19
Myanma Posts and Telecommunications Presentation from the Union of Myanmar Country Report To GMS-ISN Ninth Subregion Telecommunications Forum (STCF-9) 2-3 June 2009 Land: 676,577sq.km States & divisions: 14 Townships: 324 Population: 57 million Urban, rural ratio: 30:70 Capital: Naypyitaw Land borders: Bangaladesh, China, India, Thailand, Laos, a glance into Myanmar Nay Pyi Taw, the new capital Appendix 4D Page 1 of 19

Presentation From the Union of Myanmar

Embed Size (px)

Citation preview

Page 1: Presentation From the Union of Myanmar

Myanma Posts and Telecommunications

Presentation from the Union of Myanmar

Country Report To GMS-ISN

Ninth Subregion Telecommunications Forum (STCF-9) 2-3 June 2009

• Land: 676,577sq.km

• States & divisions: 14

• Townships: 324

• Population: 57 million

• Urban, rural ratio: 30:70

• Capital: Naypyitaw

• Land borders: Bangaladesh,

China, India,

Thailand, Laos,

a glance into Myanmar

Nay Pyi Taw,

the new capital

Appendix 4DPage 1 of 19

Jay
Text Box
The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.
Page 2: Presentation From the Union of Myanmar

o Total Tele lines: 1,114,666

– Fixed lines: 511,316 (auto/manual)

– Mobile lines: 603,350

• Teledensity: 1.96%

• Internet hosts: 25,690

• Internet bandwidth: 975 MB

• Internet subscribers: 39,220

• Internet users: 196,100

• MPT Satellite terminals: 975

• Public Access Centers: 191

• No. of PCs: 400,000

• Satellite terminals/stations: 1,471

(MPT Sat. terminals/VSAT E1 Stations/ VSAT Stations)

ICT Infrastructure

International Gateways: 2(IGW DMS-300/EWSD)

International channels: 2471Internet gateway: 1Packet exchange: 1

ISP : 2 (MPT & Myanmar Teleport)PSTN Exchanges: 902Mobile Exchanges: 11Transit Exchanges: 9Microwave Stations: 266

Accessible through:

Dial up -64kbps

ISDN-128 kbps

ADSL 2+ - 256 ~ 2048 kbps

a glance into Myanmar

Telecom PolicyTelecom Policy

� To increase the deployment of national telecommunications infrastructure.

� To provide a financially viable telecommunications sector conductive to sustainable investment in telecommunications infrastructure.

� To improve the efficiency and effectiveness of telecommunications service delivery to end users.

� To cost effectively satisfy end-user demand for telecommunication service.

� To provide telecommunication services at the affordable price.

� To fulfill universal services obligation to the people of Myanmar.

� To reduce the digital divide.

Appendix 4DPage 2 of 19

Page 3: Presentation From the Union of Myanmar

ICT PolicyICT Policy

• Promote cooperation for ICT development

• Enhance competitiveness of the ICT sectors

• Promote cooperation to reduce digital divide

• Promote cooperation between public and private sectors

• Increase the availability of information technologies to all the

citizens of Myanmar

Legal Infrastructure

� Myanmar Telegraphy Act (1885)

� Myanmar Wireless Telegraphy Act (1985), (Amended 1996)

�� The Computer Science Development Law (2002)The Computer Science Development Law (2002)

�� The Electronic Transaction Law (2004)The Electronic Transaction Law (2004)

�� The Telecommunications Law (Final Draft)The Telecommunications Law (Final Draft)

�� preparing rules & regulations for ETLpreparing rules & regulations for ETL

� creation of a Certification Authority systemcreation of a Certification Authority system

�� harmonization of ecommerce legal harmonization of ecommerce legal

infrastructure within ASEAN countriesinfrastructure within ASEAN countries

Appendix 4DPage 3 of 19

Page 4: Presentation From the Union of Myanmar

Ministry of Communications, Posts and Telegraphs (MCPT) is the

overseeing ministry for the ICT development implementation

processes all over the country

Overseeing Organizations for Telecoms Overseeing Organizations for Telecoms

& ICT Development& ICT Development

Regulator Operator

Ministry

Kawthaung

Exchange Status

Auto phone Exchange - 307

Manual Exchange - 595

CDMA Exchange - 5

Cellular Exchange - 3

GSM Exchange - 3

Transit Exchange - 9

International Exchange - 2

Packet Exchange - 1

Myeik

Dawei

Appendix 4DPage 4 of 19

Page 5: Presentation From the Union of Myanmar

Intelsat ( 60 HE )

