Aluminium Park at Angul, OdishaAn opportunity to invest .
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
2/23
Background Odisha -1.80 billion tons of estimated Bauxite reserves -60% of
the countrys total
IDCO State level Nodal Agency for providing industrialinfrastructure and land
NALCO- PSU with 15.8 Lakh TPA Bauxite Refinery at Damanjodiand 4.60 lakh TPA Aluminium Smelter and a 960 MW CaptivePower Plant at Angul
Angul Aluminium Park Pvt Ltd (AAPPL) formed as a JointVenture Company between IDCO and NALCO Promotion of Aluminium specific downstream and ancillary units in the
State
Aluminum Park at Angul Odisha on around 450 acres of landadjacent to existing NALCO Smelter Plant under implementation
First of its kind in the sub continent with necessary infrastructure supportand facility for directly receiving molten aluminium as well as aluminiumin regular solid forms from the adjoining smelter plant of NALCO
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
3/23
Project Objective Promotion of aluminium based downstream and ancillary units in the
State in conjunction to IPR 2007 and MSME Development Policy 2009
Providing ready to use land parcels complete with all supportinfrastructure for entrepreneurs/investors
Capitalizing on the benefits of the existing NALCO aluminium smelterplant , especially in terms of molten metal and overall synergy
Addressing the needs of the existing NALCO smelter plant in terms of
AAPPL Promoters CommitmentIDCO - land availability, facilitating world class infrastructure within the park ,external linkages , facilitation in approvals and clearances
NALCO providing raw material to units in molten form andregular form and act as the Anchor mother unit
Leveraging the conducive industrial environment of the Angul region in aneco friendly manner ensuring minimum adverse environmental impact
Generation of employment and creation of export opportunities
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
4/23
Likely Project Benefits
Value addition to the Aluminium sector in the State
Overall development of Project surrounding region
Generation of Employment Direct employment foraround 6000 heads envisaged
Indirect em lo ment otential to the tune of 15000
Expected capital investment of Rs 2000 crores by theunit holders
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
5/23
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
6/23
Site Details and Linkages Site adjacent to NALCO
Smelter Unit BanarpalBlock, South of NH 42
Approach Road
Existing -2.50 km villageroad from NH 42
Existing 6.40 km roadalong boundary wall ofNALCO Plant
Proposed ExclusiveApproach Road from NH42 alignment
finalization underprogress
Water -River Brahmani at15km north of site
Power National Grid at Chainpalnear TTPS a likely source
Rail Head Single track rail sidingof NALCO till Budhapank runs alongnorthern part of site -14 km length
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
7/23
State-of-the-Art self sustaining Aluminium based industrial park
Ready to use land parcels complete with all support infrastructurefacilities including common infrastructure
First of its kind in the sub continent with facilities for directlyhaving aluminium in molten form as well as in solid state for use byrespective downstream units
Project Concept
Target Units Entrepreneurs in related business to set up unitswithin proposed park Aluminium based Downstream Units
Industrial Units using molten aluminium Industrial Units using products from such units Industrial Units using Aluminium in solid form
Aluminium based Ancillary Units Ancillary units supporting the NALCO Smelter Plant Ancillary units supporting other units within proposed Project
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
8/23
Advantages in using Aluminium in molten form Savings in terms of energy and processing costs Reduction in terms of adverse environmental impact - reduction in
energy requirement for the process and transportation Better quality of the metal in terms of lesser chemical impurities Efficient management of inventory
Project to fulfill comprehensively the functional requirements interms of common facilities, physical and social infrastructure
Project Concept ..Contd..
Envisaged components Industrial Plots Warehouses/Storage Facilities
Common Facility Centers Material recycling and handling facilities Skill development centers and ITIs Landscaped (green) areas, Buffer Zones Truck Terminal and Parking facilities
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
9/23
The envisaged support infrastructure Reserved green space A systematic network of internal roads Regular supply of quality water with adequate storage facilities
Reliable power supply including renewable energy sources Underground utility lines Fire fighting system for the Park Adequate parking space for trucks/others Common effluent treatment and solid waste disposal and management
Project Concept ..Contd..
facilities including for hazardous and non hazardous wastes Sturdy storm water and Sewerage networks, Sewage Treatment Plant Common Rail Siding Banks / ATMs / STD PCOs Public and Semi public facilities including Emergency Health Services,
Crche, Public Health Centers etc. Efficient and professional service-oriented Operations & Maintenance
system Dedicated access controlled road corridor from NALCO smelter unit for
carriage of molten aluminium
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
10/23
Downstream Industries of Aluminium Conductors Extrusions Castings Foil Others including Powder
Ancillary Industries Raw materials like caustic soda, coal tar pitch, alum etc. Dross recovery unit Mechanical Items: Chisel Poker, LDPE sheets, Ingot skimming tool, etc
Indicative Products within the Park
Products for commercial production within project shall be decided based on mutualconsent of the prospective unit holders and AAPPL considering current and proposed
production facilities and commercial plans of the NALCO Unit
Instrumentation Electronic Items: Alarm card, Pressure Switch, T/Csockets, photocell etc Refractory Items- like LCC lid cover, flue wall bricks etc. Miscellaneous Items- Hand gloves, casting wheel nozzle, cotton dust
mask etc.
Others
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
11/23
Project Status
Land acquisition in progress SPV formed between IDCO and NALCO Infrastructure linkage studies in progress Topographic Survey for site and road alignment to start shortly Broad lay out planning and project concept prepared
EOI exercise completed to identify prospective unit holders Site visit made to similar facilities in Saguenay, Canada by IDCO
NALCO Team
Project Status & Implementation
ropose mp emen a on A Joint Venture Company between NALCO and IDCO AAPPL formed IDCO Role
Land Acquisition Facilitate internal infrastructure creation within proposed site Facilitate infrastructure linkages for the site
Catalyze Approvals and Clearances Catalyze State level incentives for the units in conjunction to State MSME
Policy, IPR 2007 and others
NALCO Role
Availability of raw material in molten and other suitable formsAct as Anchoring Mother Units
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
12/23
Funding for the common project infrastructure to be arrangedthrough a suitable combination of promoters equity in the Project,funds arranged from State Government/ Market Borrowings andgrant under any appropriate Scheme if possible
Proposed Role of AAPPL Implementation of Internal Infrastructure facilities Marketing & promotion of the Aluminium Park and facilitating
Project Implementation
allotment of plots to industrial units Operation and maintenance of the Project The entire management including resource management, security,
collection of revenues, payments etc pertaining to the Aluminium Parkincluding the dedicated corridor from the NALCO plant for carriage of
molten metal
Project USPs Proposed Supply of Aluminium in Molten Form IDCO Commitment in providing external infrastructure Presence of NALCO
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
13/23
News paper Advertisement
inviting EOI27.07.11
Project Brief Meeting17.08.11
Last Date of EOI submission20.09.11
Process Flow for EOI
50 Applicantssubmitted their
Invitation forpresentation/discussions(Date to be intimated )
Steps towards Applicationthrough NA and Land
Allotment
EOIs
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
14/23
Outcome of the EOI Process Proposed Product Preferenceand Plot Sizes
Majority of Applicants showed preference for Aluminium Extrusions andConductors .
As per the application received, requirement for individual plot sizes for theproposed units vary from 1.00 acre minimum and going up to a maximum of
200 acres for a single Applicant.
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
15/23
Outcome of the EOI Process Investment & Employment
Majority of Applicants are observed to go for an investment of up to Rs. 20.00Crores per unit. The total envisaged ultimate capital investment by the Applicantsexceeds Rs. 2000 Crores
Applicants collectively have an employment potential of more than 6000considering all phases varying from 10 and going up to 500 per unit.
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
16/23
Estimated Total Water Demand around 4.00 MLD
Estimated Total Power Demand around 80.00 MW
Outcome of the EOI Process Infra & Other Requirements
Requirements of other common facilities are as follows;
Truck Parking Facilities
Dies and Machine Repair Shops
Material Recycling Unit
R&D Facilities and Testing Centres
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
17/23
Based on Diagnostics Study
Inputs from EOI Process
Visit to similar facilities
1. Road Infrastructure Approach Road from NH 55
Access controlled Road for carriage of molten metal from NALCO smelter plant
Internal Road Network for the Park
2. Boundar Wall and Entrance Gate
Proposed Project Components for the Park
3. Water Supply System4. Power Supply System
5. Drainage System
6. Sewerage System including CETP
7. Truck Parking with weigh bridge facilities8. Ware House
9. Common Facilities Centre -Common Machine Room, Training Centre, TestingCentre
10.Business Centre -Business Facilitation Hall, Convention Hall, Lounge Facility,Information Centre, Banking Facilities, Office Space, Refreshment Facilities
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
18/23
Estimated Project Cost for Phase I of around 250 acres
Rs. 107. 58 Crore
Proposed Project Cost
15%
3%
4%
10%
7%4%
Project Cost under Different Heads
ROAD INFRASTRUCTURE
BOUNDARY WALL & ENTRANCE GATE
WATER SUPPY SYSTEM
POWER SUPPLY SYSTEM
DRAINAGE SYSTEM
21%
21%
7%
4%
4%
SEWERAGE SYSTEM INCLUDING CETP
TRUCK PARKING
WAREHOUSE
COMMON FACILITIES CENTRE
BUSINESS CENTRE
ENGINEERING AND CONSTRUCTIONSUPERVISION EXPENSES
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
19/23
Road Infrastructure Rs. 15.90 Crore
Boundary Wall & Entrance Gate Rs. 3.78 Crore
Water Supply System Rs. 23.11 Crore
Power Supply System Rs. 22.18 Crore
Drainage System Rs. 7.35 Crore
Sewerage System including CETP Rs. 4.32 Crore
Truck Parking Rs. 3.80 Crore
Proposed Project Cost Common Heads
Warehouse Rs. 4.70 Crore
Common Facility Centre Rs. 10.50 Crore
Business Centre Rs. 7.87 Crore
Engineering & Supervision Expenses Rs. 4.08 Crore
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
20/23
Proposed Project Layout Road Network
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
21/23
Proposed Project Layout Phase I
7/31/2019 Presentation on Aluminum Park at Anugul-Odisha by NALCO[1]
22/23
STATUS OF THE PROJECT & WAY FORWARD
Finalization of the Project Report based on EOI findings andexperience from visit of similar facilities
Expeditious completion of land acquisition process is being takenup by IDCO
External Infrastructure provisioning by IDCO / AAPL
Designing of System for Transportation of Hot Metal from Smelterto Park being taken up
Land Acquisition underway
Applications through Single Window are invited for units in the
Park