Preliminary Plans Presentation
Revitalization/Expansion - Luxmanor Elementary School
Prepared for
Montgomery County Board of Education
August 2017
Preliminary Plans Presentation
Revitalization/Expansion - Luxmanor Elementary School Page 1
Hord Coplan Macht, Inc.
Luxmanor Elementary School Revitalization/ Expansion
6201 Tilden Lane
Rockville, Maryland 20852
Montgomery County Board of Education Mr. Michael A. Durso President
Dr. Judith R. Docca Vice President
Ms. Jeanette E. Dixon Member
Mrs. Shebra L. Evans Member
Mrs. Patricia B. O’Neill Member
Ms. Jill Ortman-Fouse Member
Mrs. Rebecca Smondrowski Member
Mr. Matthew Post Student Member
Montgomery County Schools Administration
Dr. Jack R. Smith Superintendent of Schools
Mr. James C. Song Director, Department of Facilities Management
Mr. Seth P. Adams Director, Division of Construction
Mr. Michael P. Shpur Architect, Division of Construction
Mr. Gary D. Mosesman Facilities Team Leader, Division of Construction
Mr. Robbie Badstibner Project Manager, Division of Construction
Ms. Julie Morris Facility Planner, Division of Capital Planning
Facility Advisory Process Involvement
Revitalization/Expansion - Luxmanor Elementary School Page 2
Hord Coplan Macht, Inc.
Involvement
The preliminary plans for the Luxmanor Elementary School revitalization/expansion project were developed based on the educational
specifications prepared by Montgomery County Public Schools (MCPS). Through a series of public work sessions, several design
alternatives were developed and evaluated.
Participants in Facility Advisory Process
Mr. Ryan Forkert Principal Luxmanor Elementary School Ms. Deborah Berger PTA Luxmanor Elementary School Ms. Andrea Celeste Staff Luxmanor Elementary School Ms. Kristen Cornelius Staff Luxmanor Elementary School Ms. Nancy Delasos Neighbor Community/Luxmanor Citizens Assoc. Ms. Saran Dionbate PTA Luxmanor Elementary School Mr. Barry Gudelsky Neighbor Community Member Ms. Marilyn Hammerman Neighbor Community/Luxmanor Citizens Assoc. Ms. Wendy Hookman-Vasser Staff Luxmanor Elementary School Ms. Hollie Hornstein Staff Luxmanor Elementary School Ms. Wendy Kalavritinos Staff Luxmanor Elementary School Ms. Joanne Kee PTA Luxmanor Elementary School Ms. Amy Kleponis Staff Luxmanor Elementary School Ms. Kimberly Klimek Staff Luxmanor Elementary School Ms. Rachel Manchester Staff Luxmanor Elementary School Ms. Abbe Milstein Neighbor Community/Luxmanor Citizens Assoc. Mr. David Nguyen Staff Luxmanor Elementary School Ms. Marcie Peters PTA Luxmanor Elementary School Ms. Debby Orsak PTA Luxmanor Elementary School Ms. June Rogul Neighbor Community Member Ms. Marvin Rogul Neighbor Community Member Mr. Nathan Sarkar Neighbor Luxmanor Elementary School
Facility Advisory Process Involvement (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 2A
Hord Coplan Macht, Inc.
Participants in Facility Advisory Process (continued) Ms. Sudipto Sarkar Neighbor Luxmanor Elementary School Ms. Kimberly Sperling PTA Luxmanor Elementary School Ms. Sheri Steisel Weiss PTA Luxmanor/ Luxmanor Citizens Assoc. Ms. Carolyn Tharpe-Robinson Staff Luxmanor Elementary School Ms. Cara Wagner Staff Luxmanor Elementary School
Project Information
Revitalization/Expansion - Luxmanor Elementary School Page 3
Hord Coplan Macht, Inc.
Background/History
Location: 6201 Tilden Lane Rockville, Maryland 20852
Cluster: Walter Johnson
History and Square Footage
of Existing Building: 1966 Construction of the Original School 25,413 Square Feet
1988 Classroom Wing/Gymnasium Addition 16,019 Square Feet
2008 Kindergarten + Art/Music Addition 20,262 Square Feet
Total 61,694 Square Feet
Site Size: 6.5 acres
Program Capacity: 740
Number of Relocatable Classrooms: 3 (to be removed after revitalization/expansion)
Planning Background: Luxmanor Elementary School was originally constructed in 1966. The Walter Johnson Cluster has
experienced large enrollment increases in the past decade, primarily driven by turnover of neighborhood
homes to younger families. New residential development is expected to contribute to area school
enrollment growth. The county’s White Flint and White Flint 2 Sector Plans provide for new multi-
family housing in the area over the next 20 to 30 years. Planning funds for the revitalization/expansion
project were appropriated for FY 2016 to begin architectural design work. Construction funds were
appropriated for FY 2018. The project is scheduled to be completed by January 2020.
