Presentation on Project Quality Management

Embed Size (px)

Citation preview

  • 8/10/2019 Presentation on Project Quality Management

    1/45

  • 8/10/2019 Presentation on Project Quality Management

    2/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    *eore we +egin,

    Ground Rules

    Please switch off your mobile.

    We are NOT the experts and we shall L!RN TOGT"R.

    Please treat P#$O% as $ible or Gita durin& this session. We shall NOT be able to answer !LL your 'uestions( we shall try to &et the answers

    for you

    Please do NOT compare P#$O% su&&ested processes with P) processes

  • 8/10/2019 Presentation on Project Quality Management

    3/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Pro#ect $%ality anagement

    $%ality management incl%des creating and ollowing

    policies and proced%res to ens%re that a pro#ect meetsthe defned needs that it was intended to meet.

    This can also mean the same thing as completing theproject with no deviationsrom the pro#ect

    re-%irements.

    Pro#ect $%ality anagement

  • 8/10/2019 Presentation on Project Quality Management

    4/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    efnition o $%ality

    The degree to which the project fullls

    requirements. !t means that the pro#ect m%stprod%ce what it said it wo%ld prod%ce.

    The Philosophy is that -%ality is doing what yo% saidyo% were going to do andprevention overinspection.

    Pro#ect $%ality anagement

  • 8/10/2019 Presentation on Project Quality Management

    5/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    efnitions

    Gold Plating:reers to giving the c%stomer e/tras e.g.e/tra %nctionality' higher -%ality components' e/trascope' or +etter perormance1.

    This practice is not recommended' as gold plating adds

    no val%e to the pro#ect.

    Grade: $%ality and rade are not the same thing. rade isa category assigned to prod%cts or services that havesame %nctional %se +%t di3erent technical

    characteristics.

    4ow -%ality is always a pro+lem' low grade may not +e.

    Pro#ect $%ality anagement

  • 8/10/2019 Presentation on Project Quality Management

    6/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Project Quality anagement Recogni!esthe importance of the following:

    5%stomer Satisaction

    Prevention over !nspection

    anagement esponsi+ility

    5ontin%o%s !mprovement

    Pro#ect $%ality anagement

  • 8/10/2019 Presentation on Project Quality Management

    7/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Pro#ect $%ality anagement 78verview

  • 8/10/2019 Presentation on Project Quality Management

    8/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

  • 8/10/2019 Presentation on Project Quality Management

    9/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Pro#ect $%ality anagement 78verview

  • 8/10/2019 Presentation on Project Quality Management

    10/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    People. Processes. Technology. Results.

    Quality Planning

  • 8/10/2019 Presentation on Project Quality Management

    11/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality Planning

    9 $%ality Planning involves which -%alitystandards are relevant to the pro#ect anddetermine how to satisy them.

    9 !t is one o the key processes in thePlanning Process ro%p and d%ringdevelopment o the Pro#ect anagementPlan.

    9$%ality Planning sho%ld +e perormed inparallel with other pro#ect planningprocesses.

  • 8/10/2019 Presentation on Project Quality Management

    12/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality Planning

  • 8/10/2019 Presentation on Project Quality Management

    13/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality Planning7 !np%ts

    9 "nterprise "nvironmental #actors" overnmental agency reg%lations' r%les' standards' andg%idelines specifc to the application area may a3ect thepro#ect.

    9 $rgani!ational Process %ssets

    " 8rgani:ational -%ality policies

    " Proced%res and g%idelines

    " (istorical data+ases

    " 4essons7learned knowledge +ase

    9 Project &cope &tatementkey inp%t1 contains

    " Pro#ect elivera+les

    " Pro#ect o+#ectives that are %sed to defne re-%irements1

    " Acceptance criteria

    " Thresholds " cost' time or reso%rces

    9 Project anagement Plan

  • 8/10/2019 Presentation on Project Quality Management

    14/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality Planning 7 Tools ;Techni-%es

    9'ost()enet %nalysis5onsider 5ost7*eneft tradeo3s." Primary *enefts to consider " less rework' higher prod%ctivity'

    lower costs' increased c%stomer satisaction." Primary 5osts to consider " e/pense associated with Pro#ect $%ality

    anagement Activities.

