and Power Ltd
28thJanuary, 2014
8/11/2019 Presentation Q3 FY 13 14
2/47
Jindal Steel & Power Limited 2
This presentation contains certain forward looking statements concerning
JSPLsfuture business prospects and business profitability, which are subject to anumber of risks and uncertainties and the actual results could materially differ
from those in such forward looking statements.
The risks and uncertainties relating to these statements include, but are not
limited to, risks and uncertainties regarding fluctuations in earnings, our ability
to manage growth, competition (both domestic and international), economicgrowth in India and the target countries for exports, ability to attract and retain
highly skilled professionals, time and cost over runs on contracts, our ability to
manage our international operations, government policies and actions with
respect to investments, fiscal deficits, regulations, etc., interest and other fiscal
costs generally prevailing in the economy. Past performance may not be
indicative of future performance.
The company does not undertake to make any announcement in case any of
these forward looking statements become materially incorrect in future or
update any forward looking statements made from time to time by or on behalf
of the company.
DISCLAIMER
8/11/2019 Presentation Q3 FY 13 14
3/47
Jindal Steel & Power Limited 3
Presentation Outline
Executive Summary
Industry Developments
Highlights
Operational Performance
Financial Performance
Projects Update
Q3-FY 14
8/11/2019 Presentation Q3 FY 13 14
4/47
Jindal Steel & Power Limited 4
Presentation Outline
Executive Summary
Industry Developments
Highlights
Operational Performance
Financial Performance
Projects Update
Q3-FY 14
8/11/2019 Presentation Q3 FY 13 14
5/47
Jindal Steel & Power Limited 5
Executive Summary : Q3 FY 13-14 Results
JSPL barring the challenge of virtual nil growth in steel industry; sagging power demand &
merchant rates and additional burden of depreciation & interest costs caused by majorcapacity expansion projects undertaken during 2013-14, put up an impressive
performance during Q3 FY14.
JSPL Consolidated turnover during Q3FY14 grew by 8% and 12% compared to Q2FY14 and
Q3FY13 respectively. The companys Profit after Tax (PAT) recorded an increase of 23%over the previous quarter but was lower by 36% compared to the same quarter last year.
EBITDA levels in Q3 FY14 increased to 31.6% compared to 29.2% in Q2 FY14.
JSPL (Standalone) saw its volume grow by 4% over Q3 FY13, while in value terms its
turnover marginally dropped by 1% due to a changed product mix. Steel Businesss NetPrice Realization increased by 2.5% and 4% over Q3 FY13 and Q2 FY14 respectively. The Q3
FY14 PAT of JSPL (Standalone) increased by 42% compared to the previous quarter this
year but it fell short of the same quarter in FY13 by 30% due to increased burden of
interest & depreciation of the recently commissioned Angul Steel Plant.
8/11/2019 Presentation Q3 FY 13 14
6/47
Jindal Steel & Power Limited 6
The Company maintained its tempo of growth in both exports and retail business. While
exports in Q3 FY14 grew by 9% in volume terms, retail business grew by a whopping 78%compared to the previous quarter. The Company by the end of December 2013 has spread
its distributor network to cover the entire country and had appointed 41 distributors & 875
dealers.
During Q3 FY14 JSPL further commissioned new downstream units and introduced several
new product lines. The Company intends to take capital upgradation work at its Raigarh
facility during Q4 FY14. Production and dispatches from the Steel Melt Shop (SMS) and
Plate Mill in Angul also witnessed major growth. The Companys continued focus on
CapitalEfficiencyprogramme saw impressive reduction in inventories which dropped to
all time low and debtors decline by 20% compared to Q2 FY14.
Jindal Power Ltd (JPL), JSPL Groups subsidiary saw another quarter of high operational
performance with PLF at 95.8% compared to 81% of Q3FY13. JPLs turnover and PAT
increased by 9% and 4% respectively over Q3 FY13. It also completed the second 600 MW
unit of Tamnar Phase II and is all set to complete the third unit before March 31, 2014.
Executive Summary : Q3 FY 13-14 Results
8/11/2019 Presentation Q3 FY 13 14
7/47Jindal Steel & Power Limited 7
JSPL acquired a majority stake in NRE Gujarat (GNRE), a company based in Australia
producing Prime Quality Hard Coking coal, which will further enhance JSPLsinput materialsecurity. Integration of GNRE however negatively impacted JSPLsPAT by Rs 69 Crores
JSPL Global Ventures with the exception of Gujarat NRE, performed well with revenue in Q3
growing by 71% compared to the same quarter in FY13. CompanysOman unit sold a record
quantity of nearly 500,000 MT of HBI which was 48% higher than the volume sold in Q3
FY13. Oman operations turnover in Q3 FY14 at US$ 171 million was 45% higher than Q3
FY13. Production volume of Anthracite (ROM) in JSPLs South African mines increased by
21% on Q3 to Q3 basis.
