Prepared by

Brookfield Multiplex Constructions Pty Limited

Construction Management Plan

300 GEORGE STREET

Brookfield Multiplex Constructions Pty Limited Level 11, 324 Queen Street Brisbane 4000

Ph +61 7 3907 4000 www.brookfieldmultiplex.com

ABN 70 107 007 527

Page 2: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Contents

2

1.0 Introduction .................................................................................................................................................. 4

1.1 Purpose 4

1.2 Scope of this Plan 4

1.3 Proposed Works 4

1.4 Site Location 4

1.5 Precedence 5

1.6 Interface with other Project Plans and Procedures 5

1.7 Document Control 5

2.0 Construction Management .......................................................................................................................... 7

2.1 Approach 7

2.2 Approvals 7

2.3 Site Security 8

2.4 Public / Worker Safety 8

2.2.1 Hoarding 8

2.2.2 Gantry 8

3.0 Construction Methodology.......................................................................................................................... 9

3.1 Demolition and Excavation 9

3.2 Substructure Works 9

3.3 Core 9

3.4 Structure 9

3.5 Façade 10

3.6 Services and Finishes 10

3.7 External Works 10

3.8 Construction Sequence and Planning 10

3.9 Material Handling 11

3.9.1 Tower Cranes 11

3.9.2 Mobile Cranes 11

3.9.3 Hoists 11

3.9.4 Concrete Handling 11

3.9.5 Rubbish Removal 11

3.9.6 Loading Platforms 11

4.0 Environmental ............................................................................................................................................ 12

4.1 General 12

4.2 Noise and Vibration Management 12

4.3 Dust Management 12

4.4 Stormwater and Sediment Control 12

Page 3: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Contents

3

4.5 Brisbane City Council Street Trees 13

5.0 Appendices ................................................................................................................................................. 14

5.1 Appendix 1 – Site Layout 14

5.2 Appendix 2 – Proposed Traffic Routes 15

5.3 Appendix 3 – BCC Trees to be removed 16

Page 4: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Introduction

4

1.0 Introduction

1.1 Purpose

This Construction Management Plan has been documented to describe how the Project Management team shall implement and conduct its allocated site management responsibilities during the Construction phase of the “300 George Street” Project (the Project).

A fundamental aim of this Plan is to ensure all construction is properly facilitated, integrated and coordinated so as to deliver certainty to the objectives of the Project.

This plan forms part of Brookfield Multiplex Constructions Management System which is accredited to AS/NZS IS0 9001:2008 – Quality Management System, AS/NZS ISO 14001:2004 – Environmental Management System, and AS/NZS 4801:2001 – Occupational Health and Safety Management System.

1.2 Scope of this Plan

This Plan provides a holistic approach that:

advises how the project management team will comply with the requirements of the contract relating to construction;

defines the project objectives and targets of particular relevance to the construction phase;

describes constraints specific to the construction phase and the project in general;

describes the process for the identification and control of risks specific to the construction phase; and

details the proposed strategy for the construction phase, with particular regard to establishment resourcing, site organisation and construction controls.

1.3 Proposed Works

The proposed works require the construction of:

- 7 Basement Levels - 4 Podium Levels - 3 Towers

o Commercial Office o Hotel o Residential

This type of construction will have several distinct phases that will require different material handling strategies to optimise the construction works and minimise impact to surrounding streets, other stakeholders (such as Department of Transport and Main Roads (DTMR)) and neighbours.

Our material handling strategies and Construction planning will require consultation with stakeholders and authorities before implementation.

1.4 Site Location

The proposed development site (refer Figure 1) is bounded by George Street, Ann St, Adelaide St and North Quay. The site is known as “300 George”.

Page 5: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Introduction

5

Figure 1 – Site Location

The site area is approx. 7892 sq.m and is located adjacent to the Heritage Site – “North Quay, between Ann and Queen Streets, including Adelaide Street intersection.”

1.5 Precedence

Where ambiguity is detected between the procedures and requirements in this plan and the Brookfield Multiplex Constructions Management Systems, then the procedures nominated in this plan will take precedence.

1.6 Interface with other Project Plans and Procedures

The Construction Management Plan forms part of an integrated set of Project Management Plans and should be read in conjunction with these other plans.

1.7 Document Control

Amendments to this Management Plan are approved by the Project Manager and authorised for distribution to all holders of controlled copies.

Date Name of Recipient Organisation

2/10/13 John Gough Brookfield Multiplex

29/10/2013 Andrew Henebery Brookfield Multiplex

Uncontrolled hard copies of this plan may be distributed to Brookfield Multiplex Constructions personnel. These copies are not subject to automatic amendment and the receiver should verify currency of the document.

Revisions to this Management Plan will be made as required to reflect the current system requirements.

Page 6: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Introduction

6

Rev Date Description Page Reviewed By Approved By

0 2/10/13 Initial Issue All GR/CM JG

1 29/10/13 Changes to Appendix 1 drawings to Survey Backgrounds 14 CM AH

Page 7: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Construction Management

7

2.0 Construction Management

2.1 Approach

The major external constraints on the project are:

Maintaining smooth traffic and pedestrians flow with minimal disruptions to the surrounding streets;

Undertaking works with minimal impact on neighbours;

Ensuring existing Bus stops are collaboratively relocated or maintained with BCC; and

Ensuring Ann St access to motorway is unaffected.

