Jing Wu* and Arthur B. Weglein MOSRP, University of Houston October 19, 2015 PREPROCESSING IN DISPLACEMENT SPACE IN PREPARATION FOR ONSHORE SEISMIC PROCESSING: REMOVING GROUND ROLL AND GHOSTS WITHOUT DAMAGING THE REFLECTION DATA

PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

 Jing  Wu*  and  Arthur  B.  Weglein  M-­‐OSRP,  University  of  Houston  

October  19,  2015  

PREPROCESSING  IN  DISPLACEMENT  SPACE  IN  PREPARATION  FOR  ONSHORE  SEISMIC  PROCESSING:  REMOVING  GROUND  ROLL  AND  GHOSTS  WITHOUT  

DAMAGING  THE  REFLECTION  DATA  

Page 2: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

MOTIVATION  

• Preprocessing    ü is  required  for  all  land  seismic  data  processing  

2  

Page 3: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

Boustani  et  al.,  13  

3  

Page 4: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

Boustani  et  al.,  13  

4  

Ground  roll    (Rayleigh  wave)  

Page 5: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

Boustani  et  al.,  13  

5  

Ground  roll    (Rayleigh  wave)  

Direct  wave  

Page 6: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

Boustani  et  al.,  13  

6  

Ground  roll    (Rayleigh  wave)  

Direct  wave  

Ghosts    exist  in  reflec^on  

Page 7: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

Boustani  et  al.,  13  

Ground  roll    (Rayleigh  wave)  

7  

Ghosts    exist  in  reflec^on  

Preprocessing  to  separate  these  events  from  upgoing  reflec^on  

Direct  wave  

Page 8: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

MOTIVATION  

• Preprocessing    ü is  required  for  all  land  seismic  data  processing  

ü provides  necessary  prerequisite  for  Inverse  Sca`ering  Series  (ISS)  mul^ple  removal,  which  is  the  most  capable  method  available  today  and  does  not  need  any  subsurface  informa^on  

8  

Page 9: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

IMPACT  OF  DEGHOSTING  ON  ISS  MULTIPLE  REMOVAL  

9  (  Jinlong  Yang,  14;  P.  Carvalho  and  A.  Weglein,  92;  Jingfeng  Zhang,  05,  06,  07  )  

Page 10: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

IMPACT  OF  DEGHOSTING  ON  ISS  MULTIPLE  REMOVAL  

10  

0.5

1.0

1.5

2.0

Tim

e(s)

500 1000 1500Trace Number

Input  data  with  ghosts  

Primary  +  Ghost  

Mul^ple  +  Ghost  

0.5

1.0

1.5

2.0

Tim

e(s)

500 1000 1500Trace Number

Mul^ple  removal  result  

Primary  +  Ghost  

Residual    

(  Jinlong  Yang,  14;  P.  Carvalho  and  A.  Weglein,  92;  Jingfeng  Zhang,  05,  06,  07  )  

Page 11: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

IMPACT  OF  DEGHOSTING  ON  ISS  MULTIPLE  REMOVAL  

11  

0.5

1.0

1.5

2.0

Tim

e(s)

500 1000 1500Trace Number

Input  data  without  ghosts  

Primary  +  Ghost  

Mul^ple  +  Ghost  

0.5

1.0

1.5

2.0

Tim

e(s)

500 1000 1500Trace Number

Mul^ple  removal  result  

Primary  +  Ghost  

(  Jinlong  Yang,  14;  P.  Carvalho  and  A.  Weglein,  92;  Jingfeng  Zhang,  05,  06,  07  )  

Page 12: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

DELIVERABLE  OF  THIS  TALK  

•  For  onshore  seismic  processing,  with  the  energy  source  above  the  

measurement  surface,  elas^c  Green’s  theorem  can  arrange  to  

remove  all  direct  waves,  the  receiver  ghosts    and  the  ground  roll  at  

once.  

12  

Page 13: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

OUTLINE  

Ø  THEORY  

Ø  NUMERICAL  TESTS  

Ø  DISCUSSION  AND  SUMMARY  

13  

Page 14: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

THEORY  

14  

Page 15: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

GREEN’S  THEOREM  WAVE  SEPARATION  

Reference  medium  

S1

S2

P1

P2

P = P1 + P2

15  

Page 16: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

GREEN’S  THEOREM  WAVE  SEPARATION  

Reference  medium  

S1

S2

P1

P1 = (P∇ 'G0 −G0∇ 'P) ⋅ n̂ dS '∫

P = P1 + P2

S’ 16  

(  A.  Weglein  and  B.  Secrest,  90;  A.  Weglein,  02;  J.  Zhang,  05,  06,  07;  J.  Mayhan,  12,  13;  L.  Tang,  13  )  

Page 17: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  2D  EXPERIMENT  

F.  S.  

 Air    

 Earth  

(ux ,uz )(Fx ,Fz )Source   Receiver  

17  

Page 18: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  2D  EXPERIMENT  

M.  S.  F.  S.  

 Air    

 Earth  

(ux ,uz )