    9 )enchmar*ing

    5omparing with other pro#ects to" enerate ideas o improvement" Provides +asis to meas%re perormance

    9 +esign of ",periments" Statistical method e.g.' try vario%s com+inations o s%spension and

    tires to determine which com+ination provides most desira+le ride1" (elps in optimi:ation o prod%ct and processes

    9 'ost of Quality is the cost inc%rred in" eect prevention" A%dits" ework

    9 %dditional Quality Planning Tools" 4ike +rainstorming'

  • 8/10/2019 Presentation on Project Quality Management

    15/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality Planning 7 8%tp%ts

    9 Quality anagement Plan is a s%+sidiary plan o the pro#ectmanagement plan.

    " =ormal or inormal. (ighly detailed or +roadly ramed

    " escri+es how the pro#ect management team will implementthe perorming organi:ation>s -%ality processes.

    " %st address

    $%ality control " $5$%ality Ass%rance " $A

    5ontin%o%s process improvement

    9 Quality metrics incl%des

    " eect density

    " =ail%re rate" Availa+ility

    " elia+ility

    " Test coverage

    9 Quality 'hec*lists

  • 8/10/2019 Presentation on Project Quality Management

    16/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality Planning 7 8%tp%ts

    9 Process -mprovement Plan

    " !s a s%+sidiary o the pro#ect management plan.

    " =acilitates identifcation o waste and non7val%e added activitiesth%s increasing c%stomer val%e.

    9 Quality )aseline

    " ecords the -%ality o+#ectives o the pro#ect.

    " !s the +asis or meas%ring and reporting -%ality perormance aspart o the perormance meas%rement +aseline.

    9 Project anagement Plan %pdates1

    " S%+sidiary -%ality management plan

    " Process improvement plan

    " e-%ested changes to pro#ect management plan

  • 8/10/2019 Presentation on Project Quality Management

    17/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Project Quality %ssuranceProject Quality %ssurance

  • 8/10/2019 Presentation on Project Quality Management

    18/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    efnition

  • 8/10/2019 Presentation on Project Quality Management

    19/45Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Pro#ect $%ality Ass%rance

    Project Quality Assurance :An Umbrella for Continuous Process Improvement.

    Pro*ides intensi*e means to impro*e the +uality of all the Processes.

    Reduces waste and non *alue added acti*ities allowin& the processes tooperate at increased le*el of efficiency

    ,n*ol*es identification and re*iew of or&ani-ational business processes

  • 8/10/2019 Presentation on Project Quality Management

    20/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    !np%ts to Pro#ect $%ality Ass%rance

  • 8/10/2019 Presentation on Project Quality Management

    21/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    !np%ts to Pro#ect $%ality Ass%rance

    Quality Management Plan

    The 'uality mana&ement plan describes how +! will be performedwithin the proect.

    Quality Metrics

    ! metric is an operational definition that describes( in *ery specificterms( what somethin& is and how the 'uality control processmeasures it.+uality metrics are used in the +! and +/ processes. )omeexamples of 'uality metrics include defect density( re*ieweffecti*eness( producti*ity and test co*era&e etc.

    Process Improvement Plan

    The process impro*ement plan is a subsidiary of the proectmana&ement plan. The process impro*ement plan details the stepsfor analy-in& processes that will facilitate the identification of wasteand non0*alue added acti*ity.

  • 8/10/2019 Presentation on Project Quality Management

    22/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    !np%ts to Pro#ect $%ality Ass%rance

    Work Performance Information

  • 8/10/2019 Presentation on Project Quality Management

    23/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    !np%ts to Pro#ect $%ality Ass%rance

    Approve C!ange "e#uests!ppro*ed chan&e re'uests can include modifications to wor1methods( product re'uirements( 'uality re'uirements( scope andschedule. !ppro*ed chan&es need to be analy-ed for any effectsupon the 'uality mana&ement plan( 'uality metrics or 'uality chec1

    lists. !ll chan&es should be formally documented in writin& and any*erbally discussed( but undocumented( chan&es should not beprocessed or implemented.

    Quality Control Measurements

    +uality control measurements are the results of 'uality controlacti*ities that are fed bac1 to the +! process for use in re0e*aluatin& and analy-in& the 'uality standards and process of theperformin& or&ani-ation.

  • 8/10/2019 Presentation on Project Quality Management

    24/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    !np%ts to Pro#ect $%ality Ass%rance

  • 8/10/2019 Presentation on Project Quality Management

    25/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Tool ; Techni-%es or Pro#ect $%alityAss%rance

  • 8/10/2019 Presentation on Project Quality Management

    26/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Tool ; Techni-%es or Pro#ect $%alityAss%rance

    Quality Planning $ools an $ec!ni#ues

    +uality plannin& tools are often used to help better define thesituation and help plan effecti*e 'uality mana&ement acti*ities.These includes cost0benefit analysis( benchmar1in&( cost of 'uality(brainstormin&( flowcharts etc.

