Strongform specializes in industrial structural concrete construction; rebar placement, steel buildings, & structural steel erection and civil work. Services to industries include alternative energy, agriculture, mining, cement, fertilizer, food and beverage, power, and other industrial projects. Strongform achieves excellent workmanship on aggressive schedules and maintains an excellent safety standard. From expansions to greenfield projects we can be of service to you and, as we are a nationwide contractor, our services are available to you wherever your business may take you.

Page 3: PRESENTATION 10-Reduced

ABOUT US

CORPORATE PROFILE •Strongform is a general contractor that specializes in industrial structural concrete construction; rebar placement, steel buildings and structural steel erection. •Strongform is a licensed nationwide contractor. •Strongform has extensive Bio-refining foundation, structural steel, equipment installation experience. •Strongform has vast experience in import/export terminal construction.

MAJOR INDUSTRIES SERVED •Alternative Energy

Ethanol Biodiesel Methane Digesters

•Agriculture – Feed and Process •Agriculture – Bulk Storage •Mining – Metal and Non-metal •Cement – Storage and Process •Fertilizer – Storage and Process •Food and Beverage •Power Industry

TYPES OF CONSTRUCTION •Civil •Footings •Walls

Gang Form Jump Form Hand Set

•Flatwork and Floors •Concrete Paving •Concrete Tanks and Silos •Structural Concrete Beams and Columns •Structural Steel and Equipment Installation

Page 4: PRESENTATION 10-Reduced

CAST-IN-PLACE

CIRCULAR

CONCRETE TANKS

Page 5: PRESENTATION 10-Reduced
Page 6: PRESENTATION 10-Reduced

Pouring and Finishing Tank Base Slab

Page 7: PRESENTATION 10-Reduced

Finished Tank Base Slab ready for Wall forms

Page 8: PRESENTATION 10-Reduced

Assembly of Steel Gang Forms – Assembly of Walk-way is done on the ground and lifted into place attached to a section of forms Workers will work from a safe location and platform mobile man-lifts are used as needed.

Page 9: PRESENTATION 10-Reduced

Section of Gang Form and Walk-way being hoisted into place with Crane. Note: All workers are tied-off 100% and the use of Load Tag lines is Company Policy

Page 10: PRESENTATION 10-Reduced

Competed Gang Form Wall section

Page 11: PRESENTATION 10-Reduced

Installing Wall Reinforcing bar – Note: Rebar is tied in mats on the ground with the correct splicing and then hoisted into place with crane.

Page 12: PRESENTATION 10-Reduced

Extra Reinforcing being set in the splice sections. Note: Workers are 100% tied-off at all times. Spotters and Safety personal watching at all times.

Page 13: PRESENTATION 10-Reduced

Closing Up outside wall form of wall section. Note Workers using man-lifts and spotters guiding form section into place.

Page 14: PRESENTATION 10-Reduced

Pouring Concrete in Wall section. Note: Workers work from walk-ways on the inside of the wall section.

Page 15: PRESENTATION 10-Reduced

Finished Tank Wall section

Page 16: PRESENTATION 10-Reduced

Gang Form wall section on inside of tank after finishing pouring. Note: Squares on the concrete are from the pour doors in the form panels with allows concrete to be poured into the forms per the ACI specifications.

Page 17: PRESENTATION 10-Reduced

Finished Tank Inside

Page 18: PRESENTATION 10-Reduced

Finished Tank Outside

Page 19: PRESENTATION 10-Reduced

Tank finished filled and tested ready for production

Page 20: PRESENTATION 10-Reduced
Page 21: PRESENTATION 10-Reduced
Page 22: PRESENTATION 10-Reduced
Page 23: PRESENTATION 10-Reduced
Page 24: PRESENTATION 10-Reduced
Page 25: PRESENTATION 10-Reduced
Page 26: PRESENTATION 10-Reduced
Page 27: PRESENTATION 10-Reduced

3+ Million Gallon Square Tank – WTP Crew Size – 8 Duration – 2 Months to Finish

Page 28: PRESENTATION 10-Reduced

3+ Million Gallon Square Tank – WTP Crew Size – 8 Duration – 2 Months to Finish

Page 29: PRESENTATION 10-Reduced

MBR Tank – Alabama Crew Size 5 Duration – 6 Weeks

Page 30: PRESENTATION 10-Reduced
Page 31: PRESENTATION 10-Reduced
Page 32: PRESENTATION 10-Reduced
Page 33: PRESENTATION 10-Reduced
Page 34: PRESENTATION 10-Reduced
Page 35: PRESENTATION 10-Reduced
Page 36: PRESENTATION 10-Reduced

Grain Receiving Tunnel Base - Poet

Page 37: PRESENTATION 10-Reduced

Pouring Receiving Tunnel Base - Poet

Page 38: PRESENTATION 10-Reduced

Receiving Pit – 12’ Deep

Page 39: PRESENTATION 10-Reduced

Tunnels and Silo Foundations – Mobile Alabama Export Facility. 12’x 12’ Tunnels and 12’ Stem Walls.

Page 40: PRESENTATION 10-Reduced
Page 41: PRESENTATION 10-Reduced
Page 42: PRESENTATION 10-Reduced

UWGP office floor – Note: In-slab heating

Page 43: PRESENTATION 10-Reduced
Page 44: PRESENTATION 10-Reduced

Layout lines for Saw cutting control joints

Page 45: PRESENTATION 10-Reduced

Base Slab pour and finish

Page 46: PRESENTATION 10-Reduced
Page 47: PRESENTATION 10-Reduced

Elevated Slab Pour and Finish – Hand Finish and Power Trowels used

Page 48: PRESENTATION 10-Reduced
Page 49: PRESENTATION 10-Reduced
Page 50: PRESENTATION 10-Reduced
Page 51: PRESENTATION 10-Reduced
Page 52: PRESENTATION 10-Reduced
Page 53: PRESENTATION 10-Reduced
Page 54: PRESENTATION 10-Reduced

FERTILIZER AND BULK

MATERIALS STORAGE

Page 55: PRESENTATION 10-Reduced
Page 56: PRESENTATION 10-Reduced
Page 57: PRESENTATION 10-Reduced

Complete and Cleaned up and Ready for Dome America to build wood dome

Page 58: PRESENTATION 10-Reduced

Interior walls – rebar and installed Interior walls – Complete ready for columns

Port of Mobile - Alabama

Page 59: PRESENTATION 10-Reduced

Port of Mobile – Alabama Interior wood divider walls going up and forming and pouring Interior columns going on at the same time.

Page 60: PRESENTATION 10-Reduced

Port of Alabama – Setting interior columns

Page 61: PRESENTATION 10-Reduced

Port of Mobile – Alabama Exterior Columns formed

Port of Mobile – Alabama Exterior Columns Poured and finished

Page 62: PRESENTATION 10-Reduced

Port of Mobile – Alabama Building Framework going Up

Page 63: PRESENTATION 10-Reduced
Page 64: PRESENTATION 10-Reduced
Page 65: PRESENTATION 10-Reduced
Page 66: PRESENTATION 10-Reduced
Page 67: PRESENTATION 10-Reduced
Page 68: PRESENTATION 10-Reduced
Page 69: PRESENTATION 10-Reduced
Page 70: PRESENTATION 10-Reduced

Contact:

Duane Thomes – (209) 480-0301 – Cell

P: 218.462.2607 F: 218.462.2508 208 Baker St. N. / P.O. Box 315/ Deer Creek, MN 56527

[email protected]