Presentation by Presentation by GM, CR 30 th May 2018

Presentation by GM, CR - Indian Railway• Terminal capacity –Adequate handling and maintenance facility & their segregation to avoid shunting (500 shunts / day at ALD Jn) • Junction

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Presentation by Presentation by GM,CR

30th May 2018

C hi G d

Average Speed of Trains on IR (kmh)Coaching Goods

2016-17 2017-18 2016-17 2017-18

Duranto 70.78 70.08 Jumbo 23.75 21.75

Rajdhani 70.47 71.35 BOXN 22.35 22.05

S/Fast M/Exp. 55.59 55.16 Container 24.85 22.60

M/Exp 45.64 45.07 BTPN 24.25 23.00

Average speed : Mail/Exp - 60.42 kmhG d 20 89 k h (l d d) & 22 7 k h ( t )

Passenger 32.94 33.61 BOST/ BRN 25.15 22.30

Goods - 20.89 kmh (loaded) & 22.7 kmh (empty)

Reasons for less speeds : A VICIOUS CYCLE :

Speed restrictions, Asset Failures, Blocks, LC Gates, Unusual (CRO/TPRO),

Congestion, Terminal Capacity, Multiple stoppages, Ghat & Graded sections.

April-2018 DRNT RAJ SHT JHS SUF MEX GBR TOTAL

Average Speed of Trains (kmh)p

CR 70.64 69.68 70.90 53.55 57.33 49.33 58.28 54.21IR 72.61 73.03 69.47 60.24 57.92 46.50 60.09 52.21Difference 1 97 3 35 +1 43 6 69 0 59 +2 83 1 81 +2 00Difference -1.97 -3.35 +1.43 -6.69 -0.59 +2.83 -1.81 +2.00 Average speed of over all Mail/Exp trains & Passenger trains on

C.Rly are higher than Indian Railways.N f St f CR d t iNo. of Stoppages of CR owned trains

On CR On IR

No of Duration (minutes) No of Duration (minutes) Distance DistanceNo of Halts

No of Halts

Duration (minutes)(in IR) km

Distance per Halt kmTotal Avg/ Halt Total Avg/ Halt

11 60 5.5 23 138 6 1080.6 47.0 Average time for Deceleration & Acceleration from Home to

Starter Signal (excl. halt) is 11 minutes for bigger yard e.g. KYN &7 minutes for smaller yard e.g. Nasik. Time loss due to stoppage ranges from 13 min to 17 min / halt Time loss due to stoppage ranges from 13 min. to 17 min / halt. Longer and frequent stoppages create congestion at Junction

points and en-route which reduce over-all speed.

PSR : Time loss due to large number (C. Rly.- 677 PSR in

Dampeners  of  Speedg ( y

4100 Route kms @ 17 restrictions / 100 km)

Asset Failures & Unusual : 1st – 27th May 2018 – On IR, @ /42,848 cases delayed 60,258 trains @ Avg. 1587 cases / day

delaying 2232 trains / day

Acceleration and Deceleration due to Multiple stoppages (Halt at every 47 km)

Ghat sections & Gradients in Sections Ghat sections & Gradients in Sections

Mismatch of Speed of different train services on account of P Way & Rolling stockP Way & Rolling stock.

Speed differential of trains results in over-all slowing down M/Exp (130/ 120/ 110/ 105 kmh)p ( ) Goods (100/ 80/ 75/ 65/ 60/ 40 kmh) Pass. Trains (32 to 40 kmh – Avg. Speed)

Dampeners of Speed

Reversal at Junction Stations- due to non availability of chord line / Rail flyover.

Surface Rail Crossings causing serious constraints on Trunk Routes (14 crossings on NGP-BPQ (211km) section on account of Goods shed / sidings).

Existence of Level crossing gates.

Inadequate capacity and longer halts at Junction stations cause Inadequate capacity and longer halts at Junction stations cause detentions / slowing down.

Terminal Constraints and Section Congestion both for Coaching and Terminal Constraints and Section Congestion both for Coaching and Freight trains.