  • 8/10/2019 Presentation on Project Quality Management

    27/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Tool ; Techni-%es or Pro#ect $%alityAss%rance

    %bjective of Quality Auit

    ,dentify inefficient and ineffecti*e policies( processes and proceduresused within a proect

    Reduce /ost of +uality

    ,ncreased /ustomer !cceptance 2 )atisfaction

    /onfirm the implementation of appro*ed chan&e re'uest( correctactions( defect repairs and pre*enti*e actions.

  • 8/10/2019 Presentation on Project Quality Management

    28/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Tool ; Techni-%es or Pro#ect $%alityAss%rance

    Process Analysis

    Process analysis follows the steps outlined in the processimpro*ement plan to identify needed impro*ements from anor&ani-ational and technical standpoint.

    Quality Control $ools an $ec!ni#uesThere are se*en basic tools for 'uality control3&. Cause an effect iagrams'also called ,shi1awa dia&ram or

    fishbone dia&rams( illustrate how *arious factors mi&ht belin1ed to potential problems or effect.

    (. Control C!arts' ! control chart4s purpose is to determinewhether or not a process is stable or has predictableperformance.

    ). *lo+c!arting' 5lowchartin& helps to analy-e how problemsoccur.

  • 8/10/2019 Presentation on Project Quality Management

    29/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    Tool ; Techni-%es or Pro#ect $%alityAss%rance

    ,. -istogram is bar chart showin& a distribution of the *ariables.

    . Pareto C!artis a specific type of histo&ram( ordered byfre'uency of occurrence( which shows how many defects were&enerated by type or cate&ory of identified cause.

    /. "un C!art shows the history and pattern of *ariations.

    0. 1catter 2iagram shows the pattern of relationship between two*ariables.

  • 8/10/2019 Presentation on Project Quality Management

    30/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    8%tp%ts to Pro#ect $%ality Ass%rance

  • 8/10/2019 Presentation on Project Quality Management

    31/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    8%tp%ts to Pro#ect $%alityAss%rance

    "e#ueste C!anges

    ,f the recommended correcti*e or pre*enti*e action re'uire a chan&eto the proect( a chan&e re'uest should be initiated in accordance withthe defined inte&rated chan&e control process.

    "ecommenation of Corrective Actions

    /orrecti*e action in*ol*es actions ta1en as a result of a +/measurement that indicates that the manufacturin& or de*elopment

    process exceeds established parameters

  • 8/10/2019 Presentation on Project Quality Management

    32/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    8%tp%ts to Pro#ect $%alityAss%rance

    %rgani3ational Process Assets 4Upates5

    Complete c!ecklists:When chec1 lists are used( the completedchec1list should become part of the proect4s records.

    6essons learne ocumentations: The cause of *ariances( thereasonin& behind the correcti*e action chosen( and other types of

    lesson learned from 'uality control should be documented so that theybecome part of historical database for both this proect and performin&or&ani-ation.

    Project management Plan 4Upates5

    The proect mana&ement plan is updated to reflect chan&es to the'uality mana&ement plan that results from chan&es in performin& the+/ process. Re'uested chan&es 6addition( modification or deletions7to the proect mana&ement plan or to its subsidiary plans areprocessed by re*iew and disposition throu&h the inte&rated chan&e

    control process.

  • 8/10/2019 Presentation on Project Quality Management

    33/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    People. Processes. Technology. Results.

    Quality 'ontrol

  • 8/10/2019 Presentation on Project Quality Management

    34/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol

    8+#ectives

    9 onitoring specifc pro#ect res%lts to

    determine compliance with relevant -%alitystandards

    9 !dentiying the ways to eliminate the ca%seso %nsatisactory res%lts

  • 8/10/2019 Presentation on Project Quality Management

    35/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol

  • 8/10/2019 Presentation on Project Quality Management

    36/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol 7 !np%ts

    9 Quality anagement Plan

    " isc%ssed %nder $%ality Planning o%tp%t

    9 $rgani!ational Process %ssets

    " =ormal and !normal planning related

    ?Policies

    ?Proced%res

    ?%idelines

    " 4essons7learned knowledge +ase

    9 Quality etrics

    " isc%ssed %nder $%ality Planning 8%tp%t

    9 Quality 'hec*lists" isc%ssed %nder $%ality Planning 8%tp%t

    9 or* Performance -nformation

    " !normation on the stat%s o the pro#ect activities isro%tinely collected as part o the pro#ect managementplan e/ec%tion disc%ssed earlier in $A !np%ts1.

  • 8/10/2019 Presentation on Project Quality Management

    37/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol 7 !np%ts

    9 %pproved 'hange Requests

    " Approved change re-%ests can incl%de modifcations toscope' re-%irement' sched%le.

