20
1 Preparing a decommissioning project (part II) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3

Preparing a decommissioning project (part II)

  • Upload
    eamon

  • View
    42

  • Download
    0

Embed Size (px)

DESCRIPTION

Preparing a decommissioning project (part II). H. Sterner E. Thurow Energiewerke Nord GmbH. H. Sterner; E. Thurow, EWN, chapter 3. Measurements performed, exempted from Atomic Law. Measurements going on, exemption planned in 2004. Site reuse Exemption from Atomic Law of site areas. - PowerPoint PPT Presentation

Citation preview

  • Preparing a decommissioning project(part II)H. SternerE. ThurowEnergiewerke Nord GmbHH. Sterner; E. Thurow, EWN, chapter 3

  • Site reuse Exemption from Atomic Law of site areasFree release measurement of site area

  • Site reuseConstruction of harbour

  • Technical concept Basic issuesmain decommissioning and dismantling stepsdismantling principlesoperational waste managementcategorisation of systems/buildings/areas by radiological classesinventorymass flow logistic (from dismantling)necessary plant adaptationmain items of investments (new equipment)special dismantling and disposal concept for highly activated componentssafe post operation, evaluation of the residual life time of old equipmentpossibilities to reduce operational costs

  • Technical conceptEWN table of contentIntroductionSite and buildings descriptionPresent statusDecommissioning and dismantling activitiesDecontamination methodsEmissionsMaterial flow and waste managementRadiological protectionDeclassificationNecessary new installations and systemsFire protectionWorkers protectionPlant securityInfrastructureSafety caseEnvironmental impact assessment

  • Technical concept EWN - dismantling principlesas large components / parts as possible for treatment in our warm workshop or interim storagedismantling planning on system basis, execution on room basisstart in unit 5; low contamination / dose ratefrom low to high contamination / dose rateuse market equipmentin situ decontamination only for dose reduction

  • Technical conceptEWN - main direction of dismantling

  • Technical concept Plant inventory Systems and other components on a room-by-room basis

    Masses and material types (on a room- and system-basis)

    Contamination in rooms and systems (including evaluation of contamination penetration in concrete structures)

    Dose rates, including ambient rates in rooms, hot spots, and at large components

    Hazardous materials (Asbestos, PCB etc.)

  • Technical concept Categorisation by radiological classes Category I- unrestricted material

    Category II- suspected material (an eventual contamination cannot be excluded) Category III- contaminated material

  • Technical concept Categorisation by radiological classes

    EWN - example

    Estimated mass ratio for contamination categoriesin the turbine hall units 1 4

    Category Iunrestricted material ca. 45 %Category IIsuspected materialca. 53 %Category IIIcontaminated materialca. 2 %

  • Technical concept Classification of systemsISystems necessary for nuclear safety and/or radiation protectionIISystems necessary for industrial safety and/or operationIIINot necessary systems

  • Technical concept WWER 440 - classification of systems (example)

    SystemUnitSystem CategoryRemarksPost OperationPreparation SafeEnclosureSafe Enclosureventilation for reactor- and auxiliary building1, 2, 3, 4IIICapacity reduction,Adaptation and/orInstallation of newVentilation systemswater cleaning system 2 (SVO-2)1/23/4IIIIIIIIIIIIIIIIIIwater cleaning system 3 (SVO-3) including sewage water system1/23/4IIIIIIIIIIIIIIwater cleaning system 4 (SVO-4)1/23/4IIIIIIIIIIIIIIIIsteam generator facility1, 2, 3, 4IIIIIIIIIsteam generator blowdown system1, 2, 3, 4IIIIIIIIIwater cleaning system 5 (SVO-5)1, 2, 3, 4IIIIIIIIIwater cleaning system 6 (SVO-6)1 - 4IIIIIIIIIsolid radioactive waste store1 - 4IIIIIremoval solid wasteliquid radioactive waste store1 - 4IIIIIoff-gas cleaning system1/23/4IIIIIIIIIIIIIIIIII

  • Technical conceptWaste and material management Fuel

    Operational waste

    Dismantled material

  • Technical conceptEWN - fuel management

  • Technical conceptEWN - fuel management (state September 2004)

  • Technical conceptEWN operational waste management

    disposal as

    conventional waste

    drum drying

    facility

    Treatment

    drum drying

    facility

    rotational thin

    film evaporator

    planet

    drum drying

    facility

    equipment for

    drying of resins

    disposal as radioactive waste

    Interim

    Storage Nord

    (ISN)

    Interim

    Storage Nord

    (ISN)

    Interim

    Storage Nord

    (ISN)

    Interim

    Storage Nord

    (ISN)

    Interim

    Storage Nord

    (ISN)

    free classing

    facility

    equipment for

    drying of resins

    sorting and

    compaction

    facility

    sludges from

    outside the

    controlled area

    sludge-resin

    mixtures

    low-activated

    resins

    solid radioactive

    mixed waste

    liguid evaporato

    concentrates

    buffer storage

  • Technical conceptEWN - material management

  • Technical conceptEWN - material managementRelease measurement

  • Technical conceptProject structuringDifferent structures depending on point of view Work breakdown

    Responsibility

    Objects

    Type of work

    Phases

  • Technical conceptEWN - Work breakdown