33
DRDA-IT-Hamirpur 1 Presentation on Watershed Development Programme

Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 1

Presentation on Watershed DevelopmentProgramme

Page 2: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 2

Map District Hamirpur.

Page 3: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 3

Watershed Development in HamirpurDistrict:

Watershed development has been adopted as an approach to conserve and develop the natural resources. Peoples participation as the main strategy for its planning and implementation is the most important element in this approach. A watershed has been defined as geographical unit that drains at a common point.

Page 4: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 4

Watershed Management:It is a process to achieve sustainable development of

natural resources like soil, water and vegetation. It helps in understanding the relationship among soil, water and plants and linkages between uplands and downstream.

A watershed has been planned keeping in view the three physical sectors:

i.) Non-arable land, which includes forestland, grazing land and barren land.

ii.) Arable or cultivated land.iii.) Drainage area comprising networks of natural drainage lines and

waters bodies.

Page 5: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 5

Approach:A watershed project has been delineated into various micro-watersheds of about 500 hact. each of treatable land for various soil conservation measures, promoting sustainable production systems for arable and nonarable land and also to improve the socio-economic status of the watershed community.

Page 6: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 6

Organization support:

envisages:

i.) People’s participation in the form of association and its functional groups namely WA(Watershed Association), WDC(Watershed Development Committee) and VDC(Village Development Committees). These has been formed in each Micro Watershed.

ii.) A Watershed area consisting of 12-13 Micro-Watershed has been allotted in the district with the one PIA (Project Implementing Agency). Block Development Officer of the project area has been designated as PIA and have been provided one multidisciplinary team of 3-4 persons.

Contd./---------

Page 7: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 7

iii.) in each Micro Watershed there is a chairman and one Secretary for convening watershed meeting and maintaining the record and accounts of Watershed.iv.) SHGs/UGs has also been formed in the Watershed area.

Page 8: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 8

Structure and implementation of watershed projects in Hamirpur District :

There are three main components of watershed development.A.) Training: it includes training of all persons involved in implementation of watershed programme including the villagers.B.) Community Organization: activities are being performed like conducting of Participatory Rural Appraisal Exercises, awareness camps, exposure visits and formation of SHGs and UGs.C.) Watershed Treatment/Development Works: Under this component the following activities are being taken up:

i.) Land development including in situ measures and soil conservation.ii.) Drainage line treatment by vegetative and engineering structures.iii.) Development of small Water Harvesting Structure such as check dams,

water percolation tanks ponds etc.iv.) Nursery raising for fodder, timber, fuel wood and fruit plant species.v.) Different type of afforestation work.vi.) Agro forestry and Horticulture Development.

vii.) Pasture development.

Page 9: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 9

Watershed Project Wise Map of HamirpurDistrict.

Page 10: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 10

Organisational Setup

District Watershed Development Advisory Committee(DRDA)

PIA(BDOs)

WDT

WC`s/WA`s

VDC`s/SHG`s/UG`s

Page 11: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 11

Total Watershed Projects in District Hamirpur:

I. IWDP-II2. IWDP-III3. IWDP-IV

Page 12: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 12

Project Wise ProfileIWDP - II

BDO-Hamirpur(PIA)

BDO-Sujanpur (PIA)

Area = 6220 Ha.Cost = 248.80 LacsPeriod = 5 YearsVillages=164

Area = 6280 Ha.Cost = 251.20 LacsPeriod = 5 YearsVillages=106

Micro Watershed:1Karot Nalla-I2Salghoon Nalla3Karot Nalla-II4Retian Khad5Choe Chukrala6Bamnehad Khad7Chabutra Nalla-I8Chabutra Nalla-II9Amroh Nalla10Kuthera Nalla11Sastar Nalla

Micro Watershed:1Papled Khad –I2Papled Khad-II3Sukad Khad-I4Sukad Khad-II5Kakkar Nalla6Jangled Khad7Rangrian Dhar8Bhede Ka Nalla9Jamli Khad10Jhokar Khad11Tikkari Khad12Jangled Khad

Page 13: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 13

IWDP – III

BDO-Bhoranj(PIA)

BDO-Bijahri(PIA)

Area = 6250 Ha.Cost = 375 LacsPeriod = 5 YearsVillages=158

Area = 6250 Ha.Cost = 375 LacsPeriod = 5 YearsVillages=112

Micro Watershed:1Maserdu2Amman3Tikkar Upperla4Panjot5Bagwara6Tarkwari7Tal8Mahal9Ratwani10Aghar11Bhota12Ropri

Micro Watershed:1Phahal2Uttap3Gahali4Haretta5Kalohan6Kanoh7Barsar8Dandroo9Tipper10Kakkar11Kalwara12Kothi13Bihar-Kalan

Page 14: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 14

IWDP - IV

BDO-Bamson (PIA) BDO-Nadaun(PIA)Area = 6250 Ha.Cost = 375 LacsPeriod = 5 YearsVillages=118