Upon commencement, our project team’s immediate tasks will be to:

Locate a project office, site accommodation and facilities;

Undertake a survey of the site and complete a dilapidation report of surrounding properties and assets;

Confirm the locations of existing services and obtain all necessary permits and licences and approvals; and

Arrange for the installation of temporary services – power, water and sewer to service the site works and the amenities.

2.2 Approvals

A Development Approval is required for the works covering the excavation, basement and tower(s) works.

We foresee that the Development Approval will contain conditions that certain reports will need to be completed, submitted and approved before works can commence. Some of these reports needing approval will most likely be:

Construction Management Plan;

Erosion and Sediment Control; and

Earthworks Plan for excavation.

Prior to commencing temporary modification of traffic arrangements, further approvals will be required from Brisbane City Council including but not limited to:

Application / Notification to Work on Council Property

Temporary Lane / Road Closure Application

Application for Permit to Occupy Road

After Hours Application

Civil Operational Works

Landscape Operational Works

Signs and Line Marking Operational Works

It is proposed that staged Building Approvals (BA) will be obtained from a qualified Private Certifying Authority (PCA). It is proposed that the BA will be approved in the following sequence:

Demolition and Excavation works

Structural works for basements and podium

Structural works for towers

Services and Internal Fit Out

We do envisage that Staged occupation will be required.

The staging of the BA’s will allow works to commence, whilst affording time for those works requiring intense design time such as structural and finishes works. The net effect is an overall reduction in total development construction time.

Page 8: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Construction Management

8

2.3 Site Security

The site will be secured using appropriate fences and/or hoardings, with access gates manned with qualified security guards/traffic control officers. To control site entry of inducted personnel and machinery a ‘Smart Tech system will be used. The site will be secured out of hours and patrolled by qualified security guards.

All visitors to the site will be required to report to the site office, and will be appropriately inducted and registered in a visitors log book.

2.4 Public / Worker Safety

All site staff and subcontractors will be required to complete a site specific induction before commencing work on site. The induction will cover aspects relating to safety and amenity; including access, emergency evacuation procedures, location of first aid facilities, location of amenities, site hours, material handling, noise and dust policies and environmental management.

Prior to commencing works on site, all subcontractors will be required to submit a project specific Safety Management Plan. This plan will be reviewed by Brookfield Multiplex for compliance with the overall Project Safety Plan.

A Safety Committee will be established during the early stages of the project. The committee will have representatives from subcontractors and Brookfield Multiplex. It will conduct regular inspections of the project, and will be actively involved in reviewing Safety Management Plans and making recommendations with regard to health and safety issues.

All committee members will be adequately trained in the field of health and safety compliance.

2.2.1 Hoarding

The Hoarding construction will consist of a timber hoarding. Where works are required at the boundary, temporary fence panels will be used. Gates will be used on all access points onto the site.

2.2.2 Gantry

Gantries will be used strategically along the site boundaries to maintain pedestrian access and safety. All gantry installations will be subject to council approval and permits.

Page 9: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Construction Methodology

9

3.0 Construction Methodology

3.1 Demolition and Excavation

The site is currently a vacated law courts building covering the entire site. The existing building(s) will be progressively demolished until bulk earthworks can commence. The existing trees along North Quay, George St and Adelaide St will be removed during the works.

Existing services within the site will be located and either capped if redundant or modified if they are to be used as temporary services for the works.

The Wall Retention System will be designed by a registered Engineer based on current Geotechnical information. The overall Design drawings and specifications can be found as a standalone document and is not included in this CMP.

3.2 Substructure Works

From the Geotechnical report we envisage that the substructure works will be a combination of bored pier and pad footing arrangements.

The tower cranes will be erected as soon as the area it is intended to be erected on has been excavated. The tower cranes will assist with the removal of the last of the spoil where it is uneconomical to be done by other means, and load in materials for the substructure works.

Given the size of the site and to ensure program is met, the site will be broken up into zones so that concurrent activities can occur. As excavation is completed foundations will be cast, in ground services installed, the ground prepared for the structure and the slab on ground will be cast.

Following the slab on ground, the upper basement levels will be cast in zones, so that multiple work fronts will be created. Different formwork systems will be considered and taken into account in the design of the structure to ensure program can be met.

Concrete will be cast to these slabs and columns using a pump and satellite boom to minimise/ eliminate material handling injuries.

3.3 Core

The core(s) are central to the tower footprint. For the upper level slabs to be completed, the core must be cast to that level. To minimise program impact, we have created zones to each basement slab level to allow it to be cast without the core being complete to that level.

We will utilise a propriety vertical wall formwork system that is self-climbing to cast the core. The core system will be supported by a tower crane for lifting of materials, an Alimak to get men and tools to the system, and its own satellite concrete placing boom to place concrete.

The lobby slabs, header beams and stairs will follow the core walls and will be cast as soon as practical to maintain structural stability of the core walls and provide access to cast the tower slabs.

When the last vertical wall elements are cast, the jump form will be removed in a strategic sequence and manner for safety reasons and to allow the lift motor rooms to be cast as early as possible to get builders lifts operating.

3.4 Structure

The structure trades and works will be supported by tower cranes for lifting of materials, formwork hoists to lift recycled formwork, Alimaks to transport operatives and materials to the decks, satellite placing booms to place concrete, propriety perimeter edge screens to provide fall protection to operatives. See Appendix 1 a materials handling layout including major plant.

Scaffold requirements have been considered and the two most significant areas are envisaged to be:

Page 10: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Construction Methodology

10

Demolition

Street to level 4 – non-typical floor plates

Roof

3.5 Façade

The facade will be erected as soon as practical to commence waterproofing floors so that finishes and fit out can commence.

