Prepared for: Mr. Michael Bolch Shaw Group THE SHAW GROUP, INC. “PANTHER FINANCIAL”

Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Embed Size (px)

Citation preview

Page 1: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Prepared for:Mr. Michael Bolch

Shaw Group

THE SHAW GROUP, INC.“PANTHER FINANCIAL”

Page 2: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Project Scope and Client GoalsFlorida Institute of Technology

Design and construction of a 12,600 s.f. commercial office building to be used as a financial institute

SW corner of Babcock St. and Palm Bay Blvd. in Palm Bay, Fl

Create a construction schedule using MS Project

Generate an estimated probable costDevelop construction contracts and terms

Page 3: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Project Management PlanDivided into 3 parts

Project Controls Project Scope Project Schedule

Structural Design Layout Structural analysis / Member design Connections Hurricane damage mitigation

Legal Aspects Contract development & terms Preparation for negotiations Regulatory Agencies

Page 4: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Project Size and CostSteel structure

2 stories12,600 s.f.

Parking lotTransportation

Level of service analysisWater and sewer system designGeotechnical

Foundation design

Total Estimated Cost: $1,895,000.00 ($150.00/s.f.)

Page 5: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Project Design Schedule

Page 6: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Structural Design

Key Elements Layout Structural analysis / Member design Connections Hurricane damage mitigation

Page 7: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Anticipated Final Design

PANTHER FINANCIAL

Page 8: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Second Floor Layout

Page 9: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Roof Layout

Page 10: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Structural Analysis / Member DesignTwo Dimensional Dr. Frame Analysis

Determining Maximum Shear, Moment, and Axial Loads being less than the Design Load

Page 11: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Structural Elevation Drawing(Transverse View)

Page 12: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Structural Elevation Drawing(Longitudinal View)

Page 13: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Final Member Selection

Second Floor Designed Member Sizes Beam A2 - A3 W16 x 45Beam B1 - B2 W18 x 65Beam B2 - B3 W18 x 65Beam C1 - C2 W18 x 65Beam D1 - D2 W18 x 65Beam D2 - D3 W18 x 65Beam E2 - E3 W16 x 45Beam B4 - D4 W12 x 53Girder A1 - B1 W16 x 77Girder A2 - B2 W16 x 77Girder A3 - B3 W16 x 77Girder B2 - D2 W12 x 53Girder D1 - E1 W16 x 77Girder D2 - E2 W16 x 77Girder D3 - E3 W16 x 77Girder B3 - B4 W14 x 38Girder D3 - D4 W14 x 38

Frames (Roof) Designed Member Sizes Beam B1 - D1 W12 x 35Beam B3 - D3 W12 x 35Girder A1 - A2 W14 x 38Girder E1 - E2 W14 x 38

Columns W12 x 120Frames (2nd Floor) Designed Member Sizes

Beam B1 - D1 W12 x 53Beam B3 - D3 W12 x 53Girder A1 - A2 W16 x 45Girder E1 - E2 W16 x 45Stair Column W8 x 31Stair Beam W8 x 58Columns Designed Member Sizes

A3 W8 x 31B2 W8 x 31D2 W8 x 31E3 W8 x 31B4 W8 x 31D4 W8 x 31

Roof Designed Member Sizes Beam A2 - A3 W14 x 68Beam B1 - B2 W16 x 50Beam B2 - B3 W16 x 50Beam C1 - C2 W16 x 50Beam D1 - D2 W16 x 50Beam D2 - D3 W16 x 50Beam E2 - E3 W14 x 68Girder A1 - B1 W14 x 68Girder A2 - B2 W14 x 68Girder A3 - B3 W14 x 68Girder B2 - D2 W12 x 35Girder D1 - E1 W14 x 68Girder D2 - E2 W14 x 68Girder D3 - E3 W14 x 68

Page 14: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Connections / DrawingsShear Connections are boltedMoment Connections are shop-welded and bolted

Connection Bolted Connection Welded Connection

A3 Web Shear Connection

6 - 1/2" A325 Bolts - L2 1/2 x 2 1/2 x 1/2 Angle Min Edge Distance: 0.632" Min Spacing:

1.33"---------

A3 Flange Shear Connection

6 - 1/2" A325 Bolts - L2 1/2 x 2 1/2 x 1/2 Angle Min Edge Distance: 0.632" Min Spacing:

1.33"---------

A2 Web Shear Connectin

4 - 1" A325 Bolts - L6 x 6x 3/8 Angle Min Edge Distance: 0.95"

