PresentationOver ERP
toET BATCH-2008
Dated : 10 September 2008
MANU KHARE
ABHISHEK SRIVASTAV
NTPC,Limited
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 2/61
• What is ERP?
• Major Players
• Customers
• Process Improvement By ERP : Example
• ERP- A Change Process
• Coverage Of ERP
• ERP – Functional and Technical Viewpoint
• Fundamental Design Principle and Key Objectives
• Modules Under ERP and their functionalities
• A typical Network Infrastructure-NTPC Network for ERP
•Project Methodology and Deliverables
• Project Organization & Role of Team Members
• Critical Success Factors for ERP
• Training
• Working With SAP
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 3/61
Enterprise Resource Planning?
Enterprise Resource Planning (ERP)is a multi-module integrated applicationpackage that help manage and automatea business. A single database provides
access to all applications, programs andservices within an enterprise. ERPincorporates all elements of a business,from financial processes to maintenance
and marketing activities, into a unifiedwhole that operates more effectively andefficiently.
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 4/61
PurchasingPurchasing
PayrollPayroll
Stores &Stores &InventoryInventory
FinanceFinance
ServicesServices
H RH R
Maintenance
Costing
MIS
Budgeting
Project Systems
A Typical IT Application Story…
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 5/61
From Functional Silos…
Planning Finance Consultancy
Engineering and R & D Production Sales & Distribution
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 6/61
To an Integrated Enterprise….
Planning
Finance
Consultancy
Production
Sales & DistributionEngineering and R & D
Central
Database
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 7/61
The Players
SAP R/3 - still must maintain mainframe architecture of large R/2user population. Strong finance and accounting. By far the largest
vendor (approx. 30% market share).
Baan - known for manufacturing, distribution, process modelingmodules - web and Internet.
PeopleSoft - known for human resource package.
Oracle - simplest product to install and support. Recentlyadvertising flow manufacturing enhancement.
J.D. Edwards - SCM module
Manugistics - Distribution - truck loading and routing focus.
i2 Technologies - Rhythm product - coordination of flow orientedmanufacturing. Comprehensive forecasting module.
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 8/61
SAP
Systems, Applications and Products in Data Processing,
(SAP)
The name of a company - SAP AG**
The name of a software - SAP R/3
**AG stands for Aktiengesellschaf t (After 2005 general meeting)
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 9/61
SAP Customers in India
Mid-market partnerships…
Discrete Manufacturing flagship partnerships…
Process Manufacturing flagship partnerships…
Consumer & Retail flagship partnership…
Services industries flagship partnerships…
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 10/61
SAP Customers – Public Sector in India
NTPC,Ltd
Delhi Metro Rail Corporation Ltd.
Oil & Natural Gas Corporation of India Limited.
Indian Oil Corporation of India Limited.
Bharat Petroleum Corporation Limited.
Bharat Heavy Electricals Limited
Videsh Sanchar Nigam Limited.
Garden Reach Ship Building
Ship Building Corporation - Vizag
Gujarat Industry Power Co. Limited – Baroda
Bharat Electronics Ltd
General Insurance Corporation of India
Chattisgarh State Electricity Board
Gujarat State Petroleum Corporation
Central Power Distribution Company of Andhra Pradesh
PTC India Ltd (formerly known as Power Trading Corporation of India.)
National Housing Bank
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 11/61
Customers in Engineering & Construction
Plant Contracting & ConstructionPlant Contracting & Construction HomebuildingHomebuilding
Shipbuilding &
TransportationEquipment
Shipbuilding &
TransportationEquipment
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 12/61
SAP Customers – Engineering and Construction
Hindustan Construction
ABB Ltd
ALSTOM Power Sweden
Austrian Energy & Environment AG
Balkan Ro Trade and Construction
Bechtel Corporation
Bharat Heavy Electricals Limited
Bombardier Transport Inc.
Capstone Turbine Corporation
Hyundai Engineering & Construction
SCHNEIDER ELECTRIC INDUSTRIES SA
Halliburton Energy Services.