The roof embellishments will commence when the structure is complete. These works will not be able to be completed until all plant has been lifted into the plant rooms and the façade has been installed to this level to complete the water tightness of the fabric.

3.6 Services and Finishes

When slabs are cast and the formwork is stripped, the services will commence to be installed. These works will commence within the building but will not be completed till the façade to that level is complete. The façade provides edge protection for the men working near the edge and provides weatherproofing for equipment that is water sensitive. The works will be organised in several passes, with what we term “rough in of services” being the first pass which is all services that can be installed before the façade is installed to that level.

Finishes are normally commenced in earnest when the façade is installed to that floor. The services will be scheduled to be completed enough to allow finishes to commence in our programming.

Plant, equipment and materials will be lifted to the floors via several means depending on what stage the building is at. The means will be tower cranes, Alimaks or builders lift. The builders lifts will be used for “clean trades” such as services fit off, carpets, ceiling tiles and fit out, to minimise damage to the lifts.

Materials that will be hoisted via the Alimaks or Builders lifts will be unloaded in the loading dock to save congestion to the material handling areas.

3.7 External Works

When the fabric of the tower is complete, and the tower cranes have been removed, the gantries will also be removed. This will allow the external works to be commenced and completed in a timely manner.

The works will also include making good any areas that have been affected by the construction of the project.

As some of the external works will be to footpaths and roads to mesh them in with the new building, some footpath and lane closures will be required. These will be coordinated with the Authorities.

3.8 Construction Sequence and Planning

The locations and types of plant may vary depending on the results of more detailed planning as the design solidifies and the availability of plant is firmed up.

There will be 3 distinct phases requiring different material handling logic to construct the building efficiently and minimise impact on surrounding streets and neighbours. The phases are:

Phase 1. Site establishment; Demolition; Excavation and pile installation Phase 2. Structure Phase 3. Finishes and external works

Each Phase will not happen in isolation. Phase 2 and 3 will happen simultaneously once the structure is sufficiently complete to allow the finishes trades to commence on lower levels.

Page 11: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Construction Methodology

11

3.9 Material Handling

3.9.1 Tower Cranes

Refer Appendix 1 for approximate locations of Tower Cranes.

3.9.2 Mobile Cranes

Mobile cranes will be used during the bulk earthworks and retention phase but also to supplement the tower cranes during peak times.

3.9.3 Hoists

Refer Appendix 1 for approximate locations of man and materials hoists (Alimak).

3.9.4 Concrete Handling

Refer Appendix 1 for Work Zone areas.

3.9.5 Rubbish Removal

Rubbish will be removed from site by a licenced waste contractor and taken to a transfer facility for separation.

3.9.6 Loading Platforms

Loading platforms will be used to facilitate Tower Crane materials handling to tower slabs.

Page 12: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Environmental

12

4.0 Environmental

4.1 General

The objective of this section is to identify the proposed methods that will be employed to minimise the impact of noise, vibration and air quality in the vicinity of the development.

4.2 Noise and Vibration Management

The normal hours of work will typically be 6.30am to 6.30pm, Monday to Saturday excluding public holidays. Noise management will generally be in accordance with the QLD DEHP environmental noise management criteria. All plant will be regularly maintained and log books kept ensuring that there are no excess noise emissions. Where it is practical, electric machinery will be used in lieu of mechanical devices.

All subcontractors will be responsible for managing noise and vibration in accordance with their project specific Management Plans.

It is proposed to undertake some after hour’s works for specific tasks to minimise impacts to pedestrians, vehicular traffic or in the interest of safety. The works that are proposed to be undertaken outside of normal working hours include the following:

Removal of North Quay tree’s;

Hoarding and Gantry works;

Tower Crane erection and dismantling;

Final awning works; and

Footpath works.

All after hour’s works will be subject to the Communication Management Plan. Consultation with the Brisbane City Council will occur at all times prior to any works being scheduled. All businesses and surrounding residents will be given notification via email of all the proposed after hours works prior to the works commencing which will include details of the works and the time to undertake each activity.

We do not envisage vibration generated by the Works affecting adjoining properties. The excavation of the rock may cause some vibration but this will be monitored. Consultation with DTMR will be required.

4.3 Dust Management

Dust control measures will be implemented as required, and will be in accordance with QLD Workplace health and safety regulations and Environmental Protection Act.

Dust Management will be most critical during the demolition phase of the project, with the subcontractors for these trades specifically dealing with dust management within their project specific management plans.

Measures that may be employed include:

Site Perimeter – A 1.8m sheeted hoarding will be provided in all areas where external works are occurring

Demolition – All trucks removing materials from site will be loaded whilst inside the site perimeter, with loads covered before exiting

Excavation – water down working surfaces as required. Minimise stock piling of material. Maintaining stabilised access roads and driveway

Construction – Maintain a high level of housekeeping to minimise likelihood of windblown dust

4.4 Stormwater and Sediment Control

A stormwater and sediment control plan will be developed and will be implemented prior to works commencing. This will ensure that stormwater from the development does not enter adjoining properties, and that all water that enters the council stormwater system does not contain silt or other contaminants.

Page 13: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Environmental

13

The following are possible solutions during each phase of construction. These options will be developed further and consolidated into the overall management plan.

Demolition / Excavation – At the commencement of these works, screens and bunding at the perimeter of the site where stormwater may run off will be installed. Bunding will also be implemented around stormwater drains. Diligent housekeeping will be implemented to minimise risk of dust/debris being washed into pits.