18  

(Fx ,Fz )

Page 19: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  REFERENCE  MEDIUM  

M.  S.  F.  S.  

 Elas/c  

19  

Page 20: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  REFERENCE  MEDIUM  +  3  SOURCES  +  RECEIVERS  

M.  S.  F.  S.  

 Air    

 Earth  

S1  

S3  

S2  

20  

(Fx ,Fz )

Page 21: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  REFERENCE  MEDIUM  

M.  S.  F.  S.  

 Elas/c  

21  

Page 22: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

M.  S.  F.  S.  

 Air    S2  S1  (Fx ,Fz )

ONSHORE:  REFERENCE  MEDIUM  +  SOURCES  

22  

ü S1  +  S2  generate  direct  wave  

 Elas/c  

Page 23: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

M.  S.  F.  S.  

 Air    S2  S1  (Fx ,Fz )

ONSHORE:  REFERENCE  MEDIUM  +  SOURCES  

23  

ü S1  +  S2  generate  ground  roll    

 Elas/c  

Page 24: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  REFERENCE  MEDIUM  +  SOURCES  

24  

M.  S.  F.  S.  

 Air    S2  

ü S1  +  S2  generate  ghosts  

S1  (Fx ,Fz )

 Elas/c  

Page 25: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  REFERENCE  MEDIUM  +  SOURCES  

25  

M.  S.  F.  S.  

ü S3  generates  up  reflec/ons  

 Elas/c    Earth  

S3  

Page 26: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  REFERENCE  MEDIUM  +  3  SOURCES  +  RECEIVERS  

M.  S.  F.  S.  

 Air    

 Earth  

S1  

S3  

S2  

26  

(Fx ,Fz )

Page 27: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  OBTAIN  UP  WAVE  WHEN          IS  ABOVE  M.S.     !r

M.  S.  F.  S.  

 Air    

 Earth  

S1  

S3  

S2  !r

27  

(Fx ,Fz )

Page 28: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  UP  WAVE  PREDICTION  

!uup (!r , !rs ,ω ) = −!t (!r ', !rs ,ω ) ⋅G0 (

!r ', !r ,ω ) − !u(!r ', !rs ,ω ) ⋅ n̂ '⋅ Σ0 (!r ', !r ,ω )( )( ) ⋅dS

m.s.∫

( Weglein and Secrest, 1990 )

!t = ( tx tz ) Traction along the m.s.

!u = ( ux uz ) Total wave

2D:  

28   !uup = ( ux

up uzup )

Stress tensor of Green’s function

G0 Green’s tensor in reference medium

Σ0

Up wave

Page 29: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  UP  WAVE  PREDICTION  

!uup (!r , !rs ,ω ) = −!t (!r ', !rs ,ω ) ⋅G0 (

!r ', !r ,ω ) − !u(!r ', !rs ,ω ) ⋅ n̂ '⋅ Σ0 (!r ', !r ,ω )( )( ) ⋅dS

m.s.∫

( Weglein and Secrest, 1990 )

!t = ( tx tz ) Traction along the m.s.

!u = ( ux uz )

2D:  

29   !uup = ( ux

up uzup )

ü Direc^onal  deriva^ve  of  displacement  is  required  to  compute  trac^on  

ü Triangle  rela^onship  among  wavelet,  displacement  and  trac^on  can  be  used  to  determine  trac^on  (  A.  Weglein  &  L.  Amundsen,  2002  )  

Total wave

Up wave

Page 30: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE:  UP  WAVE  PREDICTION  

!uup (!r , !rs ,ω ) = −!t (!r ', !rs ,ω ) ⋅G0 (

!r ', !r ,ω ) − !u(!r ', !rs ,ω ) ⋅ n̂ '⋅ Σ0 (!r ', !r ,ω )( )( ) ⋅dS

m.s.∫

( Weglein and Secrest, 1990 )

!t = ( tx tz ) Traction along the m.s.

!u = ( ux uz )

2D:  

30   !uup = ( ux

up uzup )

Stress tensor of Green’s function

G0 Green’s tensor in reference medium

Σ0

Total wave

Up wave

Page 31: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

NUMERICAL  TESTS  ü  Onshore  shot  record  with  buried  receivers  ü  Onshore  shot  record  with  on-­‐surface  receivers    

31  

Page 32: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE  MODEL  WITH  BURIED  RECEIVERS  

Layer   P  Velocity  (m/s)   S  Velocity  (m/s)   Density  (kg/m3)  

1   1800   1200   1500  2   4000   2500   1800  

    F.  S.  0m    

 400m      Earth  

M.S.  100  m  !r(ux ,uz )

32  

(0,Fz )