Watering and cleaning at Junction stations (halts due to CTS). g g ( )

Existing Traction Change (Uni-traction work in progress).

Service strategy : To achieve Avg speed –

Deciding Sectoral Strategy Service strategy : To achieve Avg. speed –

Premium services - 90 - 100 kmhSuper Fast trains - 80 - 90 kmh other Mail/Exp. - 70 - 80 kmhother Mail/Exp. 70 80 kmhMEMU/ DEMU - 50 – 60 kmh

Route strategy : Speeding up trains on Golden Quadrilateral and Diagonal Routes.g

Infrastructure strategy :• Terminal capacity – Adequate handling and maintenance facility &

their segregation to avoid shunting (500 shunts / day at ALD Jn)• Junction station design – Should avoid surface crossing of traffic

coming from different directions (Chord lines & Grade separators)• Upgradation of Track to increase Speed Potential to 110/120/130 kmh

(C&M I / Vol I needs review)(C&M I / Vol-I- needs review) Rolling Stock strategy –

• Uniformity in speed of various types of Rolling stock -Coaching stock – 61 types, Goods stock – 68 typesCoaching stock 61 types, Goods stock 68 types

• Replacement of rolling stock by LHB coaches & MPS of 130 / 160 kmh

Varying speeds of trains among Mail/ Exp & Freight causes

MPS of Passenger and Freight Trains

Coaching (kmh) Goods (kmh)

Varying speeds of trains among Mail/ Exp. & Freight causescomplex issues of precedence within the same type of service

Type (60 variants)

Speed Type (68 variants)

Loaded(CC +9+1) Empty

Gatiman 160 BCNHL 65 65Rajdhani /Shatabdi / Duronto

130* BCN / BCNHS 75 / 60 80 / 100

Garib Rath 120 BOXN 60 80Garib Rath 120 BOXN 60 80M/Exp trains 110 BOXNHL 60 100Passenger Trains 100 BRN/ BOST 75 / 60 80DEMU 90 BTPN 75 80MEMU (New) 110 BLC 100 100

* All Rajdhani/ Duronto Exp do not run at 130 kmhAll Rajdhani/ Duronto Exp do not run at 130 kmhSpeed potential of loco and coaches varies from 110 to 160 kmhMPS to be enhanced to 160 kmh / 130 kmh (AC / Non AC) for all

coaching trains.

Strategy & Innovations in Operational Practices :Coaching Operation

Maximum halt time of Mail/ Exp. trains to be reduced to 5 minutes atJunction stations. Synchronising all activities.

p g p

Rationalization of stoppages : guideline for Mail / Exp. @ 200 km,Superfast trains @ 300 km, Rajdhani / Duranto @ 400 – 500 km matchingwith crew change requirement.

Revamping of Paths, Platform Occupation and Maintenance facilities.

All LHB Trains should run at 160 kmh / 130 kmh. Trains to run in convoysystemy

Speeding up by eliminating loose timings at various Inter RailwayInterchange points

Discontinuation of poorly patronized services to enable creation of path Discontinuation of poorly patronized services to enable creation of pathfor other trains.

Discontinuation of slow moving Passenger train service fromQuadrilateral and Diagonal Routes till provision of separate suburbanQuadrilateral and Diagonal Routes, till provision of separate suburbancorridor.

Discontinuation of Slip coaches and combined Coaching (link) trains.

Strategy & Innovations in Operational Practices : Freight Operationg p

Discipline in running twin pipe Freight Trains.Additional loop lines to facilitate precedence of HighAdditional loop lines to facilitate precedence of High

speed trains over others (40/ 60/ 100 kmh).Long Haul operations of Freight Trains : Facility of LongLong Haul operations of Freight Trains : Facility of Long

Haul loops is also required on 3rd line on busy routes.Maximizing Running of Crack and Rocket Trains.Universalisation of Maintenance of CC – rakes.Universalisation of Maintenance of Locomotives –

Diesel / Electrical. To begin with Failed Power should beattended in nearest shed to avoid end to endinfructuous runninginfructuous running.