Min Spacing: 2.667"---------

B1 Moment Connection

2 - 1/4" A36 Steel Plates - 2L6 x 3 1/2 x 3/8 Double Angle - 3/4" diameter A325 (X) Bolts

Min Edge Spacing: 1 1/4"

Web 1/8" Fillet Weld

2L6 x 3 1/2 x 3/8 Double Angle

Length: 6" Location: All Around

B3 Web Shear Connection

4 - 1 1/4" A325 Bolts - L3 1/2 x 3 x 5/16 Angle Min Edge Distance: 3/4" - Min Spacing:

3.33"---------

B3 Flange Shear Connection

4 - 1 1/4" A325 Bolts - L3 1/2 x 3 x 5/16 Angle Min Edge Distance: 3/4" Min Spacing:

3.33"---------

Page 15: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

A3 Web-Shear Connection6 – A325 ½” bolts based on Slip Critical StrengthL2½” x 2½” x 1/2 Double Angles based on Areas

Page 16: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Column Base Plate Drawings

Page 17: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Work Breakdown Structure

GENERAL WORK BREAKDOWNDURATION HOURS SALARY BUDGET

START END RESPONSIBLE ENGINEER PLANNED ACTUAL $/HR PLANNED ACTUAL DONE %

COMPLETE

PRELIMINARY DESIGN (50% SUBMITTAL)

STRUCTURAL ANALYSIS   17-Oct 24-Oct   26 26     $ - YES 100%STAIRS   17-Oct 24-Oct CRAIG 2 2 $ 85.00 $ 170.00 $ 170.00 YES 100%COLUMNS   17-Oct 24-Oct CRAIG 6 5 $ 85.00 $ 510.00 $ 425.00 YES 100%BEAM   17-Oct 24-Oct CRAIG 6 6 $ 85.00 $ 510.00 $ 510.00 YES 100%FRAMES   17-Oct 24-Oct CRAIG 6 8 $ 85.00 $ 510.00 $ 680.00 YES 100%GIRDER   17-Oct 24-Oct CRAIG 6 5 $ 85.00 $ 510.00 $ 425.00 YES 100%STRUCTURAL DESIGN   17-Oct 24-Oct   20 12     $ - YES 100%CONNECTIONS   17-Oct 24-Oct CRAIG 10 10 $ 85.00 $ 850.00 $ 850.00 YES 100%BRACING DESIGN     17-Oct 24-Oct CRAIG 10 2 $ 85.00 $ 850.00 $ 170.00 YES 100%

FINAL DESIGN (95-100%) PROPOSAL

STRUCTURAL DRAWINGS   31-Oct 5-Dec   12 15     $ - YES 100%PLANS   31-Oct 5-Dec CRAIG 4 6 $ 85.00 $ 340.00   YES 100%SECTIONS   31-Oct 5-Dec CRAIG 4 4 $ 85.00 $ 340.00 $ 340.00 YES 100%DETAILS/CONNECTIONS   31-Oct 5-Dec CRAIG 4 5 $ 85.00 $ 340.00 $ 425.00 YES 100%

Page 18: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Hurricane Damage Mitigation

Constructed on raised foundations above sea level

Built upon steel, concrete, or wooden pilings or anchored to solid rock

All concrete is reinforced with steel Specialized doors and windowsUsing shutters over doors and windows

during hurricanes

Page 19: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Legal Aspects

Contract DevelopmentPreparations for NegotiationsPermits, Licenses, Agencies

Page 20: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Contract Development-1Contract Development for Panther Financial

Description of lands/site Contractors Responsibilities

Labor Schedule Permits

Owners Responsibilities Communication Payments Insurance

Page 21: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Contract Development-2Change OrdersClaimsTests and InspectionsDispute Resolution

Good Faith NegotiationsMediationArbitrationLitigation

Liquidated Damages

Page 22: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

NegotiationsPreparation for Negotiations

Gather outside information Establish points of leverage Set a goal BATNA Shoot for a Win - Win conclusion

Page 23: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Permits, Licenses, Agencies

Follow codes and regulationsAcquire permits and licensesKeep in good standing with agencies and

the public

Page 24: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Project SummaryScopeScheduleEstimated CostStructural DesignContract DevelopmentNegotiation TacticsCodes, Permits, and Licenses

Page 25: Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial

Thank you for choosing The Shaw Group, Inc.

Project plan will meet client’s goals We will produce a quality projectWe appreciate your business

Your Project Manager Stephen M. Craig [email protected] (412) 657-6263