PRESENTATION ON
ELECRICITY SUPPLY IN BOTSWANA
Botswana – China Business Forum
31 August 2018
PRESENTATION PLAN
1. THE ELECTRICITY SUPPLY INDUSTRY IN BOTSWANA
2. ELECTRICITY CONSUMPTION AND SOURCES OF SUPPLY
3. LONG TERM ELECTRICITY DEMAND FORECAST AND GENERATION EXPANSION
4. BOTSWANA’s RENEWABLE ENERGY ROAD MAP (NEW ENERGY MIX)
5. TRANSMISSION INFRASTRUCTURE DEVELOPMENT AND REGIONAL INTERCONNECTION
6. THE SOUTHERN AFRICAN POWER POOL (SAPP) AND ELECTRICITY TRADE
THE BOTSWANA ELECTRICITY SUPPLY INDUSTRY (ESI) OVERVIEW
BPC Generation
IPP Generation
BPC Transmission
SAPP Import / Export
BPC Customer Services & Supply
Electricity End Users
Domestic
Commercial
Government
Mining
Botswana Power Corporation (BPC) (Wholly Owned by GoB)
Regulator Botswana Energy
Regulatory Authority
Key Aspects • Energy Regulator Established in 2017• Private Sector Participation in Generation• BERA Functions Include
✓ Licensing of Entities in Power Sector✓ Tariff Determination ✓ Enforcement of Standards
Mining25%
Commercial34%
Domestic31%
Government 10%
Year 2017'
Mining41%
Commercial24%
Domestic26%
Government 9%
Year 2008'
Year 2008Category Energy (GWH)Mining 1,186Commercial 684Domestic 745Government 274Total 2,889
Year 2017Category Energy Mining 837 Commercial 1,107 Domestic 1,022 Government 314 Total 3,279
KEY STATISTICS: SALES DISPOSITION
1.5% Avg. Annual
Growth
NOTES➢ No. of Customers = 438, 483➢ Access To Electricity = 81.4%➢ Electrification Level = 60.7%➢ Avg. Growth Rate = 1.5% Per Annum
0
500
1000
1500
2000
2500
3000
3500
4000
4500
2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5 2 0 1 6 2 0 1 7
Ene
rgy
(GW
H)
Period (Year)
SOURCES OF SUPPLY: MARKET SHARE
Imports
Local Generation
Morupule A (Coal)
Morupule B (Coal)
Orapa (Diesel) 90 MW
Matshelagabedi (Diesel)
Morupule A (4X33MW)Commissioned 1986/9
Morupule B (4 X150MW)Commissioned 2012/13
Orapa (2X45MW)Commissioned 2011
MatshelagabediCommissioned 70MW – 2010
Local Generation
16%
Imports 84%
2009
Towards Self Sufficiency
BOTSWANA SOURCES OF ELECTRICITY
Local Generation
78%
Imports 22%
2018
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
-
200
400
600
800
1,000
1,200
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Ene
rgy
(GW
h)
De
man
ad (
MW
)
Year
Botswana Electricity Forecast (Demand & Energy) (2018 - 2030)
Energy Forecast Demand Forecast
ELECTRICITY DEMAND FORECAST (2018 – 2030)
GROWTH RATES
• Capacity (MW) = (3-5)%• Energy (MWH) = (1.5 – 3) %
GENERATION EXPANSION PLAN (2018 – 2030)
Generation Plan (2018 – 2030)No. Source Remarks
1 Morupule A (Existing) 132 MW, Period 2018 – 20332 Morupule B (Existing) 600 MW, Period 2012 – 20423 New Capacity (Future) 300 MW, Period Post 20234 Solar PV (Future) 100 MW , Period 2021 Onwards
0
200
400
600
800
1000
1200
1400
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Capacity Plan 2018 to 2030
Morupule A Morupule B New Capacity Solar PV - No Storage Imports Diesel Emergency Peak Demand
Green Energy Storage
Solar PV Plant
8
RENEWABLE ENERGY ROAD MAP: TORWARDS A NEW ENERGY MIX
50 MW PV Solar Plant
Solar PV Hybrid Off Grid (Remote Villages)
Grid Connected (1- 5MW) Solar PV Plants
Renewable Energy Road Map
1. 100MW Solar PV (2X50MW) Procurement of Developer In
progress (Open Tender). Commercial Operation 2021
2. 12 X Grid Connected PV At Tender Stage - Developer
Selection Commercial Operation
2020/21
3. 20 Solar PV Off Grid for Villages At Inception Stage
GABORONE
Francistown
MAUN
Selebi-Phikwe
S O U T H
A F R I C A
Z I M B A B W E
N A M I B I A
Matimba P/S
Thamaga
2x2
15
km4
7km
51km
Tsabong
52km
Morupule A
220kV
400kV
132kV
Phokoje
ORAPALetlhakane
Substation
Tati30km
Morupule B
Katima
Lobatse
Kasane
Bulawayo
Spitzkop
Jwaneng
33kV
Sowa
Mowana
Pandamatenga
HwangeVictoria
ZAMBIA
BPC TRANSMISSION PLAN
To Auas
348km
Kanye
Livingston
Proposed Existing
Molepolole
Heuningvlei
Omaere
Orapa – 90MW
SHAKAWESamochima
Substation
TOTENGLegotlhwane
Substation
330kV
GANTSI
GUMAREMakoba
Substation
NWTGC PHASE 1
Note : Map not to Scale. Only for guidance purpose
Watershed
Dukwi
Substation
Substation
NWTGC PHASE 2
BOTSWANA’S TRANSMISSION GRID INVESTMENTS
1. North West Transmission Grid (Phase 1) Construction In Progress Completion Dec 2019
2. North West Transmission Grid (Phase 2) Project Specification and
bid documents in place Funding to be Secured
3. ZIZABONA INTERCONNECTION Sponsors (Power Utilities)
to Secure Funding
ZIZABONA
BOTSWANA’S TRANSMISSION GRID INVESTMENTS
ELECTRICITY TRADE IN THE SOUTHERN AFRICAN POWER POOL
ABOUT SAPP
➢ Established in 1995 by SADCMember Countries
➢ Governed by 4 Agreements(2X MOUs, ABOM, GridOperating Guidelines)
➢ 16 Members (National PowerUtilities, IPPs & ITCs)
➢ Objective: Grid Reliability,Quality of Supply,Harmonized Trade Relations.
ELECTRICITY TRADE MECHANISMS
➢ Bilateral Contracts (CrossBorder PPAs).
➢ Competitive ElectricityMarket✓ FPM-M✓ FPM-W✓ Day Ahead (DAM)✓ Intra Day (IDM)
➢ Transmission Wheeling
SAPP TRADE STATISTICS FOR 2017 Financial Year
Market Volume Share Energy Cost Other CostsBilateral Contracts 7,991,617 MWH 88.7% N/A N/ACompetitive (Short Term Energy) 1,023,056 MWH 11.3% USD 55.6 Million USD 20.2 Million
CONCLUSOIN
1. Electricity Supply In Botswana Is Dependable And Readily Available For Business Operation
2. Power Supply Plans Are In Place for Long Term Security Of Supply
3. Electricity Pricing Is Through Regulation By The Botswana Energy Regulator (Consumer Protection)
For More Information on Electricity Supply in Botswana Visit Our Web Site:
www.bpc.bw
For Information on the Regional Power Supply Outlook, Visit The Southern African Power Pool Web Site:
www.sapp.co.zw
Contact Information: Email: [email protected]