53
03/06/2016 Denis LE ROUX MINnD Project UC6 « Infrastructure and Environment » Barcelona meeting 02/06/2016 1>

Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

03/06/2016

Denis LE ROUX

MINnD Project UC6 « Infrastructure and Environment »Barcelona meeting 02/06/2016

1 >

Page 2: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

1. Setec

2. MINnD Project

3. UC6 – « Infrastructures and environment »

4. Software

5. Data organisation

2 >

OVERVIEW

03/06/2016

Page 3: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3 >

1. setec

03/06/2016

1.1. About

An independent global engineering leader

Page 4: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

Offices & Subsidiaries

Countries of Operation

America Europe Africa Middle East Asia

BrazilCanada

FranceGermanyGreeceHungary

MonacoRussia

EgyptIvory CoastGabon Libya

MoroccoSenegalTunisia

QatarSaudi Arabia

Macau

1. setec

1.2. Offices

Page 5: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

1. setec

1.3. BIM Infra

Contournement Ouest de Strasbourg – TRC de Vendenheim

Page 6: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

1. setec

1.3. BIM

Strasbourg western bypass – RN4 interchange

Page 7: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

1. setec

1.3. BIM

A36 – Sevenans interchange

Page 8: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

Transport and Infrastructure

Building and Urban Planning

Energy and Industries

Sustainable Development

• Upstream Studies

(technical, economic, environmental…)

• Consulting Services, Expertise

• Design and Site Supervision

• Technical Assistance to the Owner

• Owner’s Representative

• Project Management

• Maintenance - Operations

1. setec

1.3. General range of services

Page 9: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

Modélisation des INformations INteropérables pour les

INfrastructures Durables

Interoperable Information Model for Sustainable Infrastructures

Page 10: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

2. MINnD Project

10 >

2. MINnD Project

03/06/2016

� 55 Partners already involved in MINnD

2.1. Project partners

Interoperable Information Model for Sustainable Infrastructures

National research project, www.minnd.fr

PROFESSIONALS• State• Administration• Architects• Universities• Contractors• Design offices• Labs• Operators• Manufacturers• Engineers• Consultants• Training organizations• Software editors

Page 11: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

2. MINnD Project

11 >

2. MINnD Project

03/06/2016 setec

2.2. Presentation

• 4 M€ Project

• 4 Years (2014 – 2018)

Mars2014

Start of the project

January 2016

End of the 1st phase

December2016

UC6 first 2 reports

2018

End of project

2013

Approved by ministry

Page 12: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

2. MINnD Project

12 >

2. MINnD Project

6/3/2016 setec

2.3. Research themes

5 Themes:Th0 MonitoringTh1 UsagesTh2 ExperimentsTh3 Data structuringTh4 Legal aspects

Page 13: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

2. MINnD Project

13 >

2. MINnD Project

03/06/2016 setec

2.3. Uses cases

6 USE CASES :

• UC1 – Standardized use case applied to infrastructure projects

• UC2 – Roads life cycle

• UC3 – IFC Bridge

• UC4 – Project review

• UC5 – Cost containment through modeling

• UC6 – Infrastructures and Environment

Page 14: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

14 >

3. UC6 – Infrastructure and Environment

03/06/2016

Professionals involved in this MINnD Use case :

setec

3.1. Phase 1

Company Field People

VINCI Motorway concessioncompany

Sylvain GUILLOTEAU

IFSTTAR Research organism Denis FRANÇOISAnne RUAS

SETEC Design office Yann LEGALLIC

EGIS Design office Charles-Edouard TOLMER

TERROIK Engineering company for ecological research

Catherine DE ROINCE

Page 15: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

15 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.1. Phase 1 – 2 case studies

setec

Wor

kflo

wS

tape

s

Obj

ect

mod

elis

atio

nUC 6-1 : Infrastructures and noise

Page 16: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

16 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.1. Phase 1 – 2 case studies

setec

Source : UC6-1 MINnD (EGIS)

UC 6-1 : Infrastructures and noise

Page 17: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

17 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.1. Phase 1 – 2 case studies

setec

UC 6-2 : Infrastructures and environment transparency

Fox GPS tracking over 12 hours. © Jolivet 2014

Page 18: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

18 >

3. UC6 – Infrastructure and Environment

6/3/2016

3.1. Phase 1 – 2 case studies

setec

Methods to reach an target. © Jolivet 2014

Walking around an obstacle� Probability = 0

Walking through an obstacle� Probability = 0.3

UC 6-2 : Infrastructures and environment transparency

Page 19: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

19 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.2. Phase 2 - detailed studies

setec

Professionals involved in this MINnD Use case :