    " Approved changes need to +e analy:ed or any e3ect%pon -%ality management plan' metrics.

    9 +elivera/les" @ni-%e and verifa+le prod%ct' res%lt or capa+ility to

    perorm a service.

    " !dentifed in a pro#ect management planningdoc%mentation and m%st +e prod%ced and provided tocomplete the pro#ect.

  • 8/10/2019 Presentation on Project Quality Management

    38/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol 7 Tools ;Techni-%es

    9 'ause and "0ect +iagram

    " 5a%se and 3ect diagrams' also called as !shikawadiagrams or =ish+one diagrams.

    " !ll%strate the relation o varia+les to the -%ality pro+lem ordeect.

    9 'ontrol 'harts

    " (elps in determining whether or not a process is sta+le orhas a predicta+le perormance.

    " 5ontrol chart also ill%strates how a process +ehaves overtime.

    9 #lowcharting

    " =lowcharting is a graphical representation o a process." (elps to analy:e how pro+lems occ%r.

  • 8/10/2019 Presentation on Project Quality Management

    39/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol 7 Tools ;Techni-%es

    9 Pareto 'hart" A Pareto chart is a +ar chart' ordered +y re-%ency o

    occ%rrence' which shows how many deects weregenerated +y type or category o identifed ca%se.

    " *ased on Pareto>s law commonly known as B0C20 r%le1 DB0 percent o the pro+lems come rom 20 percent o the

    iss%es.

    9 &catter +iagram

    " This tool allows the team to st%dy and identiy thepossi+le relationship +etween changes o+served in two

    varia+les.

  • 8/10/2019 Presentation on Project Quality Management

    40/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol 7 Tools ;Techni-%es

    9 +efect Repair Review" Action taken to ens%re that the prod%ct deects are

    repaired and +ro%ght into compliance with there-%irements.

    9 &tatistical &ampling

    " Process o choosing a percentage o res%lts at randomor inspection.

    " Appropriate sampling can red%ce the cost o -%alitycontrol.

    9 -nspection

    " /amination o a work prod%ct to determine whether it

    conorms to standards." eviews' peer reviews' a%dits and walkthro%ghs.

  • 8/10/2019 Presentation on Project Quality Management

    41/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol 7 Tools ;Techni-%es

    9 Trend %nalysis using Run 'hart" A r%n chart shows the history and pattern o variation.

    " %n chart shows trends in a process over time declinesor improvements in a process over time.

    " Trend analysis is perormed %sing r%n chart to monitorD

    ?Technical perormance

    ?5ost and sched%le perormance

    9 1istogram

    " (istogram is a +ar chart showing the distri+%tion ovaria+les.

    " (elps to identiy the ca%se o pro+lems in process +y

    shape and width o distri+%tion.

  • 8/10/2019 Presentation on Project Quality Management

    42/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol 7 8%tp%ts

    9 Quality 'ontrol easurement

    " epresents the res%lts o $5 activities that are ed +ack to $Ato reeval%ate and analy:e the -%ality standards and processes.

    9 2alidated +efect Repair

    " The repaired deects are re7inspected and will +e eitheraccepted or re#ected.

    " e#ected items may re-%ire %rther deect repair.

    9 Quality )aseline 34pdates5

    " $%ality o+#ective o the pro#ect.

    " $%ality +aseline is the +asis or meas%ring the -%alityperormance.

    9 Recommended corrective actions" ecommended corrective actions to +ring e/pected %t%re

    pro#ect perormance.

  • 8/10/2019 Presentation on Project Quality Management

    43/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol 7 8%tp%ts

    9 Recommended prevented actions

    " ecommended preventive actions that red%ce the pro+a+ility onegative conse-%ences.

    9 Requested changes

    " 5hanges re-%ired +y recommended correctiveCpreventiveactions to the pro#ect.

    9 Recommended defect repair

    " eects are identifed and recommended or repair.

    " A deect log can +e %sed to collect the set o recommendedrepairs.

    9 $rgani!ation process assets 34pdates5

    " 5ompleted checklists" 4essons learned doc%mentation

  • 8/10/2019 Presentation on Project Quality Management

    44/45

    Proprietary and confdential. 2006 Perot Systems. All rights reserved. All registered trademarks are the property o their respective owners.www.perotsystems.com

    $%ality 5ontrol 7 8%tp%ts

    9 2alidated +elivera/les

    " The res%lts o the e/ec%tion o -%ality control processes arevalidated delivera+les.

    9 Project anagement Plan 34pdates5

    " @pdated Pro#ect management plan to re

  • 8/10/2019 Presentation on Project Quality Management

    45/45

    People. Processes. Technology. Results.

    Thank yo%