EXHIBIT LIST Reference No: HOC/10001 Petitioner: Route Presentation Published to Collaboration Area: Friday 16-Mar-2018
Page 1 of 30
No Exhibit Name Page
1 Route Overview (P1) 2 - 30
HOC/10001/0001
Phase 2a Route Overview for House of Commons Select Committee Professor Andrew McNaughton
19 March 2018
P1 (1) HOC/10001/0002
2
High Speed Rail Network
P1 (2) HOC/10001/0003
3
High Speed Rail is 53 Years Old
P1 (3) HOC/10001/0004
4
International Technical Standards
P1 (4) HOC/10001/0005
5
Indicative Rail Corridor
P1 (5) HOC/10001/0006
6
HS1 Two Track Railway
P1 (6) HOC/10001/0007
7
200m long trains which can be coupled to run in pairs 400m long
P1 (7) HOC/10001/0008
8
HS2 Design Principles
1. Integrated noise protection and visual screening 2. Further screen planting to supplement earthworks and fit with local landscape 3. An earthworks solution removes the need for a fence type noise barrier (cutting costs + maintenance burden) 4. Land returned to agriculture up to the railway (opportunity to improve agricultural land) 5. This earthworks solution minimises the width of the rail corridor 6. Protection of environmental features (e.g. ecology, heritage, landscape) 7. Boundary fence visually concealed behind the earthworks 8. The majority of the original land take is handed back for productive use
P1 (8) HOC/10001/0009
9
Phase 2a Route Overview
P1 (9) HOC/10001/0010
10
1. Fradley to Kings Bromley
P1 (10) HOC/10001/0011
11
2. Kings Bromley to Blithbury
Newlands Lane Auto Transformer Feeder Station
P1 (11) HOC/10001/0012
12
Newlands Lane Auto Transformer Feeder Station
View from North looking South
P1 (12) HOC/10001/0013
13
3. Colton to Colwich
Newlands Lane Auto Transformer Feeder Station
P1 (13) HOC/10001/0014
14
4. Moreton to Ingestre
Great Haywood viaduct
P1 (14) HOC/10001/0015
15
5. Staffordshire Show Ground to Marston
P1 (15) HOC/10001/0016
16
6. Marston to Stone
Stone Infrastructure Maintenance Base - Rail
P1 (16) HOC/10001/0017
17
7. Stone Infrastructure Maintenance Base to Swynnerton
Stone Infrastructure Maintenance Base - Rail
P1 (17) HOC/10001/0018
-
Stone Infrastructure Maintenance Base - Rail
P1 (18) HOC/10001/0019 18
19
8. Swynnerton to Stableford
P1 (19) HOC/10001/0020
20
9. Whitmore Heath Tunnel to Madeley Tunnel
P1 (20) HOC/10001/0021
21
High Speed Porous Tunnel Portal
P1 (21) HOC/10001/0022
22
9. Whitmore Heath Tunnel to Madeley Tunnel
P1 (22) HOC/10001/0023
23
10. Madeley Tunnel to Blakenhall
P1 (23) HOC/10001/0024
24
11. Crewe Approaches
P1 (24) HOC/10001/0025
25
Crewe Existing Layout
P1 (25) HOC/10001/0026
26
Crewe Proposed Layout HS2 Trains Passing Crewe Highlighted
P1 (26) HOC/10001/0027
27
Crewe Proposed Layout HS2 to WCML Highlighted
P1 (27) HOC/10001/0028
-P1 (28) HOC/10001/0029 28
29
High Speed Rail Network
P1 (29) HOC/10001/0030