From Mumbai

Branching Unit – 4.4

To Tuas

R409R410

R411R412

R413R414

R415R416

R407R408

Landing PointKalahtaikR401

R402R403

R404R405R406

PyaponTerminal Station

YangonThanlyin

Thaicom 1-A ( 120 HE )

To Other Countries

To Thailand

SEA-ME-WE 3 Submarine Cable

Measat

To Malaysia

International CommunicationsInternational Communications

Types of Links� Satellite

communications

�SEA-ME-WE

connection

�Cross-border fibre

link(STM-64)

�Cross-border

Microwave links to

China & Thailand

(STM (4+1) SDH)

TamuMuse

Tachileik

Myawadi

To India

To China

To Thailand

Cross border fiber link

MyanmarMyanmar’’s Telecoms & ICT Development s Telecoms & ICT Development

ActivitiesActivities

Policy

• Ministry of Communications, Posts

and Telegraphs

• Myanmar Computer Science Development Council

3-layer model3-layer model

Regulation

� Posts and

Telecommunications Department

Regulation

� Posts and

Telecommunications Department

Implementation

� Myanma Posts and

Telecommunications

� Myanmar Teleport

� Myanmar Computer

Federation

� Semi-Gov & NGO bodies

Implementation

� Myanma Posts and

Telecommunications

� Myanmar Teleport

� Myanmar Computer

Federation

� Semi-Gov & NGO bodies

Appendix 4DPage 5 of 19

Page 6: Presentation From the Union of Myanmar

iPSTARSatellite

AnalogPhones

C-Band MPT Satellite Terminal

ATA

1.8 m

Internet & e-Mail

MPT Satellite Terminal Rural Communications System ConfigurationMPT Satellite Terminal Rural Communications System Configuration

ToegyaunggalayKu-Band Gateway

Fiber Cable

Thaicom-5

Satellite

Thanlyin Diversity

ISP

PSTNVoIP

I.T.M.C

Fib

er

Ca

ble

Fib

er

Ca

ble

Taungdwingyi

C-Band Gateway

Ku-Band MPT Satellite Terminal

ATA

1.2 m

Internet & e-Mail

AnalogPhones

Appendix 4DPage 6 of 19

Page 7: Presentation From the Union of Myanmar

Wan Pong

Hongkong

Satun

Sea-Me-We 3 Submarine

Cable

Other Submarine Cable

Cross Border Links

Naypyitaw

Mandalay

Yangon

MorahTamu

New Delhi

India

Myawaddy

Muse

Shweli

China

Lao

Thailand

Bangkok

Vientiane

Mae Sot

Kawthaung

Tachileik

Mesai

Pyapon

Renaong

SCOPE OF GMS WORKS FOR MYANMAR

�MOBILE COMMUNICATIONS

� AUTO TELEPHONE

� LONG DISTANCE COMMUNICATIONS

- MICROWAVE LINKS

-FIBRE OPTIC LINKS

� INFORMATION TECHNOLOGY

Appendix 4DPage 7 of 19

Page 8: Presentation From the Union of Myanmar

� MOBILE COMMUNICATIONS

- GSM Mobile System including capacity 160,000.

- (49) Radio based stations in provincial towns with 71,200 capacity.

� AUTOTELEPHONE

- Expansion of 4,500 Lines in Naypyitaw.

- Expansion of 7,000 Lines in Yangon.

- Expansion of 4,000 Lines in Mandalay, 3,500 in Lashio and 500 Lines

in Yadanarbon City.

SCOPE OF GMS WORKS FOR MYANMAR

� LONG DISTANCE COMMUNICATIONS

(a) Microwave Links

- STM-4+1 Microwave Link between Mandalay and Muse.

- STM-4+1 Microwave Link between Yangon and Myawaddy.

(b) Optical Fibre Links

- STM-64 System between Mandalay and Muse.

- STM-64 System between Yangon and Myawaddy.

- STM-64 System between Naypyitaw and IGW.

- STM-64 System between Yangon- Maubin- Pyapon.

SCOPE OF GMS WORKS FOR MYANMAR

Appendix 4DPage 8 of 19

Page 9: Presentation From the Union of Myanmar

� INFORMATION TECHNOLOGY

- To implement the new ISP in Yangon.

- Next Generation Network and Softswitch in Mandalay.

- CATV, Incubation building in Yadanarbon City.