Page 33: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

               TOTAL  WAVE  INPUT  TO  SEPARATION  ALGORITHM  

33  

ux

0

1Time/s

-2000 0 2000Offset/m

-5

0

5

x10 -12

Depth  of  receivers  at  100  m  

Page 34: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

               TOTAL  WAVE  INPUT  TO  SEPARATION  ALGORITHM  

34  

ux

0

1Time/s

-2000 0 2000Offset/m

-5

0

5

x10 -12

Direct   Direct  

Depth  of  receivers  at  100  m  

Page 35: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

               TOTAL  WAVE  INPUT  TO  SEPARATION  ALGORITHM  

35  

ux

0

1Time/s

-2000 0 2000Offset/m

-5

0

5

x10 -12

Rayleigh   Rayleigh  

Depth  of  receivers  at  100  m  

Page 36: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

               TOTAL  WAVE  INPUT  TO  SEPARATION  ALGORITHM  

36  

ux

0

1Time/s

-2000 0 2000Offset/m

-5

0

5

x10 -12

Up   Up  

Depth  of  receivers  at  100  m  

Page 37: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

               TOTAL  WAVE  INPUT  TO  SEPARATION  ALGORITHM  

37  

ux

0

1Time/s

-2000 0 2000Offset/m

-5

0

5

x10 -12

Ghosts   Ghosts  

Depth  of  receivers  at  100  m  

Page 38: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

               TOTAL  WAVE  INPUT  TO  SEPARATION  ALGORITHM  

38  

ux

0

1Time/s

-2000 0 2000Offset/m

-5

0

5

x10 -12

Direct  Rayleigh  

Up  

Depth  of  receivers  at  100  m  

Ghosts  

Page 39: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

SEPARATED  X  COMPONENT  OF  UP  WAVE  

39  

0

1Time/s

-2000 0 2000Offset/m

-5

0

5

x10 -12

Depth  of  receivers  at  100  m  

Up  

Page 40: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ANALYTIC  X  COMPONENT  OF  UP  WAVE  

40  

0

1Time/s

-2000 0 2000Offset/m

-5

0

5

x10 -12

Up  

Depth  of  receivers  at  100  m  

Page 41: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

0 10 20 30 40 50Frequency/Hz

-20

-10

0Am

plitude/DB

SPECTRUM  COMPARISON  

41  

Total  wave  Separated  up  wave  Analy^c  up  wave  

Page 42: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ONSHORE  MODEL  WITH  ON-­‐SURFACE  RECEIVERS  

    F.  S.  0m    M.S.  0  m  !r

 400m      Earth  

(ux ,uz )

42  

Layer   P  Velocity  (m/s)   S  Velocity  (m/s)   Density  (kg/m3)  

1   1800   1200   1500  2   4000   2500   1800  

(0,Fz )

Page 43: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

               TOTAL  WAVE  INPUT  TO  SEPARATION  ALGORITHM  

43  

ux

Depth  of  receivers  at  0  m  

0

1

2

Time/s

-2000 0 2000Offset/m

-1

0

1

x10 -11

Rayleigh  

Up  +  Ghosts  

Page 44: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

 SEPARATED  X  COMPONENT  OF  UP  WAVE  

44  Depth  of  receivers  at  0  m  

0

1

2

Time/s

-2000 0 2000Offset/m

-1

0

1

x10 -11

Up  

Page 45: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

ANALYTIC  X  COMPONENT  OF  UP  WAVE  

45  

0

1

2

Time/s

-2000 0 2000Offset/m

-1

0

1

x10 -11

Depth  of  receivers  at  0  m  

Up  

Page 46: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

DISCUSSION  AND  SUMMARY  

46  

Page 47: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

FOR  DIFFERENT  ONSHORE  WAVE  SEPARATION  OBJECTIVES  

ü If  obtaining  the  upgoing  reflec^on  is  the  only  interest,            elas^c  Green’s  theorem  can  remove  both  ground  roll  and  ghosts  at  once;  

ü If  separated  ground  roll  /  ghosts  are  useful  for  other  applica^ons,  elas^c  Green’s  theorem  can  provide  them  separately.  •  A  companion  talk  in  SPNA-­‐EP:  Coherent  Noise  Removal,  room229,          Wednesday,  10/21/2015  10:00  AM    

47  

Page 48: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

SUMMARY  

Ø  Elas^c  Green’s  theorem  in  the  displacement  space  can  

ü  remove  ground  roll,  without  damaging  reflec^on  data;  

ü  remove  ghosts  from  reflec^on  data;  

ü  provide  effec^ve  prepara^on  for  all  onshore  seismic  processing;  

ü  provide  a  necessary  prerequisite  for  onshore  ISS  mul^ple  elimina^on.  

48  

Page 49: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500

49  

Page 50: PREPROCESSING!IN!DISPLACEMENT,SPACE,IN! …mosrp.uh.edu/content/07-news/m-osrp-schedule-and...IMPACT!OF!DEGHOSTING!ON!ISS!MULTIPLE!REMOVAL! 10 0.5 1.0 1.5 2.0 Time(s) 500 1000 1500