Construction – The building slab drainage will be progressively installed and connected to council drains. Drainage pits will be bunded or have filter cloth applied to ensure debris and silt does not enter the council’s drains.

4.5 Brisbane City Council Street Trees

The tree along George St, North Quay and Adelaide St will be required to be removed at the start of the project and replaced at the end after all construction activities have been completed. The project Landscape Architects will nominate a suitable replacement tree.

Page 14: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Appendices

14

5.0 Appendices

5.1 Appendix 1 – Site Layout

Page 15: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

TR

EE

UN

KN

OW

NH

eig

ht=

4m

Dia

=200m

mS

pre

ad

=4

m

TR

EE

UN

KN

OW

NH

eig

ht=

mD

ia=

mm

Sp

rea

d=

m

TR

EE

UN

KN

OW

NH

eig

ht=

4m

Dia

=200m

mS

pre

ad

=4

mTR

EE

UN

KN

OW

NH

eig

ht=

12

mD

ia=

600m

mS

pre

ad

=1

4m

TR

EE

UN

KN

OW

NH

eig

ht=

18

mD

ia=

900m

mS

pre

ad

=1

8m

TR

EE

UN

KN

OW

NH

eig

ht=

7m

Dia

=300m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

7m

Dia

=300m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

10

mD

ia=

700m

mS

pre

ad

=1

2m

TR

EE

UN

KN

OW

NH

eig

ht=

14

mD

ia=

1000m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=300m

mS

pre

ad

=8

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=300m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=200m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=200m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=200m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=400m

mS

pre

ad

=7

m

SL:9

.66

SIT

EB

EN

CH

MA

RK

NA

ILIN

BIT

UM

EN

NA

L_L

RL

12.1

6

SIT

EB

EN

CH

MA

RK

NA

ILIN

CO

NC

RE

TE

NA

L_L

RL

13.2

4

SIT

EB

EN

CH

MA

RK

NA

ILIN

BIT

UM

EN

NA

L_L

RL

12.8

1

TR

EE

UN

KN

OW

NH

eig

ht=

25

mD

ia=

1000m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

25

mD

ia=

800m

mS

pre

ad

=1

5m T

RE

EU

NK

NO

WN

Heig

ht=

25

mD

ia=

500m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

25

mD

ia=

600m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

18

mD

ia=

1000m

mS

pre

ad

=1

6m

TR

EE

UN

KN

OW

NH

eig

ht=

18

mD

ia=

1000m

mS

pre

ad

=1

4m

ADELA

IDE

STR

EET

SL:1

3.5

7

SL:2

.30

To

pan

dB

ack

ofK

erb

BR

MM

6503.0

00-0

01

The

title

boundaries

show

nhere

on

were

notm

ark

ed

atth

etim

eofsurv

ey

and

have

been

dete

rmin

ed

by

pla

ndim

ensi

ons

only

and

notby

field

surv

ey.

Serv

ices

show

nhere

on

have

been

loca

ted

where

poss

ible

by

field

surv

ey.

Ifnotable

tobe

solo

cate

d,serv

ices

have

been

plo

tted

from

the

record

sof

rele

vantauth

oritie

sw

here

availa

ble

and

have

been

note

dacc

ord

ingly

on

the

pla

n.W

here

such

reco

rds

do

notexis

tor

are

inadequate

anota

tion

has

been

made

here

on.

Prior

toany

dem

olit

ion,exca

vatio

nor

const

ruct

ion

on

the

site

,th

ere

leva

nt

auth

ority

should

be

conta

cted

for

possi

ble

locatio

noffu

rther

underg

round

serv

ices

and

deta

iled

loca

tions

ofall

serv

ices.

E

DAD

Brisb

an

eO

ffic

e13

Railw

ay

Te

rra

ce

Milt

on

QLD

40

64

PO

Bo

x39

16

So

uth

Brisb

an

eB

CQ

LD

4101

t(0

7)

384

210

00

f(0

7)

384

210

01

ein

fo@

land

pa

rtn

ers

.co

m.a

uw

ww

w.la

nd

part

ne

rs.c

om

.au

ISO

9001:2

008

FS

535063

650300

A3

JMD

DA

D15/1

0/2

013

RS

M

SP

102966

18/0

6/2

013

RJL

0.5

Metr

e

PS

M174924

RL

15.5

77

AH

DD

BR

ISB

AN

EC

ITY

CO

UN

CIL

LO

CA

L

00

1A

/A2

JHG

06

/06/2

013

INIT

IAL

ISS

UE

00

1B

/A7

JHG

26

/06/2

013

AD

DIT

ION

AL

SU

RV

EY

DA

TA

AD

DE

DA

ND

NE

WS

EC

TIO

NA

-A

00

1C

/B1

DA

D01

/07/2

013

LIN

EO

FP

RO

PO

SE

DB

CC

KE

RB

AN

DF

OO

TP

AT

HS

HO

WN

OV

ER

SIT

E

00

1D

/C6

JMD

4/1

0/2

01

3A

DD

ITIO

NA

LS

UR

VE

YA

DD

ED

00

1E

/C9

JMD

15

/10/2

013

AM

EN

DE

DP

RO

PO

SE

DB

OU

ND

AR

Y

SH

AY

HE

RD

EV

ELO

PM

EN

TP

TY

LT

D

DE

TA

ILS

UR

VE

YO

F

LO

T10

ON

B32361

(GE

OR

GE

ST

RE

ET

,B

RIS

BA

NE

)

