1/47
Kennedy Space Center
Shuttle Operations Team
New Employee Orientation Training
KLASS
7/30/2019 PRES Shuttle Operations
2/47
KSC Home to Shuttle
Space Shuttles Call Kennedy Space Center Home
http://www-pao.ksc.nasa.gov/kscpao/videos/metafiles/ksc_112304_shuttle_home.ram7/30/2019 PRES Shuttle Operations
3/47
Be familiar with other Shuttle operations:
Ferry Flight Operations
and Constraints
Guppy Operations
NASA Marine Operations
Understand Shuttle launch operations
and launch-related requests
Todays Objectives
7/30/2019 PRES Shuttle Operations
4/47
KSC Operations
Guppy Flights
Pad OperationsSegment Moves
Rollover (OPF - VAB)
Rollout/back (VAB - Pad)
Ships
SRB Recovery
ET Barge Operations
Payload Lift
RSS Retract
Tanking
Crew Ingress
Launch--User Constraints
Landing
RTLS
End of Mission
Ferry Flight
Post Landing Operations
Mate / Demate
Roll
7/30/2019 PRES Shuttle Operations
5/47
Guppy Flights
7/30/2019 PRES Shuttle Operations
6/47
Solid Rocket Booster Segment Arrival
7/30/2019 PRES Shuttle Operations
7/47
SRB Segment Move Constraints:
(1-hour forecast) LTG within 5NM
Forecast LTG within 5 NM > 25%
Wind > 34 Kts steady-state, peak 52 Kts
Solid Rocket Booster Segment Move
7/30/2019 PRES Shuttle Operations
8/47
ET Barge Operations Concerns:
Seas > 8 ft - Possible damage to ET barge
Wind forecast > 15 Kts for barge transfer from
Port Canaveral to KSC via Banana River
External Tank Barge Ops
7/30/2019 PRES Shuttle Operations
9/47
ET Barge Ops
7/30/2019 PRES Shuttle Operations
10/47
Stack ET in VAB
7/30/2019 PRES Shuttle Operations
11/47
Transport Constraints:
Pad Wind > 34 Kts sustained
LTG within 5NM
Payload Transport and Lifting Ops
7/30/2019 PRES Shuttle Operations
12/47
Lift Constraints:
Pad Wind > 17 Kts steady-state, Peak 26 kts @ 60
level
LTG within 5NM
Payload Lift Ops
7/30/2019 PRES Shuttle Operations
13/47
Rollover Constraints:
(2 - hour forecast)
LTG within 5NM
Temp < 36F
Any Precip
On transporter: Wind > 30 Kts Peak On landing gear: Wind > 42 P 64 Kts
Rollover
R ll /R llb k
7/30/2019 PRES Shuttle Operations
14/47
Rollout/back Constraints:
(12 - hour forecast) LTG within 20 NM
Forecast LTG within 20NM > 10%
Wind 40 P 60Kts
Rollout /Rollback
R ll t / R llb k
7/30/2019 PRES Shuttle Operations
15/47
Rollout / Rollback
P d O ti
7/30/2019 PRES Shuttle Operations
16/47
Pad Ops Constraints:Generally
(Shuttle not necessarily on pad)
LTG within 5NM
Wind>17Kts (many thresholds)
Heavy Precipitation
Hail--any Cold Temperatures
Severe Weather
Weather Constraints covered by
45 WS wx warnings/advisories
Pad Operations
H i
7/30/2019 PRES Shuttle Operations
17/47
Hurricanes
Rollback!
7/30/2019 PRES Shuttle Operations
18/47
Rollback!
Pre Launch Ops
7/30/2019 PRES Shuttle Operations
19/47
Pre-Launch Ops
Crew Ingress TCDT
7/30/2019 PRES Shuttle Operations
20/47
Terminal Countdown Demonstration Test
Crew Ingress TCDT
Barge Move
7/30/2019 PRES Shuttle Operations
21/47
Barge Move
SRB Recovery Ships
7/30/2019 PRES Shuttle Operations
22/47
Depart ~24 Hours Before Launch
SRB Recovery Ships
Rotating Service Structure Retract
7/30/2019 PRES Shuttle Operations
23/47
RSS Retract Constraints (1 hr forecast):
Pad wind > 40 kts steady-state @ 60' level
LTG within 5NM
Forecast LTG within 5NM > 20%
Heavy Rain (worker safety issue)
Potential Severe Wx or any hail
Orbiter exposed--Orbiter, tiles, or ET could be
damaged
Rotating Service Structure Retract
Tanking
7/30/2019 PRES Shuttle Operations
24/47
Tanking Constraints:Pad Wind > 42 Kts @ 60 level
LTG within 5NM
24 hr average temp < 41F
Tanking
Patrick AFB Forecaster
7/30/2019 PRES Shuttle Operations
25/47
Provides weather support to rescue aircrews supporting Shuttle launch
Patrick AFB Forecaster
Crew Ingress
7/30/2019 PRES Shuttle Operations
26/47
Launch
Crew Ingress Constraints
No Ltg within 5NM
g
NASA T-38
7/30/2019 PRES Shuttle Operations
27/47
Monitors Padand SLF
~L - 3:00
Shuttle Training Aircraft
7/30/2019 PRES Shuttle Operations
28/47
~L - 1:40
g
Ice Team
7/30/2019 PRES Shuttle Operations
29/47
Ice on ET
L-3, 2, 1 Day Forecasts (LWO)
Ice Team performs inspection of ET after
tanking
Shuttle Ceiling Constraints
7/30/2019 PRES Shuttle Operations
30/47
5,000 ft
4,000 ft
6,000 ft
8,000 ft
7,000 ft
RTLS (SLF)
< 500 ft
Thick
> 500 ft
Thick
Launch (PAD)GO
Conditional
NO GO
Shuttle Precipitation Rule
7/30/2019 PRES Shuttle Operations
31/47
DO NOT launch if precipitation
(visible rain, virga, or minimum
discernible weather radar echo)exists in the flight path.