JSPLs Angul Steel project remains on track, although small delays were caused due to
external interference with the execution of water supply works. 1st Phase of Angul Project
will be fully ready before the end of Feb 2014. New Pelletization plant of 4.5 MPTA is
progressing well and will go into commercial production by the end of Feb 2014.
Executive Summary : Q3 FY 13-14 Results
8/11/2019 Presentation Q3 FY 13 14
8/47Jindal Steel & Power Limited 8
Presentation Outline
Executive Summary
Industry Developments
Highlights
Operational Performance
Financial Performance
Projects Update
Q3-FY 14
8/11/2019 Presentation Q3 FY 13 14
9/47Jindal Steel & Power Limited 9
1582
1059
779
81
166109 119
26
1529
999
725
77
169111 122
24
World Asia China India EU CIS North America Middle East
Global Steel Production (Mt)
Jan-Dec '13 Jan - Dec '12
3.5%
6%
7.5%
5.1%6.9%
1.8%
1.9% 1.9%
Source: WSA
Global Steel Industry
8/11/2019 Presentation Q3 FY 13 14
10/47Jindal Steel & Power Limited 10
Indias steel production (Jan-Dec13) up by5.1% (y-o-y)
Indias Production in Q3 FY14 (Oct-
Dec13) up by 3.3% (vs Q3 12-13)
Rest of the World (other then China &
India) Steel Production (Jan Dec13)
down by 0.7% (y-o-y)
For H1 (Jan-Jun13), Rest of Worlds
production down by 3.3% (vs H1 12), while
for H2 (Jul-Dec13) production up by 2.1%
(vs H2 Jul-Dec 12)
5,600
5,800
6,000
6,200
6,400
6,600
6,800
7,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
India ('000 MT)
FY 12 FY 13
50,000
52,000
54,000
56,000
58,000
60,000
62,000
64,000
66,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Rest of the World ('000 MT)
FY 12 FY 13
5.8%
2.4%
1.6%
6.2%3.6%
4.6%
Source: WSA
Global Steel Industry
8/11/2019 Presentation Q3 FY 13 14
11/47Jindal Steel & Power Limited 11
Crude Production: During April-Dec 13, crude steel production was 59.332 million tonnes (mt), a growth of
1.8% year-on-year (y-o-y).
Imports: Import of total finished steel showed a southward trend, declining by 29.2% yoy in April- Dec13 (y-o-
y)..
Exports:Export of total finished steel was up by 9.5% during April-Dec 13 (y-o-y)
India emerged as a net exporter of total finished steel in December 2013 as well as April- December 2013
Steel Demand: Indias real consumption of total finished steel was up by 0.5% in April-Dec 13 (y-o-y), impacted
by the slowdown in the domestic economy (as reflected in the poor performance of the IIP and infrastructure
index, both)
Steel Industry impacted by factors like slowdown in domestic economy, exchange rate volatility, relative prices,
global downswing and bilateral agreements among othersSource: BI - JSPL
How the Indian Industry Fared
Indian Steel Scene: April Dec13
Qty (MT) % Change*
Crude Steel Production 59.33 1.8
Import 4.09 (29.20)
Export 4.14 9.5
Real Consumption 53.79 0.5* over same period of last year
8/11/2019 Presentation Q3 FY 13 14
12/47Jindal Steel & Power Limited 12
Developer has to tie up 65% of installed capacity through competitive biddingand upto 35% under regulated tariff as per specific host state policy
It would be one time and limited to 15 projects which are located in the States
having mandatory host State power tie up policy of PPAs under regulated tariff Max time period is 60 months instead of 36 months from date of import for
furnishing the final mega certificates to tax authorities
Amending Mega Power Policy 2009 for provisional mega power projects
9 units out of 24 TPPs with Tapering linkages within 78000 MW to get coalsupplies for a period of 3 years (Till 30.09.2016) or for the period they wereaffected by the Go No-go Policy thru FSA
CCEA has approved the supply of coal to 9 out of 24 units for the delay indevelopment of coal blocks due to Go No-Go by MoEF
Power Sector Recent Developments
8/11/2019 Presentation Q3 FY 13 14
13/47
Jindal Steel & Power Limited 13
Southern grid connectivity was achieved 3 months ahead of schedule with thecommissioning of 765 Kv Raichur-Sholapur Transmission line on 31st December,2013
Indian power system becomes one of the largest operating synchronous grids inthe world
Southern Grid synchronously connected with the National PowerGrid
9 applications have been received for Odisha UMPP and 8 for Cheyyur (TamilNadu), the bids for which will be opened on 26th February, 2014
These projects are also being seen as a test case for the new design, build, finance,operate and transfer (DBFOT) model; unlike the earlier build, own, operate (BOO)model. It will create a lot of financing problems.