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3A
Hord Coplan Macht, Inc.
Educational Program Objectives
The revitalization/expansion will accommodate the educational specification requirements for Luxmanor Elementary School. When
completed, the modernized facility will have both student capacity and core spaces designed for 740 students.
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3B
Hord Coplan Macht, Inc.
Educational Program Objectives
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3C
Hord Coplan Macht, Inc.
Educational Program Objectives
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3D
Hord Coplan Macht, Inc.
Educational Program Objectives
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3E
Hord Coplan Macht, Inc.
Educational Program Objectives
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3F
Hord Coplan Macht, Inc.
Project Design Objectives
The purpose of this project is to revitalize and expand the existing Luxmanor Elementary School to provide program spaces for grades
pre-K through five that meet the requirements of the educational specifications. The building will be in full compliance with the
Americans with Disabilities Act (ADA) and will provide the required teaching spaces and support spaces for the school programs.
The following are some of the key elements of the project design:
• The new three-story classroom building increases the capacity of the school while decreasing the existing building footprint.
• Clearly separated bus and student drop off loops are accommodated on site with more parking and queueing space.
• The exterior elevations coordinated to complement the 2008 addition.
• Natural daylighting maximized for student and staff occupied spaces.
• Clear interior circulation enhances passive security and ease of supervision of corridors.
• Major assembly spaces, i.e. gymnasium and multi-purpose room, are organized in a part of building away from classroom wing
and secured for community use during non-school hours.
• The main entrance is clearly identifiable and inviting.
• The administration is located adjacent to main entrance and has clear visibility of bus and student drop off loops for
supervision.
• The existing mature trees and forest are preserved.
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3G
Hord Coplan Macht, Inc.
Teaching Stations and Spaces Provided When Complete:
PEP Classrooms and Support Spaces: Visual Arts and Music: PEP Classroom 4 Art Room 1*
Observation Room 1 Storage 1*
Parent Group and Conference Room 1 General Music Room 1*
Equipment Storage 1 Instrumental Music Room 1*
PEP Speech Language Room 1 Storage 1*
Motor Therapy Room 1 Dual Purpose Room 1
Office 1
Instructional Media Center:
Kindergarten: Learning Environment 1
Classrooms 3 Work and Production Area 1
Classrooms 3* Media Support/Storage Room 1
Grades 1 through 5: Textbook Storage 1
Classrooms 20 Control Room/Storage 1
Classrooms 3* Main Telecommunication Closet 1
Future Classroom/Student Service 1 Telecommunication Closets 3
Special Education:
Special Education Classrooms (SCB) 2 Physical Education:
Grooming Room 1 Gymnasium (Equals 1 teaching station) 1
Office 1
Support Rooms: Storage Closets 3
Large Instructional Support Rooms 2 Outside Storage 1
Small Instructional Support Rooms 1
Small Instructional Support Rooms 2*
Staff Offices 3
Speech/Language Room 1
Therapy/Support Room 1
Testing/Conference Room 1 * Space in 2008 addition to remain
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3H
Hord Coplan Macht, Inc.
Multipurpose: Counseling Area: Multipurpose Room 1 Counselor’s Office 1
Chair Storage 1 Itinerant Staff Office 1
Table Storage 1
Platform 1 Staff Development Area:
Before/After Care Prep Area 1 Staff Development Office 1
Before/After Care Storage 1 Reading Specialist Office 1
Training/ Conference Room 1
Kitchen:
Serving Area 1 Health Services Suite:
Walk-in Cooler/ Freezer 1 Waiting Area 1
Dry Storage 1 Treatment/Medication Area 1
Office 1 Office/Health Assessment Room 1
Preparation Area 1 Health Assessment/Isolation Room 1
Rest Area 1
Administration: Toilet Room 1
General Office 1 Storage Area 1
Principal’s Office 1
Assistant Principal’s Office 1 Building Service Facilities:
Conference Room 1 Building Services Office 1*
Workroom 1 Locker/Shower Area 1
Telephone Booth 1 Compactor/Trash Room 1
Storage 1 Receiving Area 1
Record Room 1 General Storages 3
Toilet 1 PTA Storage 1
2nd Floor Workroom 1 Book Storage 1
3rd Floor Workroom 1 Building Service Outdoor Storage 1
Staff Lounge 1 Building Service Closest 5
* Space in 2008 addition to remain
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3I
Hord Coplan Macht, Inc.