SCOPE OF GMS WORKS FOR MYANMAR

GMS PROJECT PROGRESS

OVER ALL PROGRESS

BTS 100 %

PSTN 100 %

MSC 100 %

SDH 100 %

MW 100 %

NGN 97 %

IDC 100 %

IP-METRO 100 %

ACCESSSS 100 %

CATV 100 %

TOTAL 99.7%

Appendix 4DPage 9 of 19

Page 10: Presentation From the Union of Myanmar

LONG DISTANCE LONG DISTANCE

COMMUNICATIONSCOMMUNICATIONS

STM-64 Fiber Links

between

Mandalay and Muse,

Naypyidaw and IGW,

Yangon and Myawaddy

have been already completed

STM- 4+1

Microwave Links between

Mandalay and Muse,

Yangon and Myawaddy

have been already completed

Appendix 4DPage 10 of 19

Page 11: Presentation From the Union of Myanmar

STM-64 Equipment (Fiber Optic)in MUSE

(Mandalay ~ Muse Link)100% Completed

STMSTM--64 Equipment (Fiber Optic)64 Equipment (Fiber Optic)

in MUSEin MUSE

((Mandalay ~ Muse Link)Mandalay ~ Muse Link)

100% Completed100% Completed

• STM-4+1 Equipment (Microwave) in MUSE

(Mandalay ~ Muse Link)

• 100% Completed

•• STMSTM--4+1 Equipment 4+1 Equipment (Microwave) (Microwave) in MUSEin MUSE

(Mandalay ~ Muse Link)(Mandalay ~ Muse Link)

•• 100% Completed100% Completed

Appendix 4DPage 11 of 19

Page 12: Presentation From the Union of Myanmar

STM-64 Equipment (Naypyitaw~IGW Link) 100% Completed

STMSTM--64 Equipment (Naypyitaw~IGW Link) 64 Equipment (Naypyitaw~IGW Link)

100% Completed100% Completed

Mandalay~Muse Microwave Link Implementation Progress

completion

Man

dala

y

Pt-4

753

Lo

ilam

Pt-2

800

Lo

ish

an

Sin

tau

ng

Lo

isan

sik

84

86

88

90

92

94

96

98

100

13-m

iles

Byu

hark

on

e

Mu

se

Appendix 4DPage 12 of 19

Page 13: Presentation From the Union of Myanmar

Yangon~Myawaddy Southern Microwave Link Implementation Progress

Yan

go

n

Kh

ayan

Th

ato

n

Pa-a

n

Kaw

kara

ke

Pt-2

718

Myaw

ad

dy

84

86

88

90

92

94

96

98

100

completion

Auto TelephoneAuto Telephone

Appendix 4DPage 13 of 19

Page 14: Presentation From the Union of Myanmar

Implementation Progress - PSTN

Ba

ha

n H

ost

RS

U1

1 Y

an

kin

Insein

Host

ISN

RS

U3

Ha

nth

aw

ad

y H

ost

RS

U2

5 W

ater P

um

p

RS

U2

6 K

ya

ikw

ai

RS

U2

7B

ayin

tna

un

g

Ma

un

gta

ula

y h

ost

RS

U2

4 M

inister O

ffice

RS

U2

5 B

ota

tau

ng

Ma

nd

ala

y H

ost

MD

L-R

SU

10 M

ya

uk

pyin

MD

L-R

SU

11 M

ah

am

yin

g

MD

L-R

SU

12 M

PT

GH

MD

L-R

SU

13 S

ha

nsh

u

MD

L-R

SU

8 T

eleport

MD

L-R

SU

9 T

eleport

LS

H-L

ash

io H

ost

LS

H-R

SU

1

LS

H-R

SU

2

LS

H-R

SU

3

NP

T-N

ayp

yita

w H

ost

NP

T-R

SU

19

NP

T-R

SU

20

NP

T-R

SU

21

NP

T-R

SU

22

NP

T-R

SU

23

NP

T-R

SU

24

NP

T-R

SU

25

NP

T-R

SU

26

Implementation Progress~PSTN

Completion

100

80

60

40

20

0

MOBILE COMMUNICATIONSMOBILE COMMUNICATIONS

Appendix 4DPage 14 of 19

Page 15: Presentation From the Union of Myanmar

Implementation Progress - MSC

� HLR expansion done and upgrade to be rescheduled by the end of Dec 2008.

� GPRS PAT depends on for HLR upgrade.