201

3

TE

LS

TR

AC

AB

LE

SE

WE

RA

GE

PIP

E

FE

NC

ELIN

E

WA

TE

RP

IPE

DR

AIN

GA

SP

IPE

DR

AIN

AG

EP

IPE

U/G

ELE

CT.C

AB

LE

A/G

ELE

C.C

AB

LE

U/G

AU

TO

CA

DF

ILE

AR

CH

IVE

FIL

E

FIE

LD

FIL

E

PLA

NN

UM

BE

R

CH

EC

KE

D

AP

PR

OV

ED

DR

AW

N

DA

TE

DA

TE

DA

TE

SU

RV

EY

OR

SC

ALE

HE

IGH

TD

ATU

M

ME

RID

IAN

DA

TE

OF

SU

RV

EY

HE

IGH

TO

RIG

IN

CO

NTO

UR

INTE

RV

AL

CLIE

NT

PR

OJE

CT

NO

TE

S

CO

-OR

DS

YS

TE

M

LO

CA

LA

UTH

OR

ITY

Sym

bo

lssh

ow

na

rein

dic

ativ

eo

nly

.Th

esy

mb

ols

ize

and

orien

tatio

nd

oes

no

tn

ecess

arily

rep

rese

nt

the

rea

lsiz

eo

ro

rienta

tion

of

the

featu

re.

RE

VIS

ION

650300

C9.

650300

C9.

15/1

0/2

013

SY

MC

OD

ED

ES

CR

IPT

ION

SG

NS

IGN

S

SIO

INS

PE

CTIO

NO

PE

NIN

G

SM

SE

WE

RA

GE

MA

NH

OLE

SN

ST

RE

ET

NA

ME

SIG

N

SP

RS

PR

INK

LE

R

SP

RTR

EE

SS

VS

TO

P/S

LU

ICE

VA

LV

E

ST

NS

UR

VE

YS

TA

TIO

N

SW

ST

OR

MW

TR

.M

AN

HO

LE

TA

PTA

P

TE

TE

LE

CO

MP

IT

TM

TE

LE

CO

MM

AN

HO

LE

TO

HTR

AN

SF

OR

ME

RO

/HE

AD

TP

TE

LE

PH

ON

EP

OLE

TR

LTR

AF

FIC

LIG

HTS

TR

PTR

AF

FIC

PIT

WA

VW

ATE

RA

IRV

ALV

E

WC

UW

ATE

RE

ND

CA

P

WM

WA

TE

RM

ETE

R

WM

HW

ATE

RM

AN

HO

LE

WP

RW

ATE

RR

ED

UC

ER

WR

VW

ATE

RR

EF

LU

XV

ALV

E

WS

PW

ATE

RS

AM

PLE

PO

INT

WS

VW

ATE

RS

CO

UR

VA

LV

E

WTE

WA

TE

RTE

EJU

NC

TIO

N

WV

WA

TE

RV

ALV

E

WV

MW

ATE

RV

ALV

EM

AR

KE

R

15/1

0/2

013

SC

ALE

1:2

50

05

12.5

27.5

SH

EE

T1

OF

4

1:2

50

(A1)

Sca

ffold

Gan

try.

Pat

hway

mai

ntai

ned

unde

r G

antr

y.

Site

Lay

out

D

emol

ition

SK

-001

Rev

isio

n: 1

Aut

hor:

C

Bee

by/ C

Mat

thew

s

Site

Bou

ndar

y

Exi

stin

g T

rees

to b

e re

mov

ed

Exi

stin

g T

rees

to b

e re

mov

ed

Tem

pora

ryG

antr

yGate 1

Gate 2

Gat

e 3

Gate

5

Gate

4

Page 16: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

TR

EE

UN

KN

OW

NH

eig

ht=

4m

Dia

=200m

mS

pre

ad

=4

m

TR

EE

UN

KN

OW

NH

eig

ht=

mD

ia=

mm

Sp

rea

d=

m

TR

EE

UN

KN

OW

NH

eig

ht=

4m

Dia

=200m

mS

pre

ad

=4

mTR

EE

UN

KN

OW

NH

eig

ht=

12

mD

ia=

600m

mS

pre

ad

=1

4m

TR

EE

UN

KN

OW

NH

eig

ht=

18

mD

ia=

900m

mS

pre

ad

=1

8m

TR

EE

UN

KN

OW

NH

eig

ht=

7m

Dia

=300m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

7m

Dia

=300m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

10

mD

ia=

700m

mS

pre

ad

=1

2m

TR

EE

UN

KN

OW

NH

eig

ht=

14

mD

ia=

1000m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=300m

mS

pre

ad

=8

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=300m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=200m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=200m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=200m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=400m

mS

pre

ad

=7

m

SL:9

.66

SIT

EB

EN

CH

MA

RK

NA

ILIN

BIT

UM

EN

NA

L_L

RL

12.1

6

SIT

EB

EN

CH

MA

RK

NA

ILIN

CO

NC

RE

TE

NA

L_L

RL

13.2

4

SIT

EB

EN

CH

MA

RK

NA

ILIN

BIT

UM

EN

NA

L_L

RL

12.8

1

TR

EE

UN

KN

OW

NH

eig

ht=

25

mD

ia=

1000m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

25

mD

ia=

800m

mS

pre

ad

=1

5m T

RE

EU

NK

NO

WN

Heig

ht=

25

mD

ia=

500m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

25

mD

ia=

600m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

18

mD

ia=

1000m

mS

pre

ad

=1

6m

TR

EE

UN

KN

OW

NH

eig

ht=

18

mD

ia=

1000m

mS

pre

ad

=1

4m

ADELA

IDE

STR

EET

SL:1

3.5

7

SL:2

.30

To

pan

dB

ack

ofK

erb

BR

MM

6503.0

00-0

01

The

title

boundaries

show

nhere

on

were

notm

ark

ed

atth

etim

eofsurv

ey

and

have

been

dete

rmin

ed

by

pla

ndim

ensi

ons

only

and

notby

field

surv

ey.