Walter Industries Inc
Mitsui Engineering & Shipbuilding
Larsen & Toubro Limited
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 13/61
Elapsed Time:
20 days
Existing Process
Check
Common
spares status
Raise Indent
requisitionGet HOD
Approval
Get FQA/FES
Clearance
Get MPIC
Clearance
Req. validation
by screening.
comm
Get Budget
Certification
High Value
Yes
No
Send PR to
C&MUser
FQA/FES
MPIC
S.C.
F&A
Common Spares D/B
Process : Indent Requisition of Spares
Can be
Eliminated in
case, yearly
Spares Budget
is approved
once.
Elapsed Time:
40 daysCan be eliminated, once
a central database is available
User checks against item/value
Budget
Approved Yearly Maint. Budget
•Check stock across NTPC•Check Item
Budget•Check Value
Budget•Assess Technical
Spec.
•AssessRegistered
Vendors•Assess LPP
across NTPC
Raise Indent
requisitionGet HOD
Approval
CENTRAL
DATABASE
Yearly
MaintenancePlan Approval
Yearly
ProcurementPlan Approval
Send PR to
C&M
Elapsed Time:
few hours
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 14/61
ERP involves Change
Change in Processes
Change in Roles and Responsibilities
Change in organization’s working culture – Department
to Process Perspective
Change in attitude and mindset of people
Change Management Strategy would focus on bringing about above
changes in Organisation smoothly
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 15/61
An extensive change mangement concept ensures theacceptance and motivation of the end users
= rejectionvision skills tools action planincentives+++ ++
= fearvision communi-cation
tools action planincentives+++ ++
=
frustration
vision communi-cation
skills action planincentives+++ ++
= slowchange
communi-cation
skills tools action planvision +++ ++
=confusio
n
communi-cation
skills tools action planincentives+++ ++
= chaosvision communi-cation
skills tools incentives+++ ++
communi-cation tools action planincentivesvision + ++ ++ skills = real change
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 16/61
Senior Management Commitment &
Participation Readiness to Change
Best People Full Time
Good Project Management Skills
Using Standard Functionality
End User Empowerment
Project Management
Project Review & Quality Audit
Teamwork
Sound Methodology
Able Implementation Partner
Infrastructure Availability
Communication
Critical Success Factors for ERP Project
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 17/61
Action Points to facilitate Change
Workshop
Training of Change Agents to facilitate change in the organization
Facilitate awareness of ERP in employees by Change Team conducting seminars
CMD/Directors/EDs addressing employees during their visits
Newsletters, Intranet, Cable TV
Competitions
Team Vision Workshops
Process Engagement Workshops
Benefit Realization Workshops
Change Impact Analysis
Role Mapping
Post Go Live Reviews
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 18/61
Who initiates Change?
ChangeManagement
Team
Process
OwnersProcess
OwnersProcess
Owners
ERP
Project
Team
Change
Enablers
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 19/61
Coverage of ERP
Corporate
PlanningProjects
Engineering
and Q A
C o ntracts O pe ratio ns M aintenance C o m m ercia l
Consul tancy
A sh Utilisation
Environment
R & D, TQM , IT
Safety, Security, Vigi lance
Corporate Comm unication
Site
Procurement
& Materials
F u el
M an ag em en t
Employee H eal th
Legal & Se cretar ial
Rehabil i tation and Resettlemen
Finance, Hum an Resources
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 20/61
Coverage of ERP
In addition SAP will also include the following Business Intelligence
Knowledge Management
Workflow
Document Management System
Xchange Infrastructure (XI) for integration with other packages / legacy
applications Capability to support future business areas of NTPC including Coal
Mining, Power Distribution, Power Trading etc. (Not included in the currentpackage cost)
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 21/61
What is an ERP - Functional View
Covers Processes across multiple functions through a single
system
Operations & Logistics
Materials and Contracts Management
Maintenance Management
Project Management
Human Resources & Payroll
Personnel Administration
Personnel Development
Administration Financials, Planning, Budgeting, Control & Audit
Cross-Application Components
Workflow
Document Management System
System Management Tools
System Administration
Security
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 22/61
What is an ERP – Technical View
A database application which supports the running of Business
Processes
Configurable – Tailoring without writing any code
Extendable – by writing additional code without modifying standard
code
Set of master data for various objects – materials, resources,
suppliers etc. that is used for all processes
