    Copy No.

    NASA PROGRAM GEMINI WORKING PAPER NO. 5031

    PREFLIGHT TRAINING PLAN FOR FOURTHM A N N E D GEMINI FLIGHT CREW

    (GTA-6)

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    2/20

    . . , , , - : . _ . . . , . tNASA PROGRAM GEMINI WORKING PAPER- NO'. 5051

    PREFLIGHT TRAINING PLAN FOR FOURTHMANNED GEMINI FLIGHT CREW

    (GTA-6)

    Prepared by: Mission Training SectionSpacecraft Operations Branch

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    3/20

    TABLE OF CONTENTS , 'Section " Pag1.0 SUMMARY . . ' 12.0 INTRODUCTION . . . . . . . . . . 2-3.0 PREPARATION AND TRAINING . . . . . . . . .-.'. . . . . .

    3.1 Spacecraft Tests 33-2 Gemini Mission Simulator Training 33-4 Launch Abort and Reentry Training 33-5 Egress and Recovery Training 33.6 Celestial Training 3

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    4/20

    iv

    FIGURES

    Figure ' Pagelt-1 Time spent by each flight crew member in training

    . or related activities during specific missiontraining period . . . . . . U-l14-2 Crew training schedule. . . . ... .

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    5/20

    1.0 SUMMARY

    This plan defines the training to be accomplished by the primarand backup crews in preparation for the fourth manned Gemini Mission(GT-6). It is intended as a guide to the flight crews and supportpersonnel responsible for training, and it does not represent absolutraining requirements. The training outlined in this document isformal scheduled training, and it does not include such crew activitas study and physical fitness which are accomplished on an individubasis, nor those activities that are more directly related to flightoperations support and engineering efforts.

    The Crew Commander is responsible for the accomplishment of theoverall training plan. Effective planning and coordination by allagencies involved will be essential to the successful completion oftraining objectives within the relatively short period available fortraining. Equipment location and availability will be such as tominimize crew and ground support personnel travel requirements.

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    6/20

    2 . 0 IKTRODUCTIOK " . .This training plan outlines the specific mission training to beaccomplished "by the flight crews for the fourth manned Gemini Missio(GT-6). Revisions to this document will be the responsibility of thFlight Crew Support Division (FCSD) with the authorization of theAssistant Director for Flight Crew Operations.The criteria used in developing this training plan" are as follo1. Although crew members are normally scheduled by teams and itheir designated seat positions, cross-seat and cross-team, trainingbe done so that each crew member can satisfactorily perform the morecritical tasks. This approach, in addition to insuring mission succwill permit some late-date flexibility in reassignment of crew membeand alleviate training schedule problems.2. The backup crew must be as prepared for flight as the primacrew. This will permit, if the need arises, replacement as a team oindividual seat position with no or minimal delay to the launch sche

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    7/20

    2-2

    Flight Crew Support Division (FCSD) training personnel. A working grofrom the Astronaut Office and FCSD personnel directly involved intraining will be responsible for the planning and coordination, of allcrew training activities. The working group will be composed-of:Chief, Operations and Training (Astronaut Office)Flight Crew Members , . .Mission Training Section RepresentativeSimulator Operations Section Representative

    Representatives from other organizations will attend only when require

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    8/20

    3.0 PREPARATION AND TRAININGThe following is a description of each major area in which thecrews will be extensively involved. Schedules defining specific arof preparation and training are included in Figure k-2 to illustrat

    proper sequencing of individual crew activities.

    3.1 SPACECRAFT TESTS

    Participation by flight crew members in the testing of their scraft is of significant operational and training value to them. Itnecessary to have an operator or observer inside the spacecraft durmany of the tests. The flight crews will frequently fulfill this rquirement for the major spacecraft tests and, in so doing, learn thcharacteristic functioning of their spacecraft systems. In additiowhen modifications to the spacecraft are considered or required, thcrews will be able to make inputs with full knowledge of the situat

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    9/20

    3-2

    3-1.2 Spacecraft Ho. 5. -Crew

    Simultaneous Launch . .Demonstration . . 4 .Final Simulated Flight 2GT-5 Mission ' . kDe"briefing h

    3.1.3 Spacecraft No. 6.-.Crew St. Louis

    System Assurance Test kSimulated Flight Test 4

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    10/20

    Final Spacecraft Systems Test kFinal Simulated Flight Test b

    3.2 GEMDJI MISSION SIMULATOR TRAINING

    The f-light crew will complete an extensive training program usthe Gemini Mission Simulators to provide them with experience in thnormal and abnormal operation of spacecraft systems and flight contThe program consists of JO training sessions, usually of 1 1/2 to 3hours duration. This training is divided into four training phasesa. Phase I - Familiarizationb. Phase II - General systems trainingc. Phase III - Specific mission trainingd. Phase IV - Launch and network simulations

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    11/20

    Session 1 - Simulator familiarization and general spacecraft sys-tems operation.Sessions 2 and 3 - Flight plan review, with emphasis on operationsusing the visual display system. The crews will wear pressure suitsduring one of these exercises.3.2.2 Phase II - General systems training. - The purpose of thisphase is to train the crews in system failure detection and analysis

    and the application of alternate procedures and operational modes. Theapplication of specific mission rules is minimized. The number of .failures per session will "be kept to a level that will allow the crewsto discuss and analyze each failure in detail. .

