Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
Kigali, Rwanda, 01-05 September 2014
International Telecommunication Union
ITU-R Study Groups,
Radiocommunication Bureau, ITU
Preparations for
CPM15-2, RA-15 and WRC-15
Kigali, Rwanda, 01-05 September 2014 2
Main Steps towards WRC-15
WRC-12: WRC-15 Agenda > Resolution 807 (WRC-12)
Final meetings of regional groups
2nd Session Conference Preparatory Meeting CPM15-2
Geneva, 23 March – 2 April 2015
1st Session Conference Preparatory Meeting CPM15-1 held on 20 – 21 Feb. 2012; Results in CA/201 of 19.03.12 + Add. 1 of 15.01.13
Council-12: approved WRC-15 Agenda, date & venue See Resolution 1343 (C12) (on line)
Subsequently approved by ITU Member States (CV 42/CV 47)
RA-15: 26-30 Oct. 2015 – WRC-15: 2-27 Nov. 2015 Both in Geneva
Kigali, Rwanda, 01-05 September 2014 3
~ 2.5 years of studies
Timetable towards WRC-15
Deadline for
contributions
9 Mar. 2014
Kigali, Rwanda, 01-05 September 2014 4
WP 4A
9.1.4*
1.6
9.1.6
WP 1B
WP 4C
9.1.2*
WP 5A
1.3
WP 5B 1.5
1.4
1.15
WP 7B
1.11
1.13
9.1.8
WP 7C
1.12
SC
7*
9.1.7
9.1.3* 9.1.5*
1.7
1.8
1.9.1
1.10
1.9.2
9.1.1
1.18*
1.16
1.17
WP 7A 1.14
* Relevant part
Responsible ITU-R Groups
WRC-15 agenda items & Resp. Groups
2, 4, 10
CPM15-2
UAS
FSS @ 10-17 GHz
SRS @ 400MHz
UTC
RR procedures
for Satellite filings
Issues for the BR
Dir.’s Report (9)
1.1
1.2 JTG 4-5-6-7
WRC-15 8 Art. 5 (country)
footnotes 3, 5, 6, 9
Kigali, Rwanda, 01-05 September 2014 5
9.1.4
9.1.2
9.1.3
9.1.1 MSS in the band 406-406.1 MHz
CPM15-1 Issues under Agenda item 9.1
CA Reduction & technical criteria (RR Nos. 9.41 & 9.7)
Satellite orb. & frequency spectrum to deliver International
Public Telecommunication Services in developing countries
Updating & rearrangement of the RR (excepting several Art.)
9.1.6
9.1.8
9.1.7
9.1.5
Existing & future operation of FSS ES @ 3.4-4.2 GHz, as
an aid to safe operation of aircraft and reliable distribution
of meteorological information in some Reg. 1 countries
Review def. of fixed service, fixed station & mobile station
SM guidelines for emergency & disaster relief radiocom.
Regulatory aspects for nano- and picosatellites
6
Examine contributions from the membership
Development of draft CPM texts
Carry out technical studies
Development of necessary ITU-R Recommendations and Reports
Propose method(s) of satisfying the WRC-15 Agenda Items
Prepare preliminary draft examples of regulatory texts
Ensure necessary coordination with the
concerned groups (contributing/interested working parties)
Responsible Groups activities
Kigali, Rwanda, 01-05 September 2014
deadline for draft CPM texts - 15 August 2014
7
WP 4A (7th, AIs 1.6, 1.7,1.8, 1.9.1, 7, 9.1(9.1.2, 9.1.3, 9.1.5))
WP 1B (5th, AI 9.1 (9.1.4, 9.1.6, 9.1.7))
WP 4C (7th, AI 1.9.2, 1.10, 9.1 (9.1.1))
WP 5A (6th, AIs 1.3, 1.4, 1.18*)
WP 5B (6th, AIs 1.5, 1.15, 1.16, 1.17, 1.18*)
WP 7B (5th, AIs 1.11, 1.13, 9.1.8)
WP 7C (5th, AI 1.12)
Responsible ITU-R Groups
WP 7A (5th, AI 1.14)
* Relevant part
[3 – 10 June 2015]
[17 June – 1 July 2015]
27 Oct. – 7 Nov. 2014
1 – 7 October 2014
Next Meetings of Resp. Groups
(see the ITU-R Meetings schedule at www.itu.int/en/events/Pages/Calendar-Events.aspx?sector=ITU-R)
27 Oct. – 6 Nov. 2014
WRC-15 (agenda items, including issues under AI 9.1)
SC 1 – 5 Dec. 2014 Regul. & Proc. issues
CPM15-2 23 Mar. – 2 April 2015
Kigali, Rwanda, 01-05 September 2014 8
Summary of CPM Report Preparation
WP 4A
9.1.4
1.6
9.1.6