The applications sit on a OPEN “application server” that can be usedfor writing new applications
Consists of standard tools and technologies for developing
interfaces
Contains standard data migration tools
Has built-in comprehensive Security and Access Controls
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 23/61
Central Themes / Fundamental Design Principles of SAP
Data & Information Centralize storage
Secure Access Adhere to Data & Information Exchange Standards
Processes / Operations Integration of Processes
Run from Anywhere
Secure Access
Standardize as much as feasible
Offer Multiple Options to suit customer requirements
Support Universally accepted practices in different functions (Accounting,Materials Management, Project Management)
Technology Platform (OS & DB) independent
Open based on Standards
Access from any standard device
Secure Access
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 24/61
SAP Solution - An integrated system design
Finance
Enterprise
Management
Asset
Management
Budgetary
Control
Human
Resources
Maintenance
Management
Management
Information
System
Project
Management
Material
Management
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 25/61
Addresses Key Objectives
Improve Efficiency
Improve efficiency through better processes
and practices
Faster ROI on IT investments
Solutions aimed at customer’s pain points
Leverage existing application, through integration wherever possible
Better visibility
Business performance management
“Real-time” (event-driven) integrated extended organization
Actionable Knowledge
Solutions that adapt to changes
Solutions that support and enable transformation
Solutions that are focused on improving efficiency in administration
and logistics
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 26/61
eb browser access
singlesign-on
Access from Anywhere Anytime
legacy
Portalindustry-specific
role-basedpersonalizeddrag & relate
Market-place
R/3FI CO
HR
CRM
SEMSupplyChain BW
mySAP.com solutions
non mySAP.com
Partner
SAP
Cock-pits
BWProductionReports.lnk
NTPC.URL
M d l i SAP
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 27/61
Modules in SAP
Fi i l M t
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 28/61
Financial Management
General Ledger
Legal Consolidation
Accounts Receivables
Accounts Payable
Asset Accounting
Budgeting
Overhead Cost Controlling
Activity Based Costing
Cash Management
Treasury
Funds Management
Payroll
Check Printing
Parallel Accounting
Analytics
Expense Management
Billing
Profitability Analysis
Streamlines information
control, analysis, and
delivery
Enables performance
planning, measurement,
and management
Optimizes the financial
supply chain
Most comprehensive,functionally-rich solutionon the market
Market-leading solutionsand customers in allindustries
Reliable, proven businesspartner with solution andindustry expertise
P t d M t i l M t
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 29/61
Procurement and Material Management
Initiation Planning & Approval
ProjectExecution
Closing
ExecuteCheck deliverables of the supplier & sub
contractor based on contracts & confirm
using service entry sheets
Purchase Requisition
RFQ & Purchase Orders
Tendering
Supplier Evaluation & Blacklisting
Delivery Schedules
Approvals & Workflows
Service Masters
Warehouse Management
Goods Movements
Shelf Live & Status
Physical Inventory Audits
Quality Inspection
Supplier Payments
Knowledge Management
Contract Management
Supplier Collaboration
Define
Define the project requirements.Select Source & complete detailing
Monitor Monitor progress & payments as
per schedule.
Workflows
E P t C t
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 30/61
E-Procurement Components
22
66
44
33 Consolidate
Requirement
Payment Gateway
EBP
11
Tender Award
Bid opening &
Comparision
Supporting
documents
Upload Bid
Download Tender
Publish
Requirements
55
ERP
Reverse Auction
Tender fee payment
77
88
99
(Secure Network)
Enhanced Supply base
Reduced Spend
P j t M t
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 31/61
Project Management
Initiation Planning & Approval
ProjectExecution
Closing
Life-Cycle Data ManagementFull integration into the Document
Management System of mySAP Life-Cycle
Data Management; assignment of allvarious documents supported by all DMS
functions (i.e. versioning, vaulting)
Project Initiation
Project Team
Project Estimation & Budgeting
Project Planning & Scheduling
Capacity Management
Project Procurement
Project Production
Project Costing
Project Document Distribution
Project Confirmations
Project Claims
Project Progress Tracking
Multi -Project Management
Project Archiving
Project Reuse
Project Base lining & Simulation
Project Status Management
Integrated Viewing /
Maintenance
All originals of assigned document
masters can be viewed/maintaineddirectly from the project’s maintenance
environment.