� MSC ATP Complete

� MSC SW Complete

� MSC HW Complete

� MSC Site ready

0

10

20

30

40

50

60

70

80

90

100

GPRS USBS Mini USBS MSC HLR

completion

Implementation Progress - BTS

� BTS ATP Complete

� BTS SW Complete

� BTS HW Complete

� BTS Site ready

Ya

ng

on

-MG

LD

Ya

ng

on

-Au

ng

Sa

n P

O

Ya

ng

on

-S-O

ak

ka

lap

a P

O

Ya

ng

on

-N-O

ak

ka

lap

a P

O

Ya

ng

on

-N-O

ak

ka

lap

a E

x

Ya

ng

on

-Bo

ut

Ya

ng

on

-YC

DC

Ya

ng

on

-Gy

oG

on

e P

G

Ya

ng

on

-Go

lf Ra

ng

e

Ya

ng

on

-Th

u W

un

Na

Sta

diu

m

Ya

ng

on

-Th

iri C

on

do

min

ium

Ya

ng

on

-Sin

Ma

La

ik

Ya

ng

on

-Ya

ng

on

GP

O

Ya

ng

on

-Hlg

PO

Ya

ng

on

-Sa

ya

r S

an

Pla

za

Ya

ng

on

-Tele

po

rt

Ya

ng

on

-Ag

retu

ra

t bea

ns

Ya

ng

on

-Pa

n H

lain

g G

C

Ya

ng

on

-No

rth

Ya

ng

on

-

Hle

gu

-Hle

gu

Ex

Ind

ag

aw

Ba

go

My

oth

it

Py

ai A

un

g S

an

Py

itha

ya

r

Py

i Mic

ro

St

Ta

un

g N

gu

MW

Sta

tion

Ta

un

g N

gu

TV

Sta

tion

Au

ng

La

n M

W S

t

Tw

an

Te

Ma

gew

MW

St

Min

Bu

MW

St

Ma

wla

my

ing

TG

Ma

wla

my

ing

MW

St

Ma

wla

my

ing

Na

t Ta

un

g P

O

Hp

a-a

n T

G

Hp

a-a

n M

W S

t

My

aw

ad

y S

ate

llite S

t

Lo

ika

w M

w S

t

Ky

au

k M

ae M

w S

t

Th

ipa

w P

O

Ka

law

MW

St

Au

ng

Ba

n E

x

HeH

O M

PT

My

eik

MW

St

My

eik

Tele

po

rt

Ka

w T

ha

un

g A

rm

y P

O

Ka

w T

ha

un

g 5

55

Sittw

e M

W S

t

Sittw

e M

RT

VC

om

ple

tio

n

Appendix 4DPage 15 of 19

Page 16: Presentation From the Union of Myanmar

Implementation Progress - BSC

0

10

20

30

40

50

60

70

80

90

100

MFSB7 to B8

BSC1 B7 to B8

BSC2 B7 to B8

OMCR B7-B8

RNP

BSC3

BSC4

TC2

completion

� The PAT for RNP to be performed.

� RNO has launched.

� BSC ATP Complete

� BSC SW Complete

� BSC HW Complete

� BSC Site ready

INFORMATION TECHNOLOGYINFORMATION TECHNOLOGYINFORMATION TECHNOLOGY

Appendix 4DPage 16 of 19

Page 17: Presentation From the Union of Myanmar

WS3-NGN

Completion

010

20

30

40

50

60

70

80

90

100

Telep

ort

MG

C

Man

dala

y

TG

1

Nay

py

itaw

TG

2

1stC

ut

Over

2n

d C

ut

Over

C

o

m

p

l

e

t

i

o

n

Access Implementation

0

25

100

75

50

ACCESS IMPLEMENTATION

Ya

da

na

pon

residen

tial

area

Dsla

m 1

Dsla

m 2

NP

T O

ffice 1

NP

T O

ffice3

NP

T O

ffice 3

(2)

NP

T O

ffice 5

NP

T O

ffice 8

NP

T O

ffice 1

6

NP

T O

ffice 1

9

NP

T O

ffice 2

3

Appendix 4DPage 17 of 19

Page 18: Presentation From the Union of Myanmar

Implementation Progress - IP

IP Implementation

IP M

etro

IDC

HT

D

Co

mp

leti

on

100

80

90

50

25

0

Implementation Progress -CATV

0

10

20

30

40

50

60

70

80

90

100

Contro

l

Room

Incubatio

n

1

Incubatio

n

2

Incubatio

n

7

completion

Appendix 4DPage 18 of 19

Page 19: Presentation From the Union of Myanmar

Conclusion

The Government of the Union of Myanmar has a strong desire to reduce the

country’s digital divide and is therefore making efforts to establish connectivity

throughout the country.

GMS countries are more or less similar and cooperation in terms of knowledge

sharing can help all the member countries.

On behalf of the Government of the Union of Myanmar and Ministry of

Communications, Posts and Telegraphs, I would like to thank

Mr. Thein WinChief EngineerLong Distance Communications Dept.Myanma Posts and TelecommunicationsMinistry of Communications, Posts and Telegraphs

Appendix 4DPage 19 of 19