OK
Shuttle Temperature Rules
7/30/2019 PRES Shuttle Operations
32/47
VALUES IN TABLE ARE RELATIVE HUMIDITY IN %
Key:
Green - i.e., no violation
Conditional - i.e., Green or Red depending upon relative humidity
Red - i.e., violation of minimum air temp criteria
48 47 46 45 44 43 42 41 40 39 38 37 36
0 to 1 2 3 4
5-7 8-14
Ambient Air Temp, Deg F
Sustained
Wind Speed
(Kts)
Shuttle Pad Wind Constraints
7/30/2019 PRES Shuttle Operations
33/47
DO NOT launch if peak winds exceed wind criteria listed in
NSTS 16007
Criteria determined by SSMEs:
- One or More Block II SSMEs
vs.
Three Non-Block II SSMEs
- Pad Peak Wind Speed range: 24 - 34 knots,
depending upon wind direction
Launch!
7/30/2019 PRES Shuttle Operations
34/47
SRB Recovery Ops
7/30/2019 PRES Shuttle Operations
35/47
SRB Recovery Concerns
Seas > 10 ft
(@ 10 ft seas recovery forces crew into
survival mode)
Steady-state wind forecast > 26 Kts(higher probability of booster damage upon
impact)
SRB Recovery
SRB Recovery Ops
http://localhost/var/www/apps/conversion/tmp/scratch_10//p423fp2/45ws/TRAINING/(4)http://localhost/var/www/apps/conversion/tmp/scratch_10//p423fp2/45ws/TRAINING/(4)7/30/2019 PRES Shuttle Operations
36/47
External Tank
7/30/2019 PRES Shuttle Operations
37/47
Not recovered
On-Orbit
7/30/2019 PRES Shuttle Operations
38/47
SMG provides daily forecasts for KSC, EDW, NOR
Landing
7/30/2019 PRES Shuttle Operations
39/47
SMG=Spaceflight Meteorology Group
FD = Flight Director
TD = Touch down
hrs = hours
LWO = Launch Weather Officer
SMG provides continuous Wx
updates until landing
45 WS LWO supports SMG and
provides LD updates for post-landing preparation
Post Flight Ops
7/30/2019 PRES Shuttle Operations
40/47
Post-Flight Processing Constraints:
(1 hour desired lead time)
Lightning within 5NM
Surface winds > 40 P 60 Kts
Hail, Any Size
Any precip
Ferry Flight Ops
7/30/2019 PRES Shuttle Operations
41/47
This Could Be You!!
7/30/2019 PRES Shuttle Operations
42/47
Mate / Demate Ops
7/30/2019 PRES Shuttle Operations
43/47
Pathfinder
7/30/2019 PRES Shuttle Operations
44/47
Here we go again!
7/30/2019 PRES Shuttle Operations
45/47
Rolling shuttle in after landing while rolling out the next mission!
Terminology/Acronyms
7/30/2019 PRES Shuttle Operations
46/47
Flight Director
Touch Down
Hours
Launch Weather Officer
Space Flight Meteorology Group at
Johnson Space Center in Houston, Tex
Edwards
Air Force Base
Space Station Processing Facility
Rotation Processing & Surge Facility
FD -
TD -
HRS -
LWO -
SMG -
EDW-
AFB-
SSPF -
RPSF -
Terminology Acronyms
7/30/2019 PRES Shuttle Operations
47/47
Space Meteorology GroupAuxiliary Power Unit
Nautical Miles
LightingWeather
National Hurricane Center
Orbiter Weather Protection
SMG -APU -
NM -
LTG-
WX-
NHC -
OWP -