Flexible Search/E-PublishingProject documents can be searched by
various search engines and can also be
published for external access on theInternet.
Project – EH&S
Maintenance Management
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 32/61
Maintenance Management
Work Force Management
Location & Asset Mapping
Maintenance Planning & Scheduling
Budgeting & Sanctions
Tools & Documents
Complaint Management
Warranty & AMC
Contracts & Subcontracting
Spares ManagementWork Clearance
Preventive / Predictive / Breakdown /
Shutdown Maintenance
Valuation & Status Management
Mobile Device
GPS Interface
Equipment History
Meter Reading & Counter Based
Early Warning System
Objects
Orders /Notifications
Costs Downtimes
H i s
t o r y
Time- /Materialconfirmation
Technicalcompletion
Order settlement
C o m
p l e t i o n
Internal /Externalresource-planning
Release / Print
Control /Execution
P M
O r d
e r
Techn. Object
Conditiondescription
Item data
Activities /Tasks
Priorities
N o t i f i c
a t i o
n
Life Cycle Data Management
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 33/61
Life-Cycle Data Management
Document managementVersions and structures
Approval and change management
Open interfaces: computer-aided design,
Microsoft Office, and so on
Product master and structure managementProduct master management
Product structure management
Routings
Classification and variant configuration
Specification and recipe managementSpecification management (for example, ingredients,products, and packaging)
Multilevel recipe and formula management (for example,S88 compliance)
Service and maintenance structuremanagement
Change and configuration managementEngineering change request/engineering change order
Order change management
Configuration management
Product data replication
Data
Management
mySAP HR A Total Integrated HCM Solution
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 34/61
mySAP HR – A Total, Integrated HCM Solution
Pre-defined Key Performance
Indicators
SAP Business Warehouse
Integration
Expert Finder
Manager Self-Service
Employee Self-Service
Employee Interaction
Center
Collaboration Tools
Workforce Cost & HeadcountPlanning & Simulation
Employee Succession Planning
Balanced Scorecard
Career Planning
Recruiting and Talent
Management
Shift Planning
PerformanceManagement
CompensationManagement
Learning
Training & EventsManagement
Skills/QualificationManagement
Organizational Management
Personnel Administration
Payroll
Claims , Loans
Time Management
Reporting
Global Employee Management
Knowledge Management : Collaboration
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 35/61
Knowledge Management : Collaboration
Project rooms and team rooms
Feedback for specific users Feedback (to author)
Rating (to author)
Feedback for everyone
Public feedback
Public rating
Discussion groups
Chats
Collaborative authoringRatingRating
Discussion GroupsDiscussion Groups
Security
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 36/61
Security
User Authentication
Role / Group / Job / Position Access Control
Transaction Access
Process Access
Field Access
Firewall Protection
Encryption
Administration
Portal Security
Master Data Security
Access Effectivity
Time-Out
Multiple Access Locking
Mass Change
Transaction History
Interface to LDAP
Digital Signature
Drag &
Drop
Drag &
Drop
Troubleshooting
Authorizations
Transport of Security
Related Objects
Integration with
Organizational Management
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 37/61
Application
Server
ERP DATACENTRE
Central
Database
Server
2 MBPS Leased Line
VSAT LinkPlants
Regional
HQ’s
Different Seismic Zones
DISASTER
MGMT. SITE
Corporate
Office
4 MBPS Leased Line
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 38/61
Project Methodology and Deliverables
Implementation Methodology
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 39/61
Training, licensing training material,
support, project reviews
Training, licensing training material,
support, project reviews
Methodology
Services
•Implementation
Assistant•Q&A db•Implementation Guide•Profile Generator
•Transport System
•Implementation
Assistant•Q&A db•Implementation Guide•Profile Generator
•Transport System
ProjectManagement
Change
Management
Risk analysis
Review
Project-related
knowledgeTools
ProjectPreparation
BusinessBlueprint
Realization
FinalPreparation
Go Live &Support
Continuous
Improvement
ASAP Roadmap
Implementation Methodology
Project Deliverables by Milestones
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 40/61
Project Deliverables by Milestones
Milestone Deliverables from SAP Prerequisites
Milestone 1: ProjectPreparation
Project Infrastructure Plan
Preliminary Project Plan
Detailed Resource Deployment Plan
Enterprise Scope Document
Training Plan for core team members
Project Charter Document
Set-up of Project Infrastructure
Identification of Core Team Members as per
detailed resource deployment plan
Deployment of core team members on full-timebasis to the project.
