Preliminary Design ReviewWODY Group

Class Project

Fall 2000

ECE 6276

Page 2: Preliminary Design Review WODY Group Class Project Fall 2000 ECE 6276

Mission Statement

• To provide ISA for different profiles of a reconfigurable DSP and to assist and support other groups to perform tasks in a speedy and most efficient way

Page 3: Preliminary Design Review WODY Group Class Project Fall 2000 ECE 6276

How WODY fits in the Big Picture

• To create ISA for different profiles of DSP

• To provide ISA to the Decoder group

• To assist algorithm and architecture group in testing the decoders and profiles

Page 4: Preliminary Design Review WODY Group Class Project Fall 2000 ECE 6276

Overall Mission Plan

Task Estimated Dateof Completion

Regroup Modules into Profiles 11/3 (Done)

Create Mission Statement and Mission Plan 11/10 (Done)

Prepare for Preliminary Design Review 11/15 (Done)

Create ISA for Each Profile 11/18 (Ongoing)

Create Small Test Program in Assembly for Each Profile

11/19 (Ongoing)

Execute Signal Tests for Each Profile 11/24 (Ongoing)

Create and Maintain Website 11/29 (Ongoing)

Prepare for Critical Design Review 11/29

Page 5: Preliminary Design Review WODY Group Class Project Fall 2000 ECE 6276

Mission Plan SpecificsCreate ISA for Each Profile

Milestones Preliminary ISA

Reservation tables for Profile 1, Profile 2,and Profile 3

Problems Syntax of ISA for use in WinTim•Solution: Modify ISA documentation

Machine Code Format•Solution: Modify Machine Code Format

Example: change order of register operands

Insight Work with Decoder group more closely in development of ISA

No benefit to parallel instructions on Profile 1and Profile 2

Tasks to be Completed Continue working with Decoder group until decoder done and make any changes to ISA that they recommend

Page 6: Preliminary Design Review WODY Group Class Project Fall 2000 ECE 6276

Mission Plan SpecificsCreate Small Test Program in Assembly for Each Profile

Milestones Assembly code for test algorithm for Profile 1

Problems None

Insight Keeping track of registers can get really confusing

Tasks to be Completed Assembly code for test algorithm for Profile 2 and Profile 3

Page 7: Preliminary Design Review WODY Group Class Project Fall 2000 ECE 6276

Mission Plan SpecificsExecute Signal Tests for Each Profile

Milestones Decoder and Data Path Integration for Profile 1 complete

Problems None

Insight None

Tasks to be Completed Testing

Page 8: Preliminary Design Review WODY Group Class Project Fall 2000 ECE 6276

Mission Plan SpecificsCreate and Maintain Website

Milestones Website established at

http://users.ece.gatech.edu/~gt1714a/ece6276/

Problems None

Insight For professional and coherent look, need website template

Tasks to be Completed Continuing Updating Website with Latest Infoand Data