PFC has started the bidding process for 2 UMPPs in Odisha &Tamil Nadu, ending the 5 year of uncertainty.
Power Sector Recent Developments
8/11/2019 Presentation Q3 FY 13 14
14/47
Jindal Steel & Power Limited 14
159,794
4,780
39,89329,463
233,930
-
50,000
100,000
150,000
200,000
250,000
138,21320,381
1,200
4,780
39,893
29,463
Coal Gas Diesel Nuclear Hydro RES
Power Scenario Installed Capacity(as on 31st Dec2013)
(in MW)
(in MW)
Source: CEA
(in GW)
59%9%
1%
2%
17%13%
Coal Gas Diesel Nuclear Hydro RES
148159
174
200
223234
0
50
100
150
200
250
FY09 FY10 FY11 FY12 FY13 Q3FY14
8/11/2019 Presentation Q3 FY 13 14
15/47
Jindal Steel & Power Limited 15
94
102
112
132
152160
77.20% 77.50%75.07%
73.32%
69.95%
64.62%
50.00%
55.00%
60.00%
65.00%
70.00%
75.00%
80.00%
0
20
40
60
80
100
120
140
160
180
FY09 FY10 FY11 FY12 FY13 Dec'13
Inst.Cap (in GW) PLF (in %age)
Growth in Thermal Capacity Vs PLF%
Source: CEA
8/11/2019 Presentation Q3 FY 13 14
16/47
Jindal Steel & Power Limited 16
Presentation Outline
Executive Summary
Industry Developments
Highlights
Operational Performance
Financial Performance
Projects Update
Q3-FY 14
8/11/2019 Presentation Q3 FY 13 14
17/47
Jindal Steel & Power Limited 17
6.5% growth in Production volume of Q3 last year
10.8% growth in Production volume over Q2 FY14
2.5% growth in Sales volume over Q3 last year
2% growth in NSR over Q3 last year
4% growth in NSR over previous quarter
-
1.02.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14
Sales (in Lakh, MT)
Production, Sales & NSR - Steel
6.2
6.46.6
6.8
7.0
7.2
7.4
7.6
7.8
8.0
8.2
Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14
Production of Crude Steel (in Lakh, MT)
8/11/2019 Presentation Q3 FY 13 14
18/47
Jindal Steel & Power Limited 18
18% increase in Generation (Q3
FY14 Vs Q3 FY13)
4% increase in Realization (Q3 FY14
Vs Q3 FY13)
Generation, Sales & NSR JPL Power
-
500
1,000
1,500
2,000
2,500
Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14
Generation (MU)
0.0
20.0
40.0
60.0
80.0
100.0
120.0
Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14
PLF in %age
0
0.5
1
1.5
2
2.5
3
3.5
4
Q1 FY 13 Q2 FY 13 Q3 FY 13 Q4 FY 13 Q1 FY 14 Q2 FY 14 Q3 FY 14
NSR (Rs/Unit)
8/11/2019 Presentation Q3 FY 13 14
19/47
Jindal Steel & Power Limited 19
19
104
140
263
119138 150
406
0
50
100
150
200250
300
350
400450
Q1 Q2 Q3 TOTAL
Export Sales (in MT)
FY - 2012-13 FY - 2013-14
7% growth in Export Sales in Q3 (vs Q3 12-13)
54% growth in Export Sales in Apr - Dec (vs Apr Dec 12-13)
Export of Steel
8/11/2019 Presentation Q3 FY 13 14
20/47
Jindal Steel & Power Limited 20
Oman
Production HBI (MT): 377,468 Sales (MT): 498,749
South Africa Production HBI (MT): 220,634
Sales (MT): 182,199
Overseas Operations Q3 Update
Gujrat NRE Coke Production Coal (MT): 217,000
Sales (MT): 187,000
Mozambique Production Coal (MT): 95,334
Sales (MT): 99,411
8/11/2019 Presentation Q3 FY 13 14
21/47
Jindal Steel & Power Limited 21