Serv

ices

show

nhere

on

have

been

loca

ted

where

poss

ible

by

field

surv

ey.

Ifnotable

tobe

solo

cate

d,serv

ices

have

been

plo

tted

from

the

record

sof

rele

vantauth

oritie

sw

here

availa

ble

and

have

been

note

dacc

ord

ingly

on

the

pla

n.W

here

such

reco

rds

do

notexis

tor

are

inadequate

anota

tion

has

been

made

here

on.

Prior

toany

dem

olit

ion,exca

vatio

nor

const

ruct

ion

on

the

site

,th

ere

leva

nt

auth

ority

should

be

conta

cted

for

possi

ble

locatio

noffu

rther

underg

round

serv

ices

and

deta

iled

loca

tions

ofall

serv

ices.

E

DAD

Brisb

an

eO

ffic

e13

Railw

ay

Te

rra

ce

Milt

on

QLD

40

64

PO

Bo

x39

16

So

uth

Brisb

an

eB

CQ

LD

4101

t(0

7)

384

210

00

f(0

7)

384

210

01

ein

fo@

land

pa

rtn

ers

.co

m.a

uw

ww

w.la

nd

part

ne

rs.c

om

.au

ISO

9001:2

008

FS

535063

650300

A3

JMD

DA

D15/1

0/2

013

RS

M

SP

102966

18/0

6/2

013

RJL

0.5

Metr

e

PS

M174924

RL

15.5

77

AH

DD

BR

ISB

AN

EC

ITY

CO

UN

CIL

LO

CA

L

00

1A

/A2

JHG

06

/06/2

013

INIT

IAL

ISS

UE

00

1B

/A7

JHG

26

/06/2

013

AD

DIT

ION

AL

SU

RV

EY

DA

TA

AD

DE

DA

ND

NE

WS

EC

TIO

NA

-A

00

1C

/B1

DA

D01

/07/2

013

LIN

EO

FP

RO

PO

SE

DB

CC

KE

RB

AN

DF

OO

TP

AT

HS

HO

WN

OV

ER

SIT

E

00

1D

/C6

JMD

4/1

0/2

01

3A

DD

ITIO

NA

LS

UR

VE

YA

DD

ED

00

1E

/C9

JMD

15

/10/2

013

AM

EN

DE

DP

RO

PO

SE

DB

OU

ND

AR

Y

SH

AY

HE

RD

EV

ELO

PM

EN

TP

TY

LT

D

DE

TA

ILS

UR

VE

YO

F

LO

T10

ON

B32361

(GE

OR

GE

ST

RE

ET

,B

RIS

BA

NE

)

201

3

TE

LS

TR

AC

AB

LE

SE

WE

RA

GE

PIP

E

FE

NC

ELIN

E

WA

TE

RP

IPE

DR

AIN

GA

SP

IPE

DR

AIN

AG

EP

IPE

U/G

ELE

CT.C

AB

LE

A/G

ELE

C.C

AB

LE

U/G

AU

TO

CA

DF

ILE

AR

CH

IVE

FIL

E

FIE

LD

FIL

E

PLA

NN

UM

BE

R

CH

EC

KE

D

AP

PR

OV

ED

DR

AW

N

DA

TE

DA

TE

DA

TE

SU

RV

EY

OR

SC

ALE

HE

IGH

TD

ATU

M

ME

RID

IAN

DA

TE

OF

SU

RV

EY

HE

IGH

TO

RIG

IN

CO

NTO

UR

INTE

RV

AL

CLIE

NT

PR

OJE

CT

NO

TE

S

CO

-OR

DS

YS

TE

M

LO

CA

LA

UTH

OR

ITY

Sym

bo

lssh

ow

na

rein

dic

ativ

eo

nly

.Th

esy

mb

ols

ize

and

orien

tatio

nd

oes

no

tn

ecess

arily

rep

rese

nt

the

rea

lsiz

eo

ro

rienta

tion

of

the

featu

re.

RE

VIS

ION

650300

C9.

650300

C9.

15/1

0/2

013

SY

MC

OD

ED

ES

CR

IPT

ION

SG

NS

IGN

S

SIO

INS

PE

CTIO

NO

PE

NIN

G

SM

SE

WE

RA

GE

MA

NH

OLE

SN

ST

RE

ET

NA

ME

SIG

N

SP

RS

PR

INK

LE

R

SP

RTR

EE

SS

VS

TO

P/S

LU

ICE

VA

LV

E

ST

NS

UR

VE

YS

TA

TIO

N

SW

ST

OR

MW

TR

.M

AN

HO

LE

TA

PTA

P

TE

TE

LE

CO

MP

IT

TM

TE

LE

CO

MM

AN

HO

LE

TO

HTR

AN

SF

OR

ME

RO

/HE

AD

TP

TE

LE

PH

ON

EP

OLE

TR

LTR

AF

FIC

LIG

HTS

TR

PTR

AF

FIC

PIT

WA

VW

ATE

RA

IRV

ALV

E

WC

UW

ATE

RE

ND

CA

P

WM

WA

TE

RM

ETE

R

WM

HW

ATE

RM

AN

HO

LE

WP

RW

ATE

RR

ED

UC

ER

WR

VW

ATE

RR

EF

LU

XV

ALV

E

WS

PW

ATE

RS

AM

PLE

PO

INT

WS

VW

ATE

RS

CO

UR

VA

LV

E

WTE

WA

TE

RTE

EJU

NC

TIO

N

WV

WA

TE

RV

ALV

E

WV

MW

ATE

RV

ALV

EM

AR

KE

R

15/1

0/2

013

SC

ALE

1:2

50

05

12.5

27.5

SH

EE

T1

OF

4

1:2

50

(A1)