Company Department People

VINCI Infrastructures Sylvain GUILLOTEAU

IFSTTAR Research Denis FRANÇOISAnne RUAS

SETEC Project manager, design office

Denis LE ROUXYann LEGALLICMarc CHASSANDEJustine VASSART

EGIS Project manager, design office

Stéphane PRADONCharles-Edouard TOLMERAmos HOUEWATONOU

TEROIKO Engineering company for ecological research

Catherine DE ROINCESylvain MOULHERAT

Page 20: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

20 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.2. Phase 2 - detailed studies

Source : Google Map

setec

2 Sites

Page 21: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

21 >03/06/2016

Source : Geoportail, IGN

3. UC6 – Infrastructure and Environment

setec

3.2. Phase 2 - detailed studies

2 Sites

A64

A63

Page 22: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

22 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.2. Phase 2 - detailed studies

setec

• Model how attractive is an environmental measure

• Model the environment (site)

• � Use the model to decide where to locate the environmental measure

UC 6-2 : Infrastructures and environment transparency

Goals

Page 23: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

23 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.2. Phase 2 - detailed studies

setec

Animals path model map

Bats 3D path models

UC 6-2 : Infrastructures and environment transparency

Goals

• 3D method : • Using animal’s 3D path models• Using site’s 3D models

Page 24: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

24 >

3. UC6 – Infrastructure and Environment

6/3/2016

3.2. Phase 2 - detailed studies

setec

UC 6-2 : Infrastructures and environment transparency

One travel every 50 years

One travel every 25 years

One travel every 10 years

One travel every year

Page 25: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

25 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.2. Phase 2 - detailed studies

setec

UC 6-2 : Infrastructures and environment transparency

• From models (GIS + 3D) • From onsite investigations• � identify possible location for

an environmental measure

• Track reasons for decisions

• Identify documents and procedures dataflow

Goals

Page 26: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

26 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.2. Phase 2 - detailed studies

setec

Usual methodto choose the location of environmental measures

→ 2D method : using GIS technology

UC 6-2 : Infrastructures and environment transparency

Page 27: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

3. UC6 – Infrastructure and Environment

27 >

3. UC6 – Infrastructure and Environment

03/06/2016

3.2. Phase 2 - detailed studies

setec

UC 6-2 : Infrastructures and environment transparency

Usual method

The location of environmental measures is defined according to :

1. available fields = main argument (in those use cases)

2. environmental studies

3. suitable topography for the infrastructure

4. identified animals usual patterns / behaviours

Page 28: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

28 >03/06/2016

3. UC6 – Infrastructure and Environment

Source : DREAL Aquitaine, Atlas SRCE

3. UC6 – Infrastructure and Environment

setec

3.2. Phase 2 - detailed studiesA63 Motorway – Natural environment issues

Page 29: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

29 >03/06/2016

3. UC6 – Infrastructure and Environment

Source : dossier CNPN de l’A63, Setec – 02/2015

Miniopterus schreibersi

Pipistrellus pipistrellus

Pipistrellus kuhlii

3. UC6 – Infrastructure and Environment

setec

3.2. Phase 2 - detailed studiesA63 Motorway – Natural environment issues

Page 30: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

30 >03/06/2016

3. UC6 – Infrastructure and Environment

3. UC6 – Infrastructure and Environment

setec

3.2. Phase 2 - detailed studiesA64 Motorway – Natural environment issues

Source : Google streetview

Page 31: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 31 >6/3/2016

3. UC6 – Infrastructure and Environment

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studies

Available data

Content Format Description Provider ProducerTopography Dwg Elevation model, topography Vinci

DTM Grid ASCII Elevation model IFFSTAR IGN

Arealphotography

Jpeg Orthophotos Setec IGN

Map Shapefile Environmental datas Setec IGN

Map Tiff SCAN25, 1:25000 Setec IGN

Natural environnement

ShapefileVectorial database:environmental data

SetecInventary fromimpact study

A63 Motorway – Available data

Page 32: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 32 >03/06/2016

3. UC6 – Infrastructure and Environment

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesA63 Motorway – Available data

Page 33: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 33 >03/06/2016

3. UC6 – Infrastructure and Environment

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studies

Available data

Content Format Description Provider

Animal crossing Citygml 3D model of the bridge Vinci

Animal crossing Dwg Phasing plans Vinci

Topography Dwg Elevations, topography Vinci

DTM Grid ASCII Elevations IFFSTAR (IGN)

A64 Motorway – Available data

Page 34: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 34 >03/06/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesA64 Motorway – Available data