Presentation Outline
Executive Summary
Industry Developments
Highlights
Operational Performance
Financial Performance
Projects Update
Q3-FY 14
8/11/2019 Presentation Q3 FY 13 14
22/47
Jindal Steel & Power Limited 22
Standalone Financials Q3 & 9 months
Particulars Ru ees in Cr. 31.12.2013 30.09.2013 31.12.2012 Y ON Y Q ON Q
Turnover-Total 3,777 3,656 3,821 -1% 3%
-Export 896 930 595 50% -4%
EBITDA 1,210 983 1,278
PBT 546 352 740 -26% 55%
Profit after Tax 366 257 520 -30% 42%
Cash Profit 730 582 814 -10% 25%CAPEX 1,614 1,571 1,411
For the uarter endin %
Particulars FY %
(Rupees in Cr.) 31.12.2013 31.12.2012 2012-13 Y ON Y
Turnover-Total 10,858 10,741 14,955 1%
-Ex ort 2,489 1,260 1,928 98%EBITDA 3,041 3,576 4,613PBT 1,216 1,601 2,098 -24%
Profit after Tax 861 1,115 1,462 -23%
Cash Profit 1,867 1,971 2,658 -5%
CAPEX 4,413 3,847 4,667
For the 9 Month ending
8/11/2019 Presentation Q3 FY 13 14
23/47
Jindal Steel & Power Limited 23
Consolidated Financials Q3 & 9 months
Particulars
(Rupees in Cr.) 31.12.2013 30.09.2013 31.12.2012 Y ON Y Q ON QTurnover-Total 5,377 4,984 4,802 12% 8%
EBITDA 1,701 1,457 1,790
PBT 819 627 1,147 -29% 31%
Profit after Tax 559 455 870 -36% 23%
Cash Profit 1,093 907 1,285 -15% 20%
CAPEX 2,548 3,571 2,660
For the Quarter ending %
Particulars FY %
(Rupees in Cr.) 31.12.2013 31.12.2012 2012-13 Y ON Y
Turnover 14,901 14,158 19,807 5%
EBITDA 4,463 5,079 6,669PBT 2,116 2,892 3,833 -27%
Profit after Tax 1,515 2,159 2,912 -30%
Cash Profit 2,929 3,367 4,593 -13%
CAPEX 8,688 7,496 8,983
For the 9 Month ending
8/11/2019 Presentation Q3 FY 13 14
24/47
Jindal Steel & Power Limited 24
Key Ratios
Standalone 2013-14 2013-14 2012-13 2012-13
Ratio (%) Q3 Q2 Q3 Annual
EBITDA to turnover 32.03 26.90 33.45 31.04
Profit before tax to turnover 14.45 9.62 19.37 14.03
Profit after tax to turnover 9.68 7.02 13.62 9.78
Debt Equity Ratio 1.74 1.72 1.65 1.66
Net Debt (Rs. in Cr.) 22,296 21,806 19,562 20,440
Consolidated 2013-14 2013-14 2012-13 2012-13
Ratios (%) Q3 Q2 Q3 Annual
EBITDA to turnover 31.63 29.23 37.27 33.67
Profit before tax to turnover 15.23 12.59 23.89 19.35
Profit after tax to turnover 10.40 9.13 18.12 14.70
Debt Equity Ratio 1.52 1.30 1.15 1.15
Net Debt (Rs. in Cr.) 31,602 29,947 23,435 24,418
*Net Debt as on 31stDecember, 2013 excludes debt of Rs. 2530 Cr. on the
Balance sheet of Gujarat NRE Australia
i O li
8/11/2019 Presentation Q3 FY 13 14
25/47
Jindal Steel & Power Limited 25
Presentation Outline
Executive Summary
Industry Developments
Highlights
Operational Performance
Financial Performance
Projects Update
Q3-FY 14
8/11/2019 Presentation Q3 FY 13 14
26/47
Jindal Steel & Power Limited 26
JSPL Consolidated & Standalone
JSPL Consolidated turnover in Q3FY14 grew by 8% and 12% compared to Q2FY14 and Q3FY13
respectively.
Consolidated PAT recorded an increase of 23% over the previous quarter
EBITDA levels in Q3 FY14 increased to 31.6% compared to 29.2% in Q2 FY14.