Site Design Site Features:
Luxmanor Elementary School is located on a 6.5 acre property on the north side of Tilden Lane in Rockville, Maryland. The
Luxmanor Park, owned and managed by Maryland-National Capital Park and Planning Commission, is located on the north side and
the school utilizes the ball fields during school hours. The school will be relocated to Grosvenor Center for the duration of
construction. Construction will involve demolition of the two oldest wings of the building to be replaced with a new addition. The
two-story building wing constructed in 2008 will remain and connect to the new construction.
The student drop-off loop and bus loop have been located to utilize the existing curb cuts along Tilden Lane, but have been
reconfigured to the needed separation and enlarged to accommodate more parking and queueing spaces on site. Parking has been
increased from the current total of 51 to 80 parking spaces and the student drop off queue area has been increased to hold 29 vehicles.
Staff parking is located within the student drop-off loop. The bus loop has been isolated from vehicle traffic and is capable of
queueing 9 full length buses. Both bus and student drop-off loops are immediately in front of the school administration suite allowing
for visual supervision. Service access remains off of the bus loop. The existing fire department vehicle access lane that is west of the
school will be extended to provide fire access to the building.
The proposed site design saves as many trees and forest on the site as possible. The new hardscape layout has preserved all trees
adjacent to Tilden Lane and the surrounding community.
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3J
Hord Coplan Macht, Inc.
Building Design
General Description:
The proposed revitalization/expansion, designed to meet MCPS educational specifications, is a three-story, steel-framed structure with
masonry/ metal panel veneer and masonry interior partitions. The new building will connect to the existing two-story wing built in
2008. The new building is oriented with the academic spaces facing north/south for optimal daylighting. The front entry is located near
the center of the south façade, and administration is adjacent for supervision and to maintain security. The three-story academic wing
contains classroom space with PEP and Kindergarten on the first level, Grades 1-3 on the second level, and Grades 4-5 on the third
level. The gymnasium and multipurpose room are located in a wing east of the three-story classroom wing. The gymnasium is located
at the front to facilitate community use and includes a separate lobby for non-school access. The multipurpose room is located at the
north end and opens directly out to play space. The instructional media center is located on the second floor above the administration
suite. Resource spaces are located on all three floors to support the adjacent teaching spaces. The character of the replacement
building aims to create an attractive and inviting school building that fits within the context of the surrounding area and complements
the 2008 addition.
Classroom Technology:
The classrooms will be designed to support interactive educational technology that includes controlled, wireless computer access and
interactive whiteboard systems. The wireless technology throughout the building allows mobility of computer system and increased
flexibility in classroom utilizations. Individual classrooms are designed to provide a student seating arrangement that can be organized
into small groups for project-oriented teaching, or students can face the teacher in a traditional model.
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3K
Hord Coplan Macht, Inc.
Sustainability
The proposed project will be designed and constructed with an emphasis on the environmental sustainability. The architecture and
engineering systems will align with Montgomery County Public Schools sustainability principles to ensure long term operational
effectiveness. The project will be in compliance with Leadership in Energy and Environmental Design (LEED) standards. The new
facility will also meet the 2012 International Green Construction Code (IgCC).
Key Features related to the sustainability include the following:
• Alternative Transportation: Providing bike racks and preferred parking for low emitting/fuel-efficient vehicles and carpools.
• Open Space: Preserving the maximum possible percentage of vegetative open space.
• Stormwater: Managing stormwater to reduce runoff quantity and to improve quality.
• Using highly reflective roof surfaces to reduce the heat island effect and heat gain to the building.
• Water Conservation: Installing water-conserving, low-flow plumbing fixtures.
• Energy Conservation: Optimizing energy performance by providing an energy efficient building envelope, lighting systems,
and heating, ventilating, and air conditioning systems.
• Enhanced Commissioning: Verifying the design, equipment selection, installation, and operation of equipment is optimized
through enhanced commissioning of the building systems.
• Construction Waste Management: Diverting construction waste from landfills and recycling the materials.
• Indoor Air Quality: Following an indoor air quality management plan and utilizing low-emitting building materials.