WRC-15 (agenda items, incl. issues under AI 9.1)
CPM15-2
CPM Management
Team Meeting
WP 1B
WP 4C
9.1.2
WP 5A 1.3
WP 5B 1.5
1.4
1.15
WP 7B 1.11 1.13 9.1.8
WP 7C 1.12
JTG 4-5-6-7
SC 7
Chapter 1 (draft texts) Chapter 2
(draft texts) Chapter 3
(draft texts) Chapter 4
(draft texts) Chapter 5
(draft texts) Chapter 6
(draft texts)
CPM Report
to WRC-15
SC
Responsible ITU-R Groups
1.1 1.2
Draft
CPM Report
9.1.7
9.1.3 9.1.5 Regulatory and procedural aspects
1.7 1.8 1.9.1
1.10 1.9.2 9.1.1
1.18*
1.16 1.17 1.18*
WP 7A 1.14 * Relevant part
2 CPM15-2 4 10
Kigali, Rwanda, 01-05 September 2014 9
www.itu.int/ITU-R/go/rcpm
CPM Web Pages (1/2)
Kigali, Rwanda, 01-05 September 2014 10
CPM Management Team meeting (see Res. ITU-R 2-6) (Geneva, 1-5 September 2014)
= CPM Steering Committee (CPM+SC C&VC + Chapter Rap.) + Chairmen of Study Groups and Responsible Groups
consolidate the output from the responsible groups into the draft CPM Report to WRC-15
Special Committee on Regulatory/Procedural matters (Res. ITU-R 38-4) (Geneva, 1-5 December 2014)
prepare report(s) to the CPM15-2
2nd Session of Conference Preparatory Meeting (CPM15-2) (Geneva, 23 March - 2 April 2015) (see Res. ITU-R 2-6)
Prepare the CPM Report to WRC-15 Consider the preliminary BR Director’s Report to WRC-15
Final steps of CPM Report Preparation
Kigali, Rwanda, 01-05 September 2014 11
SC meeting
Special Committee on Regulatory/Procedural matters
(see Res. ITU-R 38-4, Web page at: www.itu.int/ITU-R/go/rsc)
Geneva, ITU HQ, 1 – 5 December 2014 (see CACE/680 at: www.itu.int/md/R00-CACE-CIR-0680)
Should prepare a Report to CPM15-2 based on:
Contributions from ITU-R membership
Results of the SC Working Party studies (see Executive Report of the SC-WP meetings in Document SC/8)
Extracts/Sections of the draft CPM Report on:
- Methods to satisfy the WRC-15 Agenda items (mainly for information purpose)
- Regulatory and procedural considerations
Kigali, Rwanda, 01-05 September 2014 12
CPM15-2
Second session of the CPM (CPM15-2) (see Res. ITU-R 2-6, Web page at: www.itu.int/ITU-R/go/rcpm)
Geneva, CICG & ITU HQ, 23 March – 2 April 2015 (see CA/216 at: www.itu.int/md/R00-CA-CIR-0216)
prepare the consolidated CPM Report to WRC-15,
using:
the draft CPM Report (available 2 months before)
the Report of the Special Committee
Contributions from ITU-R membership (deadline for submission on 9 March 2015)
Consider the preliminary draft of BR Director’s
Report to WRC-15
Meeting structure would be based on the
structure of the draft CPM Report
Kigali, Rwanda, 01-05 September 2014 13
Information for the preparation of
contributions to the SC & CPM15-2 Final deadlines for reception of contributions by the BR:
For the SC: 24 November 2014, 1600 hours UTC (one week before the meeting)
For CPM15-2: 9 March 2015, 1600 hours UTC (two weeks before the meeting)
Reference documents: (pending availability of the Draft CPM Report after the CPM-15 Management Team meeting)
Resolution ITU-R 2-6 with Annexes 1 and 2 (Rev. RA-12) http://www.itu.int/pub/R-RES-R.2-6-2012
CA/201 of 19 Mar. 2012 and its Add. 1 of 15 Jan. 2013 http://www.itu.int/md/R00-CA-CIR-0201/en
Proposed detailed Structure for the Draft CPM Report to WRC-15
http://www.itu.int/oth/R0A0A000007/en
CPM-15 Chairman’s Documents to ITU-R Resp. Groups http://www.itu.int/md/R12-WP1B-C-0094/en of 10 Sep. 2013
Kigali, Rwanda, 01-05 September 2014 14
Some guidelines for the preparation of
modifications to the Draft CPM Report
Mandatory use of the 2012 Edition of the