Area = 6250 Ha.Cost = 375 LacsPeriod = 5 YearsVillages=113

Micro Watershed:1Ghanal2Karara3Lambloo4Dugha5Sawahal6Gasota7Dhalot8Jhanikar9Sikandar10Dughali11Patta12Dasmal13Bajoh

Micro Watershed:1Pansai2Rajohal3Paniyali4Dadoh5Jassai6Daad7Kashmir8Dagoh9Plassi10Dhanoha11Kushiyar12Dhaneta13Tippar

Page 15: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 15

Date of Sanction

24/1/2000 31/8/200025/3/2001

AmountReceived till date(Lacs)

220.94218.80223.34

Nos of Installment

Received

322

Actual Expenditure incurred upto31/03/03 (in Lacs)

Training

19.3210.079.30

Admn.

27.9820.7313.21

CO & EPA

44.2533.2021.35

Works

114.5440.2935.08

Total

206.09104.2978.94

Financial Achievement Project Wise

Name of Projects

1.IWDP-II2.IWDP-III3.WDP-IV

Page 16: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 16

Project wise Physical Achievements under the Watershed Development Programme

SrNo.

1

2

3

4

5

6

7

8

9

10

11

12

Particulars

Gully Plugs

Contour and gradedbandhsCrate/Spur work

Farm ponds

Nallah Bandhs /Check DamsMinor Irrigation.

Pasture Development

Horticulture DevelopmentNos. of fruit pants planted.Total Area Treated.

Afforestation work Nos.of fuel plants planted.Nursery raising

W.A. Formed

Unit

Nos.

Nos.

Nos.

Nos.

Nos.

Nos.

Hect.

Nos

Hect

Nos.

Nos

Nos

IWDP-II

177

215

72

62

62

59

15.70

43000

4134.38

21500

4

23

IWDP-III

17

---

15

1

28

---

111.90

32054

1040.43

23000

---

25

IWDP-IV

26

---

9

1

17

---

47.00

35084

450.83

2800

---

26

Page 17: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 17

Monthly Monitoring Proforma Under IWDP for Each Micro Watershed.

Monthly Monitoring Proforma under "IWDP Dev.Block for the month of .

Component wise funds received.Sr. Name of ActivityFunds FundsNo. received Utilized1 Training2 Administration3 CO/EPA.4 Works

Sr. Name of Micro- Name of Activity/Name Estimated Expenditure Commul- Status of Area Mandays Generated Gram KoshNo. watershed (Head) of work under- cost of incurred. ative Expd. work. covered SC Other Total Women Previous Gross

taken. the activity (Hect.) Amt. Amt.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Page 18: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 18

Success Stories Under IWDP

Page 19: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 19

Worthy DC-Cum-CEO, DRDA, Hamirpur Smt. Anuradha Thakur, IAS Addressing the Members of Various Was of IWDP-IV (Man-II) at Galore District – Hamirpur

Page 20: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 20

Various SHGs/UGs/members of WAs are being oriented towards Watershed Prorammes.

Page 21: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 21

Exposure Visit: Members of Various WAs/WCs IWDP-IV Man Khad-II on exposure visit.

Page 22: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 22

Work under EPA: Repair of bouli in Vill-Chhapper IWDP-II (Bakkar Khad)

Before

After

Page 23: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 23

Work Under EPA: Plastering/Flooring of M.M. Bhawan In Vill. Nukhel M.W. Dagoh IWDP-IV (Man –II)

Page 24: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 24

Survey and Planning: WDT Member with villagers at Check Dams Site in Vill. Karsai M.W. – Plassi IWDP-IV (Man –II)

Page 25: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 25

Work Under EPA: Repair of Bouli Completed. Villagers Worshiping Lord Indra after completion IWDP-II (Salasi Khad)

Page 26: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 26

Plantation: Vegetable and Fodder Plantation in Vill.Bhati M.W. Kuthera Nalla IWDP-II (Salasi Khad)

Page 27: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 27

Check Dam: in Village-Beha M.W.-Pansai IWDP-IV Man Khad-II Cost.= Rs. 3,00,000.

Page 28: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 28

Contour Plantation: in Village –Parnali IWDP-II (Bakkar Khad)

Page 29: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 29

Check Dam: Shiuni M.W. Kuthera Nalla IWDP-II ( Salasi Khad) Cost. Rs. 97,946 Command Area= 10 Hect.

Page 30: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 30

Check Dam : at Muthan Chambialan IWDP-II (Salasi Khad) Cost= Rs. 44,915 Command Area = 8 Hect.

Page 31: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 31

Farm Pond: Improvement of farm pond in Village Chowki Jamwalan M.W. Kuthera Nalla IWDP-II (Salasi Khad) Cost Rs. 27,000/-

Page 32: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 32

Page 33: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are

DRDA-IT-Hamirpur 33

Thanks for viewing