Con

stru

ctio

nP

latfo

rm

Gan

try.

Pat

hway

mai

ntai

ned

unde

r G

antr

y.

Hoa

rdin

g

Ear

ly U

seT

ruck

Acc

ess

and

Exi

t

Tru

ckA

cces

san

d E

xit

Site

Lay

out

Bul

k E

xcav

atio

n an

dR

eten

tion

SK

-002

Rev

isio

n: 1

Aut

hor:

C

Bee

by/ C

Mat

thew

s

Red

uced

Foo

tpat

hM

aint

aine

d

Red

uced

Foo

tpat

hM

aint

aine

d

Gate 5

Gate 4

Gate 1

Gate 2

Gat

e 3

Page 17: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

TR

EE

UN

KN

OW

NH

eig

ht=

4m

Dia

=200m

mS

pre

ad

=4

m

TR

EE

UN

KN

OW

NH

eig

ht=

mD

ia=

mm

Sp

rea

d=

m

TR

EE

UN

KN

OW

NH

eig

ht=

4m

Dia

=200m

mS

pre

ad

=4

mTR

EE

UN

KN

OW

NH

eig

ht=

12

mD

ia=

600m

mS

pre

ad

=1

4m

TR

EE

UN

KN

OW

NH

eig

ht=

18

mD

ia=

900m

mS

pre

ad

=1

8m

TR

EE

UN

KN

OW

NH

eig

ht=

7m

Dia

=300m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

7m

Dia

=300m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

10

mD

ia=

700m

mS

pre

ad

=1

2m

TR

EE

UN

KN

OW

NH

eig

ht=

14

mD

ia=

1000m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=300m

mS

pre

ad

=8

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=300m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=200m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=200m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=200m

mS

pre

ad

=7

m

TR

EE

UN

KN

OW

NH

eig

ht=

8m

Dia

=400m

mS

pre

ad

=7

m

SL:9

.66

SIT

EB

EN

CH

MA

RK

NA

ILIN

BIT

UM

EN

NA

L_L

RL

12.1

6

SIT

EB

EN

CH

MA

RK

NA

ILIN

CO

NC

RE

TE

NA

L_L

RL

13.2

4

SIT

EB

EN

CH

MA

RK

NA

ILIN

BIT

UM

EN

NA

L_L

RL

12.8

1

TR

EE

UN

KN

OW

NH

eig

ht=

25

mD

ia=

1000m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

25

mD

ia=

800m

mS

pre

ad

=1

5m T

RE

EU

NK

NO

WN

Heig

ht=

25

mD

ia=

500m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

25

mD

ia=

600m

mS

pre

ad

=1

5m

TR

EE

UN

KN

OW

NH

eig

ht=

18

mD

ia=

1000m

mS

pre

ad

=1

6m

TR

EE

UN

KN

OW

NH

eig

ht=

18

mD

ia=

1000m

mS

pre

ad

=1

4m

ADELA

IDE

STR

EET

SL:1

3.5

7

SL:2

.30

To

pan

dB

ack

ofK

erb

BR

MM

6503.0

00-0

01

The

title

boundaries

show

nhere

on

were

notm

ark

ed

atth

etim

eofsurv

ey

and

have

been

dete

rmin

ed

by

pla

ndim

ensi

ons

only

and

notby

field

surv

ey.

Serv

ices

show

nhere

on

have

been

loca

ted

where

poss

ible

by

field

surv

ey.

Ifnotable

tobe

solo

cate

d,serv

ices

have

been

plo

tted

from

the

record

sof

rele

vantauth

oritie

sw

here

availa

ble

and

have

been

note

dacc

ord

ingly

on

the

pla

n.W

here

such

reco

rds

do

notexis

tor

are

inadequate

anota

tion

has

been

made

here

on.

Prior

toany

dem

olit

ion,exca

vatio

nor

const

ruct

ion

on

the

site

,th

ere

leva

nt

auth

ority

should

be

conta

cted

for

possi

ble

locatio

noffu

rther

underg

round

serv

ices

and

deta

iled

loca

tions

ofall

serv

ices.