Milestone 2: Business
Blueprint
Final detailed enterprise scope document
“To-Be“ Business Blueprint Document
SAP Organization Structure definitiondocument
List of Critical Reports and Layouts
List of Enhancements
Data Migration strategy
Testing Strategy document
Final project plan (based on detailed ESD)
Training Strategy for power users
Sign-off on all deliverables of Project Preparation
Milestone
Formation / Identification of Steering Committee,Process Owners, Executive Committee andChange management team
Production Server Sizing detailed questionnairefilled
Core Team Training (Functional and Basis)
Hardware and Infrastructure for Development &QA Environment
Project Deliverables by Milestones
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 41/61
Project Deliverables by Milestones
Milestone Deliverables from SAP Prerequisites
Milestone 3:
Realization
Final Integration Test Plans
Final Integration Test Procedures
Final Integration Test results
Manual data transfer procedure
Established Authorization procedure andmanagement
Draft Cut over plan
End user training strategy and plan
Sign-off on Deliverables of Business BlueprintMilestone
Hardware and Infrastructure for TrainingEnvironment
Identification and deployment of Power users andMaster Data Management team
Identification of Technical team (Legacy and thirdparty systems)
Core Team Training (ABAP)
Powers Users are trained
Identification of business roles and businessauthorization profiles
Project Deliverables by Milestones
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 42/61
Project Deliverables by Milestones
Milestone Deliverables from SAP Prerequisites
Milestone 4: Final
Preparation
Go-Live and Cutover plans
SAP System Operating Manual for Basisadministration
Production support (internal helpdesk) plan
Procedure for handling calls and questionfor end user are established and distributed
User IDs and authorizations created
Customizing setting & repository objecttransported from QA to Production System
Sign-off on deliverables of Realization milestone
Identification and deployment of team for end-user training
Training Infrastructure (rooms, PCs, Connectivity,projectors, etc) at locations commissioned
End-User documentation and manuals ready
Identification of users mapped to business rolesand business authorization profiles
Production system procured, commissioned andOS Installed
Stress and Volume Test completed (by hardwareprovider) on production system
Connectivity to all identified go-live sitesestablished and tested
Requisite hardware (PC, Printers, Routers, LAN,etc) and software (MSOffice, Antivirus, SAPGUI,etc) are installed and tested for all end-users
Project Deliverables by Milestones
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 43/61
Project Deliverables by Milestones
Milestone Deliverables from SAP Prerequisites
Milestone 5:
Go-Live & Support
Issue arises during & after go live aredocumented, assigned & resolved
Formal agreement to closure for implemented sites
Sign-off on deliverables of Final Preparationmilestone
Completion of End User training
Conversion programs executed, master andcutover data transferred to productive system,validated
Manual entry data from legacy system entered intoproduction system where applicable and validated
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 44/61
Project Organisation &Role of Team Members
Project Organisation Structure
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 45/61
Project Organisation Structure
Project Team –
Full Time
TeamTeam
LeadsLeadsTeamTeam
LeadsLeadsTeamTeam
LeadsLeads
IntegrationIntegration
Manager Manager ABAPABAP
LeadLeadBasisBasis
LeadLead
BW &BW &
ReportsReports
LeadLead
LeadLead
InterfacesInterfaces
TrainingTraining
Manager Manager
Executive CommitteeExecutive CommitteeProject Sponsor Project Sponsor
Steering CommitteeSteering Committee
Project Manager-NTPCProject Manager-NTPC
Project Manager… SAPProject Manager… SAP
ABAP ABAPDevelopersDevelopers
BusinessBusiness
ConfiguratorsConfigurators
BusinessBusiness
Analysts Analysts
Basis TeamBasis Team
Change
Management
Team
Process
Owners
Power User
Team
Lead InternetLead Internet
TechnologyTechnology
WebWebProgrammersProgrammers
NTPC Project Team Profile
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 46/61
NTPC Project Team Profile
Steering Committee Members Chaired by CMD of NTPC NTPC Project Sponsor
NTPC Project Management Team Heads of Key Business Functions for SBU Head of Location operations
Program Manager Part of the Senior Management
Direct Empowerment from MD for taking project related decisions Experience of working in cross-functional areas in Senior positions Preferable Full time involvement Wide acceptance within the company Drives Change Management Initiative in the Company
Project Manager
Manager -- Full functional knowledge, IT orientation Exposure to cross-functional processes Full time involvement Wide acceptance within the company
NTPC Project Team Profile
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 47/61
