30
Audited Project Financial Statements The audited project financial statements are documents owned by the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. These documents are made publicly available in accordance with ADB’s Public Communications Policy 2011 and as agreed between ADB and the Ministry of Agriculture and Forestry Project Number: 44138-022 Loan Number: 3024-LAO (SF) Period covered: from October 2015 to December 2016 Lao People’s Democratic Republic: GMS East-West Economic Corridor Agriculture Infrastructure Sector Project Prepared by Ministry of Agriculture and Forestry For the Asian Development Bank Date received by ADB: 27 June 2017

Prepared by Ministry of Agriculture and Forestry For the ... · Sector Project has complied in material respects with all financial covenants of the loan ... construction, maintenance

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Audited Project Financial Statements

The audited project financial statements are documents owned by the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. These documents are made publicly available in accordance with ADB’s Public Communications Policy 2011 and as agreed between ADB and the Ministry of Agriculture and Forestry

Project Number: 44138-022 Loan Number: 3024-LAO (SF) Period covered: from October 2015 to December 2016 Lao People’s Democratic Republic: GMS East-West Economic Corridor Agriculture Infrastructure Sector Project

Prepared by Ministry of Agriculture and Forestry For the Asian Development Bank Date received by ADB: 27 June 2017