Radio Regulations (at: www.itu.int/publ/R-REG-RR-2012)
Mandatory use of the Draft CPM Report to WRC-12 (yet to be made available as a contribution to CPM15-2 & to the SC)
and of the CPM15-2 Templates (at: www.itu.int/oth/R0A0A000008)
Additional guidelines and examples on how to use
- revision marks with track changes and
- (yet to be made available)
highlights in Turquoise
Kigali, Rwanda, 01-05 September 2014 15
One example of modifications
of the Draft CPM Report
Kigali, Rwanda, 01-05 September 2014 16
Summary of the CPM Process
Radiocommunication Assembly +
World Radiocommunication Conference
2nd
CPM
session
Special
Committee(regulatory/procedural)
ITU-R Study Groups
SG 1 Spectrum management
SG 3 Radiowave propagation
SG 4 Satellite services
SG 5 Terrestrial services
SG 6 Broadcasting service
SG 7 Science services
Contributions from membership
(ITU MS & ITU-R SM)
CPM Report to
WRC
Res
. IT
U-R
2-6
1st CPM
session
Draft CPM
Report to WRC
WR
C A
gen
da
WRCProposals from ITU Member States
RA
Kigali, Rwanda, 01-05 September 2014 17
Preparation of common & coordinated proposals (Res. 72 (Rev. WRC-07))
•CPG15-4, 25-28 March 2014, Riga, Latvia
•CPG15-5, 23-26 September 2014, Marseille, France
•APG15-3, 9-13 June 2014, Brisbane, Australia •APG15-4, [February 2015]
Regional Commonwealth in the field of Communications
Asia Pacific Telecommunity
African Telecommunications Union
European Conference of Postal and Telecommunications Administrations
Inter-American Telecommunication Commission
WRC Regional Preparation (1/2)
•2nd meeting, 19-23 May 2014, Dubai, UAE •3rd meeting, [2014]
•XXIII PCC.II, 17-21 March 2014, Cartagena, Colombia •XXIV PCC.II, 29 Sep. – 3 Oct. 2014, Merida City, Mexico
•2nd APM meeting, 27-30 January 2014, Khartoum, Sudan •2nd AfriSWoG meeting, 26-29 Aug. 2014, Nairobi, Kenya
•WG 3rd meeting, 29 Oct. - 1 Nov. 2013, Yerevan, Armenia
•WG 4th meeting, 14 - 16 April 2014, Minsk, Belarus
•COM 4th meeting, 17 - 18 April 2014, Minsk, Belarus
Kigali, Rwanda, 01-05 September 2014 18
WRC Regional Preparation (2/2)
www.itu.int/go/wrc-15-regional
Kigali, Rwanda, 01-05 September 2014
1st
Meeting,
4-5 Dec.
2013
19
• Scheduled few months prior to CPM15-2 Presentation of the Draft CPM Report to WRC-15
(explanation of the draft Methods to satisfy the WRC-15 Agenda items)
Presentation and review of the regional groups’ draft views, positions and common proposals
2nd
Meeting,
12-13
Nov.
2014
• To be scheduled few months prior to WRC-15 Presentation of the CPM & Dir. Reports to WRC-15 Presentation and review of the regional groups’ draft
views, positions and common proposals
ITU Inter-regional Workshops
on WRC-15 Preparation
[3rd
Meeting
Q3 of
2015]*
• Scheduled halfway through the preparatory cycle Presentation and review of the on-going preparatory
studies of the ITU-R responsible groups for CPM-15 Presentation of the preliminary views,
draft priorities and positions of the regional groups Online archives of video presentations and documents
* see the ITU-R Meetings schedule at www.itu.int/en/events/Pages/Calendar-Events.aspx?sector=ITU-R
Webpage
Webpage
Kigali, Rwanda, 01-05 September 2014
ITU-R Study Groups: www.itu.int/ITU-R/go/rsg
Email: [email protected]
ITU-R Conference Preparatory Meeting www.itu.int/ITU-R/go/rcpm
Email: [email protected]
Resolution 808 (WRC-12): Preliminary agenda for the WRC-18
20
Second Session of CPM-15 in Geneva from 23 March to 2 April 2015