Shapefiles

From IGN From Setec

Buildings Wildlife inventory

RoadsWildlife natural environment issues

Hydrography Protected areas

VegetationList of the protected flora and fauna Animal crossing

GIS data

Page 35: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 35 >03/06/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesModeling - The Good, the Bad and the Ugly

3. UC6 – Infrastructure and Environment

• Three scenarios for fences1. Usual environmental measures project (what have

been applied)2. A very cheap project3. A project defined as the most efficient

• Test the efficiency of models

Page 36: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 36 >6/3/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesModeling - The Good, the Bad and the Ugly

3. UC6 – Infrastructure and Environment

Type of fences

New permeable fences

News fences

Page 37: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 37 >6/3/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesModeling - The Good, the Bad and the Ugly

3. UC6 – Infrastructure and Environment

Usual project

Existing fences New permeable fences

Limit of available lands News fences

Page 38: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 38 >6/3/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesModeling - The Good, the Bad and the Ugly

3. UC6 – Infrastructure and Environment

Very cheap project

Existing fences New permeable fences

Limit of available lands News fences

Page 39: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 39 >6/3/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesModeling - The Good, the Bad and the Ugly

3. UC6 – Infrastructure and Environment

Most efficient project

Existing fences New permeable fences

Limit of available lands News fences Landscaping

Page 40: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 40 >6/3/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesModeling - The Good, the Bad and the Ugly

3. UC6 – Infrastructure and Environment

Landscaping

Available land

Existing fences

Forest borders to be landscaped

Page 41: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 41 >6/3/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesModeling - The Good, the Bad and the Ugly

3. UC6 – Infrastructure and Environment

Landscaping

Permeable fences

Page 42: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 42 >6/3/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesModeling - The Good, the Bad and the Ugly

3. UC6 – Infrastructure and Environment

Landscaping

Page 43: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 43 >03/06/2016

3. UC6 – Infrastructure and Environment

3.2. Phase 2 - detailed studiesModeling

3. UC6 – Infrastructure and Environment

• Many data types

• Content not unified

Page 44: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 44 >6/3/2016

4. Software

4. Software

4.1. Needs and abilities

Ability to : • manage many types of data

• manage large models

• connect to servers

Page 45: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 45 >6/3/2016

4. Software

4. Software

4.1. Needs and abilities

Software / Solution Editor TypeMicroStation, ProjectWise, AssetWise,…

Bentley Solution

Novapoint VDC Vianova Model federation

Mensura Geomensura CAD

Covadis Geomedia CAD

ArcGis Esri SIG

QGis Qgis SIG

Civil 3D, Infraworks, Revit, Navisworks

Autodesk Solution

FME Safe software Data transformation

Page 46: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 46 >03/06/2016

4. Software

4. Software

4.2. Goals

DB

3D MODEL

Communicate

Scheme

Analyze

Interoperability

Page 47: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 47 >03/06/2016

4. Software

4. Software

4.3. Actual issues

Hardware: • Heavy models• Sharing with others (not CAD

users)

Data :• Not structured• Lost when changing format• Not reliant to our needs

Software :• Partial coverage of needs• Approach specific to the software

Page 48: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 48 >6/3/2016

4. Software

4. Software

4.4. Tests and results from the two sites

TIN

Survey

Global model

Achievements so far…

Page 49: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 49 >03/06/2016

4. Software

GIS in the 3D model

4. Software

4.4. Tests and results from the two use cases Achievements so far…

CityGML in the 3D model

Page 50: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 50 >03/06/2016

4. Software

Creation of landscaping

4. Software

4.4. Tests and results from the two use cases Achievements so far…

Automatic representation of fences from shp

Page 51: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 51 >03/06/2016

5. Data organization

5. Data organization

5.1. What to organise

Workflow : • Who needs what and when• What for ?

Data :• To structured• Level of Details / Development

History :• Trace decision taking• Make it available for everyone• Data storage, hardware and format

lifetime

Page 52: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

setec 52 >03/06/2016

5. Data organization

5. Data organization

5.2. Use case for data : Fences

Geometry : • 2D / 3D• Linked to other objects ?• Detailed geometry

Attributes:• Height / mesh size• Permeability

History :• Location• Temporary or not• Maintenance• …

Page 53: Presentation MINnD Barcelone 02 06 2016€¦ · Denis LE ROUX MINnD Project UC6 ... 1. setec 1.3. BIM A36 – Sevenans interchange. Transport and Infrastructure Building and Urban

www.setec.frSetec

Immeuble Le Crystallin– 191/193, coursLafayette - CS 20087 –69458 Lyon Cedex 06

[email protected]

Thank you to :

[email protected]

Thank you for your attention