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    12/20

    Session 7 - Retrofires and reentries (suited).Session 8 - Rendezvous mission (suited).Session 9 - Normal mission (suited).Session 10 - Launch aborts (suited).Session 11 - Retrofires and reentries.Session 12 - Rendezvous mission (suited).Session 1J - Normal mission (suited).Session 1 * 4 - - Normal mission (suited).3.2.k Phase IV - Network simulation.- During the final phase otraining on the mission simulator a series of network exercises willconducted that will involve the flight crews and ground network supppersonnel. During these exercises flight control is rehearsed exactas it is planned for the mission. The crews will occupy their posit

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    13/20

    3-6

    ^Session 8 - Reentry Simulation.*Session 9 - Reentry Simulation.*Session 10 - Launch Simulation.^Session 11 - Launch Simulation.*Session 12 - Network Simulation (Backup crew).*Session 13 - Network Simulation (Primary crew).Asterisks denote those sessions in which crew participation isplanned. The crews will participate in all of the .launch and reentrysimulations, but because of the limited crew training value of the net-work simulations and the simulated network simulations, each crew willparticipate in only two of these simulations.

    3.3 TRANSLATION AND DOCKING TRAINING

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    14/20

    Group I - Normal launch with minor deviations due to winds,transients, high or low booster thrust,etc.Group II - Engine/propulsion failures.Group III - Staging/sequential failures.Group IV - Tank pressurization failures.Group V - Controls/hydraulics failures.Group VI - Instrument failures.Group VTI - Electrical/ordnance failures.Group VIII - Selected double failures.

    5.5 EGRESS AND'RECOVERY TRAINING

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    15/20

    3-8

    constellations near the orbital plane and a simulation of the 'Agenaspacecraft acquisition lights as seen from 10 to 60 miles against vari-ous star backgrounds.

    3.7 ZERO-G TRAINING

    The crews will practice crew station procedures at zero-g duringa training flight in a KC-135 aircraft at Wright-Patterson AFB,Ohio.

    3.8 PARACHUTE TRAINING

    The flight crew will receive a review briefing on parajump tech-niques and procedures and each crew member will make two parachute land-ings over water in full flight gear. A parasail will be used for thistraining and the crews will wear the harness, lanyards, and egress gearapplicable to a parachute landing and survival.

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    16/20

    3.10.2 Systems briefings.- The flight crews will receive a seof briefings covering each major spacecraft systems at.the. beginnincrew participation in spacecraft testing, and later at Cape Kennedy,approximately six weeks before flight. A systems review briefing wibe held approximately 10 days prior to flight at Cape Kennedy. Thesbriefings will be given by engineers involved in spacecraft testing.Each system will be discussed in detail with emphasis on operationatechniques and functional interrelationships.

    3.10.3 Flight experiments.- The experiments for this mission wbe reviewed in general with the flight crews at the beginning ofspecific mission training, approximately four months prior to flight.These briefings will be given by the experimenters and Flight Experiments Section personnel, emphasizing experimental objectives and creprocedures. Experiments will be reviewed again at approximately sevweeks and two weeks prior to flight to cover latest status and modifcations to equipment and procedures. The Crew Station Mockup will bused early in the training period to develop proficiency in the manilation and stowage of experimental equipment. The Gemini MissionSimulator, the Part Task Trainer, and the Translation and Docking Silator will be used for operational crew training on experiments dur

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    17/20

    3-10

    3.11.5 Contractor visitations.- In addition to spacecraft systemtests, the flight crews will spend a considerable amount of time sup-porting engineering operations and participating in various evaluationsat contractor facilities.

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    18/20

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    19/20

    4-2TIME (Hours) OO ouS

    150 SPACECRAFT TESTING

    75 MISSION SIMULATOR

    50

    30

    30

    SYSTEMS BRIEFING

    FLIGHT PLAN REVIEWS

    MAC RENDEZVOUS SIMULATOR

  • 8/7/2019 Preflight Training plan for Fourth Manned Gemini Flight Crew (GTA-6)

    20/20

    WEEKS TO GT-6 LAUNCH

    24

    ZG

    1

    ERiiEM|

    23

    0 G T N GI iIINI SYS 1

    SYS ASSUl

    22 21H I 1 1 I I| |

    BRI E F

    1 TEST i IP|H I 1

    20 19

    A G E 3 W

    T R A N S

    .1 SIM FL

    '

    18 17 16

    I IEXP BRIEF

    I I I I I I I I I 15

    MOCKUP STOWAGE REVIEWI I I I I I I I i IMAC RENDEZVOUS SIMm i i

    TRANS AMD DOCK TNG

    I I I !

    13

    WATER EGRESS TNG

    1

    ALT CHAMB HOR SEDRi i i i i i i i i i i i i i iSIMULTANEOUS LAUNCH DEM

    PARA TNGI I I I I IFLT PLAN" REVIEW

    11

    PLANETARIUM

    LAUNCH ABORT TNG

    CMS TNG

    PLAN X

    Figure 4-2. CREW TRAINING SCHEDULE

    PREMATE VALIDATION

    PAD EGRESS TNG

    I

    NET SIMSI i

    MATEEVIRON AND JOINT G & C

    i I I I i i i i i i i iJOINT COMB SYS TEST

    i i I I I . I I I I I I I IFLT CONFIG MODE TEST

    I I IWIi i II !

    as i

    FIra-|

    TE

    4

    ffi1

    ..T

    .

    13T

    V I

    C

    :

    LE

    :i

    ;

    M

    'L

    ,IGHT & BA LI I 1 i i iS L A U N C H I

    BH

    i

    )E 2

    3

    IE

    .3F

    :t

    FIN

    i

    1A .]

    .

    L

    S Y