Preliminary Studies

of the Electric Power Distribution for CLIC

Cezary JACH (EN/EL)

CLIC Meeting

May 2009

Page 2: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

1. Power balance2. Layout3. Variants of the power distribution system4. Next steps

Technical Studies for the

Electric Power Distribution for CLIC

CLIC Meeting

May 2009

Page 3: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

3 TeV Power RequirementsSystem 0.5 TeV Power [MW] 3 TeV Power [MW]

Main Beam Magnets 11.1 25.8

Main Beam Injector RF 15.3 15.3

Drive Beam Magnets 14.1 46.7

Drive Beam Linac RF 61.0 263.3

Others 27.4 64.0

Total 129.3 415.1

Page 4: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Power Requirements

- Total consumption of active power = 415 MW- Assuming an average power factor of 0.85, the apparent

power will be approximately 500 MVA- 80% (400 MVA) of the load located near central complex

(CERN Prevessin, new substation)- 20% (100 MVA) of the load located outside central complex

(remote substations)

Page 5: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Layout (1)

e+ injector, 2.4 GeV

e- injector2.4 GeV

CLIC overall layout3 TeV

48 km

drive beam accelerator2.37 GeV, 1.0 GHz

1 km

drive beam accelerator2.37 GeV, 1.0 GHz

1 km

Drive Beam Generation

Complex

Main Beam Generation

Complex

Page 6: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Layout (2)

M S

RS

RS

RS

RS

RS

RS

RS

RS

RS

RS

8.7 km 4.9 km4.9 km

48 km

MS = Master SubstationRS = Remote Substation

Page 7: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Variant 1 – 400/18 kV Main Substation, 18 kV Remote Substations, 18 kV Distribution – 18 kV Utility Voltage

400 kV RTEEuropean Network

400 kV station Bois Tollot

CERN, existing installations

CLIC 400 kV

6x 400/18 kV, 100 MVA

18 kV loop

New installations for CLIC

Page 8: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Variant 1a – 400/66/18 kV Main Substation, 66/18 kV Remote Substations, 66 kV distribution, 18 kV Utility Voltage

400 kV RTEEuropean Network

400 kV station Bois Tollot

CERN, existing installations

CLIC 400 kV

5x400/18 kV, 100 MVA2x400/66 kV, 100 MVA

10x66/18 kV, 20 MVA66 kV loop

New installations for CLIC

Page 9: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Variant 2 – 400/66/18 kV Main Substation, 66/18 kV Remote Substations, 66 kV Distribution, 18 kV Utility Voltage

400 kV RTEEuropean Network

400 kV station Bois Tollot

CERN, existing installations

CLIC 400 kV

6x400/66 kV, 100 MVA

5x66/18 kV, 100 MVA

10x66/18 kV, 20 MVA

66 kV

New installations for CLIC66 kV loop

Page 10: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Variant 2a – 400/66/18 kV Main Substation, 66/18 kV Remote Substations, 18 kV Distribution, 18 kV Utility Voltage

400 kV RTEEuropean Network

400 kV station Bois Tollot

CERN, existing installations

CLIC 400 kV

6x400/66 kV, 100 MVA

5x66/18 kV, 100 MVA

2x66/18 kV, 100 MVA

66 kV

New installations for CLIC 66 kV

18 kV loops

Page 11: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Variant 3 – 400/36 kV Main Substation, 36 kV Remote Substations, 36 kV Distribution, 36 kV Utility Voltage

400 kV RTEEuropean Network

400 kV station Bois Tollot

CERN, existing installations

CLIC 400 kV

6x400/36 kV, 100 MVA

36 kV loop

New installations for CLIC

Page 12: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Summary (Substations)

Var. Voltages Substation Transformers

1 400 kV/18 kV 6 x 400/18 kV, 100 MVA

1a 400 kV/66 kV /18 kV 6 x 400/18 kV, 100 MVA 2 x 400/66 kV, 100 MVA 10 x 66/18 kV, 20 MVA

2 400 kV/66 kV/18 kV 6 x 400/66 kV, 100 MVA 5x 66/18 kV, 100 MVA 10 x 66/18 kV, 20 MVA

2a 400 kV/66 kV/18 kV 6 x 400/66 kV, 100 MVA 5 x 66/18 kV, 100 MVA 2 x 66/18 kV, 100 MVA

3 400 kV 36 kV 6x 400/36 kV, 100 MVA

Page 13: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

CLIC 400 kV / 36 kV Main Substation

100 MVA400 kV/36 kV

Remote loadsRemote loads

Local loads Local loads

400 kV Grid, Scc = 13 000 MVA

Page 14: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

CLIC 36 kV Remote Substation(Shaft Area)

Service Network

Surface

36 kV Busbar

Machine Network

400 V

400 V

Underground

400 V

400 V

(Alcove) (Alcove)

Tunnel

x V x V

Page 15: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

CLIC 36 kV Double Loop (End Section)

Machine Network

Service Network

Page 16: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

Major Cost Drivers

- Power requirements- Connection to 400 kV Grid via new transmission line?- Centrally located main substation (distribution voltages, number of

transformers, switchgear, protection, monitoring, etc.)- Remote substations (transformers, switchgear and 400 V panel-boards)- Cables in the tunnel (?) using loop configuration- Transformers (?), panel-boards in tunnel - Emergency generators, cabling, transformers, etc. associated with safety

system

Page 17: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

What’s Next?

- Preliminary design (chronologically)- Loads (voltage, apparent power, power factor, harmonics, locations, etc.)- Network topology (choice of variants, machine and service networks,

redundancy, safety networks, underground facilities, etc.)- Main substation preliminary design- Remote substations preliminary design- System simulations

- Cost estimate

Page 18: Preliminary Studies of the Electric Power Distribution for CLIC Cezary JACH (EN/EL) CLIC Meeting May 2009

What’s Next?

- June 2010- Preliminary Design Report- Cost Estimate

- Available Resources - discussion