Upload
kaiden-arnott
View
214
Download
1
Tags:
Embed Size (px)
Citation preview
Presentation of UFAB
Agenda
A contract manufacture within these areas of expertise
13 000 Hours 28 000 Hours 35 000 Hours 48 000 Hours
The Mattsson group
• Founded: 1961• Turnover: 35 MEUR• Employees: 200• Operates in:
• Uddevalla• Gothenburg• Säffle• Shanghai
Presentation overview - references
Siemens
• Machining• Welding• Heat treatment• Advanced
manufacturing
National Oilwell Varco
• Subsea• Offshore• Marine
GE Healthcare
• High volume production
• Flexible production• Medicine• Lean production
TT3
• Complete production• Product testing• Full scale testing
before delivery
GKN
• Project team• Communication• Prototype• Engineering• Competence• CAD• Simplicity
Presentation overview – Our way of work
Our way of work MD
Joacim Johansson
Sales
Packaging
Medical
Energy
Manufacturing
Engineering
Mechanical
Automation
Documentation
Mechanical
Automation
Documentation
Mechanical
Automation
Documentation
Mechanical
Automation
Documentation
Logistic
Purchasing
Supplier Quality
Purchasing
Supplier Quality
Purchasing
Supplier Quality
Purchasing
Supplier Quality
Production
Technique
In House Quality
Improvements
Technique
In House Quality
Improvements
Technique
In House Quality
Improvements
Technique
In House Quality
Improvements
QA System
HSE
Management Sys.
Customer Quality
Management Sys.
Customer Quality
Management Sys.
Customer Quality
Management Sys.
Customer Quality
UFAB and the world
Our factory in Uddevalla
• Development and Assembly
• High technical processes
• LEAN production (Cost reduction)
Our factory in Shanghai
• Manufacturing• Milling, turning &
welding• 2 shift operation• Long purchasing
experience
Presentation overview – Capacity
Capacity
13 000 Hours 28 000 Hours 35 000 Hours 48 000 Hours
Capacity – Construction 13 000 hours
• DFM Design For Manufacturing
• DFA Design For Assembly
• ProEngineer, Inventor, SolidWorks, Frame Maker, ELCAD
Capacity – Welding 28 000 hours
• 5 000 m²• License • Stainless steel• Low volume / High
volume
Capacity – Machining 35 000 hours
• 2 100 m²• Low volume – Complex• Machine parts
Capacity – Assembly 48 000 hour
• 5 500 m²• Europe • China
Presentation overview – Finish
Together we´re stronger
Customer references
What can we do for you?