• Thermal Comfort: Providing a high level of occupant control over individual lighting and thermal comfort to provide a better
indoor environment.
• Daylighting: Maximizing daylighting in classrooms.
• Regional and Recycled Materials: Utilizing construction materials that are manufactured from recycled products and that are
regionally manufactured.
• Implementing a Green Housekeeping plan.
• Minimizing background noise level from HVAC systems in classrooms and other core learning spaces and control
reverberation time with sufficient sound absorptive materials.
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 3L
Hord Coplan Macht, Inc.
Sustainability, (continued)
One of the primary design factors required to achieve a sustainable facility is the conservation of energy. The importance and consideration
placed on energy conservation will be reflected in the configuration and orientation of the building, the selection of materials, and the
mechanical/electrical systems utilized. In addition, a direct digital automatic temperature control system will be provided to monitor and
control all new heating, ventilation, and air conditioning equipment from a central building management system. The new facility will be
designed to meet or exceed 2015 International Energy Conservation Code (IECC), as well as Montgomery County energy conservation
codes. The design will incorporate the ANSI/ASHRAE/IES Standard 90.1-2016, Energy Efficiency Standard for New Building.
Project Information (continued)
Revitalization/Expansion - Luxmanor Elementary School Page 4
Hord Coplan Macht, Inc.
Vicinity Map
Existing Site Plan
Revitalization/Expansion - Luxmanor Elementary School Page 5
Hord Coplan Macht, Inc.
Proposed Site Plan
Revitalization/Expansion - Luxmanor Elementary School Page 5A
Hord Coplan Macht, Inc.
Existing First Floor Plan
Revitalization/Expansion - Luxmanor Elementary School Page 6
Hord Coplan Macht, Inc.
0 10 20 40 80 FT
N
Proposed First Floor Plan
Revitalization/Expansion - Luxmanor Elementary School Page 6A
Hord Coplan Macht, Inc.
0 10 20 40 80 FT
N
Existing Second Floor Plan
Revitalization/Expansion - Luxmanor Elementary School Page 6B
Hord Coplan Macht, Inc.
0 10 20 40 80 FT
N
Proposed Second Floor Plan
Revitalization/Expansion - Luxmanor Elementary School Page 6C
Hord Coplan Macht, Inc.
0 10 20 40 80 FT
N
Existing Third Floor Plan
Revitalization/Expansion - Luxmanor Elementary School Page 6D
Hord Coplan Macht, Inc.
0 10 20 40 80 FT
N
Proposed Third Floor Plan
Revitalization/Expansion - Luxmanor Elementary School Page 6E
Hord Coplan Macht, Inc.
0 10 20 40 80 FT
N
Existing Elevations
Revitalization/Expansion - Luxmanor Elementary School Page 7
Hord Coplan Macht, Inc.
South Elevation
North Elevation
0 20 40 80 FT
Proposed Elevations
Revitalization/Expansion - Luxmanor Elementary School Page 7A
Hord Coplan Macht, Inc.
South Elevation
North Elevation
0 20 40 80 FT
Existing Elevations
Revitalization/Expansion - Luxmanor Elementary School Page 7B
Hord Coplan Macht, Inc.
East Elevation
West Elevation
0 20 40 80 FT
Proposed Elevations
Revitalization/Expansion - Luxmanor Elementary School Page 7C
Hord Coplan Macht, Inc.
East Elevation
West Elevation
0 20 40 80 FT
Proposed Elevations
Revitalization/Expansion - Luxmanor Elementary School Page 7D
Hord Coplan Macht, Inc.
Southwest View of Front of Building
Northeast View of Back of Building
Project Team, Schedule, and Estimated Construction Costs
Revitalization/Expansion - Luxmanor Elementary School Page 8
Hord Coplan Macht, Inc.
Design Team Members
Architect: Hord Coplan Macht, Inc.
Civil Engineer: A. Morton Thomas & Associates, Inc.
Structural Engineer: CMJ Structural Engineering, Inc.
Mechanical/Electrical Engineer: James Posey Associates, Inc.
Project Schedule
Preliminary Plans Presentation: August 2017
Construction Documents Complete: October 2017
Award Construction Contract: July 2018
Project Complete: January 2020
Estimated Construction Costs
Existing Building to remain 20,262 square feet
Demolition: 41,432 square feet
New Construction: 81,927 square feet
Total 102,189 square feet
Construction Cost Estimate for $26,409,000
Building and Site: