9
1 WEB Aruba Roadmap to HFO Reduction and Renewable Energy Increase Presented by Oslin J. Boekhoudt, General Director WEB Aruba NV

Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

Embed Size (px)

Citation preview

Page 1: Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

1

WEB Aruba Roadmap to HFO Reduction and

Renewable Energy Increase

Presented by Oslin J. Boekhoudt, General Director WEB Aruba NV

Page 2: Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

2

Corporate Strategy 2014 - 2020

Cleaner, Greener and Fuel Oil Free by 2020

The period represents a logical sequence in focus and a clear strategic direction towards 2020 for WEB Aruba NV

Page 3: Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

3

Accomplished till now

• Total investments for 2005-2013 of Afl. 450 Million

• Total HFO reduction of approx. 40%

• Realized renewable penetration of 17%

• Realized pilot Ice Storage Project at WEB Facility

The roadmap to HFO reduction & renewable energy increase

Page 4: Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

4

6,180 6,166 6,227

5,635

5,296

4,922 4,992

4,172

3,791

3,543

3,716

$36.13

$46.27

$51.99

$77.66

$55.40

$73.13

$99.02 $102.83

$97.13 $97.51

$-

$20

$40

$60

$80

$100

$120

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

HFO

Pric

e in

USD

/Bbl

HFO

Con

sum

ption

in B

bls/

Day

HFO Bbl/Day HFO (all-in) Price

RECIP 124 MW RECIP 2

24 MWSWRO1

8,000m3

WP Vaderpiet30 MW

RECIP 3 & WHRB44 MWSWRO2

24,000m3

Accomplished till now

40% reduction in HFO Consumption while prices increased with 170%

Page 5: Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

5

Current realities (Transition Phase)

• Higher Fuel Oil consumption, due to:

– Increase wind energy (Renewable Energy) production resulting in

equipment not operating at optimal efficiency levels during the

transition phase

– Roadmap to MSF Zero Water plant “100% SWRO” resulting in

equipment not operating at optimal efficiency levels during the

transition phase

• Drop in electricity sales combined with a high peak demand

The roadmap to HFO reduction & renewable energy increase

Page 6: Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

The road ahead

Strategy WEB Aruba for 2014–2018:

• Further reduce dependency on Heavy Fuel Oil

• Enhance production plant automation with Intelligent

Generation Management System (IGMS)

• Introduce Energy Storage solutions

• Further implementation of affordable renewable

technologies

6The roadmap to HFO reduction & renewable energy increase

Page 7: Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

The road ahead

Strategy WEB Aruba for 2014–2018:

• Investments for 2014-2018 of Afl. 211 Million.

• Realize an extra HFO reduction of approx. 20%.

• Increase renewable penetration from 17% to

approx. 40%.

• Roadmap towards MSF Zero Waterplant “100%

SWRO”.7The roadmap to HFO reduction & renewable energy increase

Page 8: Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

8

The road ahead

60% HFO reduction compared to 2005

Page 9: Presentation OJ Boekhoudt WEB ARUBA CREF Session Aruba 8OCT2014 v2

9

34%

27%

30%

6.7%2.5% 0.2%

FUTURE

TPP RECIP WIND BIOGAS SOLAR HYDROSTOR

Renewable Partition

34%

49%

15%2%

2014

TPP RECIP WIND BIOGAS SOLAR

~ 17% Renewable Energy

~33% Renewable Energy 2015

~40% Renewable Energy 2018