Strategy & Innovations in Operational Practices : Freight Operation

Loco Fitness and Acceptance at Inter RailwayI t h i t i R li bilit f L ti

g p

Interchange points – an issue. Reliability of Locomotiveneeds to be improved.

Control on Failures of Rolling Stock, S & T, OHE, Trackand others(CRO, Incidence, ACP, Theft, Fire, Weather,Doctor’s call etc.) : 3 hrs of capacity is wasted/ day.Doctor s call etc.) : 3 hrs of capacity is wasted/ day.

Eliminating Overloading of wagons, especially Coal - aserious concernserious concern.

Strategy & Innovations in Operational Practices

Points & X-ing of Loop lines on Quadrilateral andDiagonal Routes to be made fit for 50 kmph.

Methodology to reduce duration of Block formaintenance needs to be designed.

D i i kill & fid l l f L Pil t t b Driving skill & confidence level of Loco Pilots to beincreased by provision of Loco Simulator in eachdivision for Locos, MEMU / DEMU.

Strengthening Control monitoring through Automationand Technology upgradation in busy route. DeputingA i t t C t ll t d k l d /Assistant Controllers to reduce work load / pressureon Controllers.

Recommendations Universal Certification of Rolling Stock eliminating need for

individual sanctioning of route & stocks from CRS.

60 t f C hi lli t k (C ti l CBC & LHB) N t 60 types of Coaching rolling stock (Conventional, CBC & LHB). NotReplaceable, thus large inventory causing congestion.

Standardization of Coaching Rakes will enable First in First out Standardization of Coaching Rakes will enable First in First out,reduce Rescheduling and avoid out of path running.

Variety of Freight stock (68 types) with different loadability and Variety of Freight stock (68 types) with different loadability andspeed create maintenance and running problems.

On Golden Quadrilaterals and Diagonal Routes sidings are takingg g goff from Main line. Surface crossing affects mobility. Concept ofservice line, as being done on DFC & Highways needs to befollowed.

ROB C t Sh i t b itt d f b 50 K i t d f

Recommendations (Contd) ROBs Cost Sharing to be permitted for above 50 K instead of

1 lakh TVUs applicable at present. Solution for delay in construction of ROBs. State Solution for delay in construction of ROBs. State

Government will now construct all ROBs in Maharashtra. Mobility Improvement Planning required at major Junction

P i Addi i l Li Pl f S bli & M iPoints . Additional Lines : Platforms, Stabling & Maintenance facilities

Right powering of coaching and freight trains by using loco Right powering of coaching and freight trains by using loco consists.

Centralized Loading of Parcel, Linen & Catering items in Maintenance Depot for Coaching trains to reduce Platform occupation

Vacancy position of Safety Category staff not to exceed 5% Vacancy position of Safety Category staff not to exceed 5%at any given time.

Central Railway

Measures taken for speeding up

Elimination of PSRs – Total – 677, Feasible for removal – 391, Eliminated - 23 (2017-18), Planned - 39 (2018-19) & @ 15/ year from 2019-20 onwards

Elimination of LC gates – Eliminated - 61 in 2017-18, Planned - 55 (2018-19). Ch d li Pl d t D d (2018 19)Chord line – Planned at Daund (2018-19)Flyover – Planned at Jalgaon (2018-19) Increase in Sectional Speed – Planned in 2018-19 :

Diva – PNVL – Roha from from 90/ 100 to 110 kmph AMI – NRKR from 100 to 110 kmphPune – MRJ – KOP from 100 to 110 kmphPune MRJ KOP from 100 to 110 kmphMRJ – KWV – LUR from 90/ 100 to 110 kmphMMR – DD – SUR from 105 to 110 kmph

F ll i ti ill l b l d f i i dFollowing sections will also be planned for increase in speedCSTM – KYN – KJT / KSRA from 105 to 110 kmphBSR – Diva from 90 to 110 kmph

Western Railway Elimination of LC gates – Planned 196 (2018-19). Eliminated - 250 in

2017-18