6
1 9th EMODnet Steering Committee Meeting Mallorca, 21-23 March 2018 Contracting Authority Contact point: EMFF unit A.3

Presentation Easme for EMODnet SC Mallorca 21 23 …...2018/03/27  · Microsoft PowerPoint - Presentation Easme for EMODnet SC Mallorca 21 23 March Author annea Created Date 3/27/2018

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentation Easme for EMODnet SC Mallorca 21 23 …...2018/03/27  · Microsoft PowerPoint - Presentation Easme for EMODnet SC Mallorca 21 23 March Author annea Created Date 3/27/2018

1

9th EMODnet Steering Committee MeetingMallorca, 21-23 March 2018

Contracting AuthorityContact point: EMFF unit A.3

Page 2: Presentation Easme for EMODnet SC Mallorca 21 23 …...2018/03/27  · Microsoft PowerPoint - Presentation Easme for EMODnet SC Mallorca 21 23 March Author annea Created Date 3/27/2018

2

Overview of EMODnet contracts managed by EASME – start dates and duration

2017-1.3.1.6 EMODnet Secretariat 18/09/2017 24

2016-1.3.1.2_7 Secretariat support 21/12/2016 12

2015-1.3.1.3 Ingestion and safe-keeping of marine data 19/05/2016 36

2014-1.3.1.3_1 Arctic 16/06/2015 36

2014-1.3.1.3_2 Atlantic 27/08/2015 36

2014-1.3.1.3_3 Baltic Sea 17/06/2015 36

2014-1.3.1.3_4 Black Sea 15/07/2015 36

2015-1.3.1.7 HR Seabed Mapping 20/12/2016 24

2016-1.3.1.2_1 Geology 12/04/2017 24

2016-1.3.1.2_2 Habitats 5/05/2017 24

2016-1.3.1.2_3 Physics 29/03/2017 24

2016-1.3.1.2_4 Chemistry 6/03/2017 24

2016-1.3.1.2_5 Biology 19/04/2017 24

2016-1.3.1.2_6 Human activities 3/03/2017 24

2014-1.3.1.4 Coastal mapping 26/06/2015 36

Timeline Contracts

1/1/2015 1/1/2016 1/1/2017 1/1/2018 1/1/2019 1/1/2020

EMODnet Secretariat

Secretariat support

Ingestion and safe-keeping of marine data

Arctic

Atlantic

Baltic Sea

Black Sea

HR Seabed Mapping

Geology

Habitats

Physics

Chemistry

Biology

Human activities

Coastal mapping

Duration of EMODnet projects

Page 3: Presentation Easme for EMODnet SC Mallorca 21 23 …...2018/03/27  · Microsoft PowerPoint - Presentation Easme for EMODnet SC Mallorca 21 23 March Author annea Created Date 3/27/2018

3

Duration of contracts

• SBC contracts and data ingestion 36 months:SBC finishing 2018 –> no follow-up in WP DG MARE for 2018, 2019

• Thematic portals: contracts 24 monthsContracts may be renewed up to 24 months. This is however not guaranteed, as it depends on the future priorities of the Commission and on budget availability.

Reporting

• SBC: Reporting on future of SBC after contractAwaited: DAR2 & panel meetings-> inform EASME of dates

• Thematic portals:Reporting on the different tasks/not only WP

Page 4: Presentation Easme for EMODnet SC Mallorca 21 23 …...2018/03/27  · Microsoft PowerPoint - Presentation Easme for EMODnet SC Mallorca 21 23 March Author annea Created Date 3/27/2018

4

Task 1: Develop a common method of access to data held in repositories Task 2: Construct products from one or more data sources that provide

users with information about the distribution of parameters in time and space

Task 3: Develop procedures for machine-to-machine connections to data and data products

Task 4: Develop a web portal allowing users to find, visualise and download data

Task 5: Ensure the involvement of regional sea conventionsTask 6: Facilitate interoperability with data distributed by non-EU

organisationsTask 7: Install a process to monitor performance and deal with user

feedbackTask 8: Operate a help desk offering support to users

Tasks (Annex I - 1.4.1)

Reporting: points of attention

- Collaboration/contacts with the Regional SeaConventions – progress made ?

- Interoperability with data of non-EU organisations - Collaboration/interactions between the portals- Efforts done to promote the portals ?- New products/services to be offered ? -> User feedback !

Page 5: Presentation Easme for EMODnet SC Mallorca 21 23 …...2018/03/27  · Microsoft PowerPoint - Presentation Easme for EMODnet SC Mallorca 21 23 March Author annea Created Date 3/27/2018

5

Reporting: points of attention

- User Feedback and Identification: not all on the same line regarding registration of users-> a common approach ?-> guidelines secretariat

Be aware of GDPR (General Data Protection Regulation) in collecting and processing personal data-> Regulation (EU) 2016/679 -> stronger rules on data protection from 25 May 2018 See: https://ec.europa.eu/info/law/law-topic/data-protection_en

Contacts

Functional mailbox:

[email protected]

[email protected][email protected][email protected]

Page 6: Presentation Easme for EMODnet SC Mallorca 21 23 …...2018/03/27  · Microsoft PowerPoint - Presentation Easme for EMODnet SC Mallorca 21 23 March Author annea Created Date 3/27/2018

6

THANK YOUFOR YOUR ATTENTION

Anja DetantEMFF unit, sector A3.2

Policy [email protected]

EASME on Twitter @H2020EE • @H2020SME • @EEN_EU • @EU_ECOINNO