E

DAD

Brisb

an

eO

ffic

e13

Railw

ay

Te

rra

ce

Milt

on

QLD

40

64

PO

Bo

x39

16

So

uth

Brisb

an

eB

CQ

LD

4101

t(0

7)

384

210

00

f(0

7)

384

210

01

ein

fo@

land

pa

rtn

ers

.co

m.a

uw

ww

w.la

nd

part

ne

rs.c

om

.au

ISO

9001:2

008

FS

535063

650300

A3

JMD

DA

D15/1

0/2

013

RS

M

SP

102966

18/0

6/2

013

RJL

0.5

Metr

e

PS

M174924

RL

15.5

77

AH

DD

BR

ISB

AN

EC

ITY

CO

UN

CIL

LO

CA

L

00

1A

/A2

JHG

06

/06/2

013

INIT

IAL

ISS

UE

00

1B

/A7

JHG

26

/06/2

013

AD

DIT

ION

AL

SU

RV

EY

DA

TA

AD

DE

DA

ND

NE

WS

EC

TIO

NA

-A

00

1C

/B1

DA

D01

/07/2

013

LIN

EO

FP

RO

PO

SE

DB

CC

KE

RB

AN

DF

OO

TP

AT

HS

HO

WN

OV

ER

SIT

E

00

1D

/C6

JMD

4/1

0/2

01

3A

DD

ITIO

NA

LS

UR

VE

YA

DD

ED

00

1E

/C9

JMD

15

/10/2

013

AM

EN

DE

DP

RO

PO

SE

DB

OU

ND

AR

Y

SH

AY

HE

RD

EV

ELO

PM

EN

TP

TY

LT

D

DE

TA

ILS

UR

VE

YO

F

LO

T10

ON

B32361

(GE

OR

GE

ST

RE

ET

,B

RIS

BA

NE

)

201

3

TE

LS

TR

AC

AB

LE

SE

WE

RA

GE

PIP

E

FE

NC

ELIN

E

WA

TE

RP

IPE

DR

AIN

GA

SP

IPE

DR

AIN

AG

EP

IPE

U/G

ELE

CT.C

AB

LE

A/G

ELE

C.C

AB

LE

U/G

AU

TO

CA

DF

ILE

AR

CH

IVE

FIL

E

FIE

LD

FIL

E

PLA

NN

UM

BE

R

CH

EC

KE

D

AP

PR

OV

ED

DR

AW

N

DA

TE

DA

TE

DA

TE

SU

RV

EY

OR

SC

ALE

HE

IGH

TD

ATU

M

ME

RID

IAN

DA

TE

OF

SU

RV

EY

HE

IGH

TO

RIG

IN

CO

NTO

UR

INTE

RV

AL

CLIE

NT

PR

OJE

CT

NO

TE

S

CO

-OR

DS

YS

TE

M

LO

CA

LA

UTH

OR

ITY

Sym

bo

lssh

ow

na

rein

dic

ativ

eo

nly

.Th

esy

mb

ols

ize

and

orien

tatio

nd

oes

no

tn

ecess

arily

rep

rese

nt

the

rea

lsiz

eo

ro

rienta

tion

of

the

featu

re.

RE

VIS

ION

650300

C9.

650300

C9.

15/1

0/2

013

SY

MC

OD

ED

ES

CR

IPT

ION

SG

NS

IGN

S

SIO

INS

PE

CTIO

NO

PE

NIN

G

SM

SE

WE

RA

GE

MA

NH

OLE

SN

ST

RE

ET

NA

ME

SIG

N

SP

RS

PR

INK

LE

R

SP

RTR

EE

SS

VS

TO

P/S

LU

ICE

VA

LV

E

ST

NS

UR

VE

YS

TA

TIO

N

SW

ST

OR

MW

TR

.M

AN

HO

LE

TA

PTA

P

TE

TE

LE

CO

MP

IT

TM

TE

LE

CO

MM

AN

HO

LE

TO

HTR

AN

SF

OR

ME

RO

/HE

AD

TP

TE

LE

PH

ON

EP

OLE

TR

LTR

AF

FIC

LIG

HTS

TR

PTR

AF

FIC

PIT

WA

VW

ATE

RA

IRV

ALV

E

WC

UW

ATE

RE

ND

CA

P

WM

WA

TE

RM

ETE

R

WM

HW

ATE

RM

AN

HO

LE

WP

RW

ATE

RR

ED

UC

ER

WR

VW

ATE

RR

EF

LU

XV

ALV

E

WS

PW

ATE

RS

AM

PLE

PO

INT

WS

VW

ATE

RS

CO

UR

VA

LV

E

WTE

WA

TE

RTE

EJU

NC

TIO

N

WV

WA

TE

RV

ALV

E

WV

MW

ATE

RV

ALV

EM

AR

KE

R

15/1

0/2

013

SC

ALE

1:2

50

05

12.5

27.5

SH

EE

T1

OF

4

1:2

50

(A1)

Gan

try.

Pat

hway

mai

ntai

ned

unde

r G

antr

y.

Site

Lay

out

Con

stru

ctio

n P

hase

SK

-003

Rev

isio

n: 1

Aut

hor:

C

Bee

by/ C

Mat

thew

s

Tow

erC

rane

1T

ower

Cra

ne 3

Tow

erC

rane

2

Gate

3

Gate 2

Gate 1

Gate 4

Gate

5

Wor

k/C

onst

ruct

ion

Zon

e

Wor

k/ C

onst

ruct

ion

Zon

e.S

epar

atio

n w

ithin

Wor

kZ

one

for

each

Tow

er

Gan

try

Alim

ak

Alim

ak

Alim

ak

Tru

cks

Out

Tru

cks

Out

Page 18: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Appendices

15

5.2 Appendix 2 – Proposed Traffic Routes

Page 19: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Site

Page 20: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex

Appendices

16

5.3 Appendix 3 – BCC Trees to be removed

Page 21: Prepared by Brookfield Multiplex Constructions Pty · PDF filePrepared by Brookfield Multiplex Constructions Pty Limited Construction Management Plan 300 GEORGE STREET Brookfield Multiplex