JSPL Standalone sales volume grow by 4% over Q3 previous year
SMS commissioned in Angul
Improvement in Steel prices (4% growth over previous quarter)
6.5% growth in Production volume of Q3 last year
10.8% growth in Production volume over Q2 FY14
Retail Sales register 78% growth over previous quarter
Performance Highlights
8/11/2019 Presentation Q3 FY 13 14
27/47
Jindal Steel & Power Limited 27
Performance Highlights
Jindal Power Ltd
JPLsturnover and PAT increased by 9% and 4% respectively over Q3 FY13
PLF at 95.8% compared to 81% of Q3FY13
Station achieved Generation of 2116 Mus in Q3 FY14 as compared to 1790 Mus in Q3 FY13
2 x 600 MW units synchronized
8/11/2019 Presentation Q3 FY 13 14
28/47
Jindal Steel & Power Limited 28
Performance Highlights
Oman
Oman clocked record sales volume in Q3 FY14 498,750 MT (36% increase over Q2 13-
14 and 47% increase over Q3 last year)
Mozambique
Allocation for movement of 2,50,000 Tons per quarter obtained on Sena Line
JSPL MozambiquesFirst coal loaded train from Moatize to Beira moved on 07/11/2013
95334 MT coking coal production in Q3 FY13-14 compared to 67120 MT in Q2 FY13-14
99400 MT sales achieved in Q3 FY 13-14 (96,900 MT sold in Q2 FY13-14)
P t ti O tli
8/11/2019 Presentation Q3 FY 13 14
29/47
Jindal Steel & Power Limited 29
Presentation Outline
Executive Summary
Industry Developments
Highlights
Operational Performance
Financial Performance
Projects UpdateQ3-FY 14
8/11/2019 Presentation Q3 FY 13 14
30/47
Jindal Steel & Power Limited 30
Angul SMS & Slab Caster
8/11/2019 Presentation Q3 FY 13 14
31/47
Jindal Steel & Power Limited 31
Angul SMS & Slab Caster
8/11/2019 Presentation Q3 FY 13 14
32/47
Jindal Steel & Power Limited 32
Angul SMS & Slab Caster
l 5
8/11/2019 Presentation Q3 FY 13 14
33/47
Jindal Steel & Power Limited 33
Angul 6x135 MW CPP
8/11/2019 Presentation Q3 FY 13 14
34/47
A l C l G ifi i U i 3
8/11/2019 Presentation Q3 FY 13 14
35/47
Jindal Steel & Power Limited 35
Angul Coal Gasification, Unit 3
A l
8/11/2019 Presentation Q3 FY 13 14
36/47
Jindal Steel & Power Limited 36
Angul UNIT 6PHENOSOLVAN & STORAGE TANK
A l DRI Pl t
8/11/2019 Presentation Q3 FY 13 14
37/47
Jindal Steel & Power Limited 37
Angul DRI Plant
REDUCTION FURNACE TOWER & HIGH ANGLECONVEYOR
8/11/2019 Presentation Q3 FY 13 14
38/47
JPL P i Vi f 4 600 MW
8/11/2019 Presentation Q3 FY 13 14
39/47
Jindal Steel & Power Limited 39
JPL - Panoramic View of 4x600 MW
U it 1 600 MW
8/11/2019 Presentation Q3 FY 13 14
40/47
Jindal Steel & Power Limited 40
Unit 1 600 MW
Unit 1Boiler Front ViewUnit 1Boiler to EPS
Unit 1EPS Inlet Unit 1Main oil Tank
U it 2 600 MW
8/11/2019 Presentation Q3 FY 13 14
41/47
Jindal Steel & Power Limited 41
Unit 2 600 MW
Unit 2Boiler Rear view Unit 2RHS Mill Bay
Unit 2 - TG Unit 2 - Tipper
U it 3 600 MW
8/11/2019 Presentation Q3 FY 13 14
42/47
Jindal Steel & Power Limited 42
Unit 3 600 MW
U-3 Transformer YardU-3 Main Oil Tank
U-3 TGU-3
Boiler Front View
8/11/2019 Presentation Q3 FY 13 14
43/47
Oman 2 MTPA SMS
8/11/2019 Presentation Q3 FY 13 14
44/47
Jindal Steel & Power Limited 44
Oman 2 MTPA SMS
EAF Area 9 Meter Platform Scrap Transfer Car
FTP Area
8/11/2019 Presentation Q3 FY 13 14
45/47
Oman 2 MTPA SMS
8/11/2019 Presentation Q3 FY 13 14
46/47
Jindal Steel & Power Limited 46
SMS Overall Progress Photo
Oman 2 MTPA SMS
8/11/2019 Presentation Q3 FY 13 14
47/47
THANK YOU
For any information please contact: -
D.BalasubramanyamHead of Investor Relations
Tel: - 011-26739166
Mobile: - 8130755166
Email: - [email protected]
Ms. Pallavi KumariInvestor Relations
Tel : - 011-26739165
Mobile:-8800094171
Email: - [email protected]
mailto:[email protected]:[email protected]