NTPC Project Team Profile
Team Members
Experienced Functional representatives
Ability to Appreciate cross-functional issues
Change leaders in their functions
Full Time availability
Representatives from all Locations/Functions
Process Owners
Experienced Functional representatives
Empowered to take process related decisions for the Organization
Ability to Appreciate cross-functional issues
Part Time availability
NTPC Project Team Profile
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 48/61
NTPC Project Team Profile
Power Users
Experienced Functional representatives
Ability to Appreciate cross-functional issues
Ability to understand integration issues
Ability to train end users in respective processes
Part Time availability
Representatives from all Locations/Functions
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 49/61
Training
Training
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 50/61
g
Training is not an expenditure; it is an investment
Training early gets better returns
Training for project team
Product training in functional areas
Methodology training
Change management
Training for end users
Overview training
Customised system training
Training Strategy for NTPC
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 51/61
g gy
Professional Training
This training shall be for the core NTPC ERP implementation team.
This NTPC team will comprise of members from all the Business Functionsand IT.
Each member would be trained in the relevant function / module.
The training will enable Core team members to get a high level of conceptual
and functional understanding of the product
Power User Training
The extensive involvement of key users makes SAP Implementation projectsparticularly suited for the "train the trainer" approach. Extensive use of workingprototypes, coupled with a stable group of active users, results in a trained setof potential, high-quality trainers. These trainers are effective because theyhave been involved with the project since its inception.
A detailed training approach will be developed along with the NTPC Teamduring future phases of the Project.
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 52/61
Working With SAP
The SAP Window
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 53/61
Status Bar
Title Bar
Standard Tool Bar
Menu Bar
SAP System ID
Server
Screen Body
Application Tool Bar
Using the Navigation Area
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 54/61
g g
You can expand and
collapse menus in the
navigation area by
choosing the dropdown
arrows to the left of the
menu items, as in the
example below
To open an application in
the navigation areaDouble-click its node
Transaction Codes
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 55/61
A transaction code can be entered in the Command field.
If you precede the transaction codewith /n then the transaction is the
next screen opened in the current session.
If you precede the transaction codewith /o then a new session is openedfor the transaction. This means you then have multiple sessions.
To start a transaction, there are 4 options:
Position the cursor on the required transaction in the tree structure and press enter
Double-click on the required transaction in the tree structure
Position the cursor on the required transaction in the tree structure and select Edit Execute (or press F2)
Expand the command field and enter the transaction code
Standard Toolbar
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 56/61
The Standard Toolbar contains the Command field and the standard SAP
Toolbar buttons.
Command Field: The Command field is used to enter transaction codes that
take you directly to a system task without using menus.
Button Keyboard Shortcut Description Button Keyboard Shortcut Description
Enter Key Enter/Continue Ctrl + Page Up First page
Ctrl + S Save to database Page Up Previous page
F3 Back Page Down Next page
Shift + F3 Exit System Task Ctrl + Page Down Last page
F12 Cancel None Create New session
Ctrl + P Print None Create shortcut on Desktop
Ctrl + F Find F1 F1 Help
Ctrl + G Find next Alt + F12 Customize Local Layout
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 57/61
User Settings
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 58/61
Users can maintain their own settings by choosing System User Profile Own Data
Defaults
Change default printer, language, and date and decimal display formats.
Parameters
Allow user to create default information for frequently used fields.
Messages
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 59/61
Messages appear either in the status bar or in a pop-up window, depending on user settings
Messages starting with:
“E” indicate an Error message
“W” indicate a Warning message
Messages not beginning with an “E” or a “W‘’ are simply Information messages
Required fields are denoted by a check mark
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 60/61
7/31/2019 Presentation Over ERP to ET-2008
http://slidepdf.com/reader/full/presentation-over-erp-to-et-2008 61/61
Thank You ….