PREFEASIBILITY REPORT
OF
HIWARDARA LIMESTONE & DOLOMITE MINE Location: Village : Hiwardara, Taluka : Wani, Dist : Yavatmal, Maharashtra
(Area 171.09 Ha; Production Capacity @ 0.2 MTPA Limestone/Dolomite)
PROJECT PROPONENT
M/S. SHREE BAJRANG SALES PVT. LTD. 20, New Cotton Market, Nagpur-440018
July 2017
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
II M/s Shree Bajrang Sales Pvt. Ltd.
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY ................................................................... … 1
2. INTRODUCTION OF THE PROJECT ..................................................... 4
i Identification of project & project proponent
ii Brief description of nature of the project
iii Need for the project
iv Demand supply gap
v Imports vs indigenous production
vi Export possibility
vii Domestic export market
viii EMPLOYMENT generation (direct & indirect)
3. PROJECT DESCRIPTION ........................................................................... 7
i Type of project
ii Location
iii Alternate site
iv Size of magnitude of operation
v Process description
vi Raw materials sources & transportation
vii Resource recycling .
viii Water requirement & supply
ix Waste generation and waste management
x Schematic representation
4. SITE ANALYSIS ................................................................................... 14
i Connectivity
ii Landuse & land ownership
iii Nearest distance from proposed site
iv Topography
v Existing landuse pattern
vi Existing Infrastructure
vii Soil classification
viii Climate
ix Social infrastructure
4. PLANNING BRIEF ............................................................................... 19
i Planning concept
ii Population projection
iii Landuse planning
iv Infrastructure demand
v Amenities & facilities
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
III M/s Shree Bajrang Sales Pvt. Ltd.
5. PROPOSED INFRASTRUCTURE ............................................... 19
i Industrial area
ii Residential area
iii Green belt
iv Social infrastructure
v Connectivity
vi Drinking water
vii Sewerage system
viii Industrial waste management
ix Solid waste management
x Power requirement & supply
6. REHABILITATION AND RESETTLEMENT ........................................................................................ 20
7. PROJECT SCHEDULE & COST ESTIMATION ................................................................................. 21
8. ANALYSIS OF PROPOSAL FINAL RECOMMENDATIONS ........................................................... 21
9. ANALYSIS OF PROPOSAL FINAL RECOMMENDATIONS .......................................................... 22
ANNEXURE
I. APPROVAL LETTER FROM IBM FOR MINING PLAN .....……………………………………….….. 23
II. ENVIRONMENT MANAGEMENT PLAN .....……………………………………………………………….. 25
III. POPULATION OF THE VILLAGES IN 10 KM BUFFER ZONE ……………………………………………….……27
IV. ESTIMATED PROJECT CAPITAL COST & PRODUCTION COST ………………………………….…. 28
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
1 M/s Shree Bajrang Sales Pvt. Ltd.
1. EXECUTIVE SUMMARY
M/s. Shree Bajrang Sales Pvt. Ltd (SBSPL) was incorporated under the companies Act,
1956, has proposed a Cement plant in Maharashtra. In order to cater the need for
limestone & dolomite the company applied for the mining lease near village Hiwardara,
Tahsil Wani, Yavatmal District, Maharashtra.
State Govt. of Maharashtra has recommended for 171.09 Ha. of area for mining of
Limestone and Dolomite
The applied M.L. area over 171.09 hectares is covered within the Survey of India toposheet
No. 56 I/13 on a scale of 1:50,000 and is bounded by the Latitude 190 50’28” N to 19050’ 57”
N Longitude 780 53’ 08”E to 780 53’ 31”E.
M/s. SBSPL has initiated all the necessary steps for implementation of limestone mining
project in Yavatmal, Maharashtra. The capacity of the proposed limestone mine to cater the
need of cement plant is 0.2 MTPA.
The applied mining lease area covers 171.09 hectares consisting of 116.02 Ha Private Land
and 55.07 Ha Government Land.
The general topography of the study area is slightly undulating to flat. The general altitude
of the study area varies between 220-234 m above Mean Sea Level (MSL).
The proposed Limestone mine (171.09 hectares) will be developed as Fully Mechanized
Mine for the production of limestone @ 0.2 MTPA. Commercially exploitable limestone
deposits occur in this proposed mining lease. The net geological reserves are estimated to
be about 15.02 Million tonnes and the mineable reserves are estimated to be 12.56 Million
tones.
The cutoff grade of limestone is 53.74% CaO content. Since, the limestone (both CGL + MGL)
is having CaO-content + 42 % and MgO within 3 % (norm upto 4 %,), both are suitable for
cement making. Hence, for the purpose of mining, no differentiation between CGL and MGL
has been made.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
2 M/s Shree Bajrang Sales Pvt. Ltd.
Considering the mineable proved reserves 12.56 million tonnes and the proposed
production of 0.45 MT of graded ore for 5 years balance 12.11 (12.56-0.45 MT) the rated
annual production of 0.2 million tonnes, the life of the mine will be 12.11/0.2 = 60.55 + 5
=65.55 years (say 66 years).
After proposed exploration the present reserve will automatically get increased with the
increase in anticipated life of mine.
Considering the scale of operation, geological setting and the nature of deposit, it is
proposed to adopt opencast method of mining with single shift basis involving ripping /
dozing, drilling- blasting, manual sorting, sizing and stacking as well as mechanized loading
and transportation. In this mining lease area, the proposed method of mining will be
undertaken opencast mechanized method.
For proposed yearly production, the OBS will be removed by Dozer cum scrapper. The
required slope of 450 will be maintained for OB bench/benches.
The water requirement of the project is estimated to be 50 m3/day. 35 m3/day of the water
is required for dust suppression (within the lease and outside the lease in nearby villages),
plantation and dust vehicle washing. 10 m3/day is required for drinking purposes. The water
requirement will be met from boreholes proposed within the mining lease and from
rainwater collected in mining pit. Necessary permissions shall be obtained from the
competent authorities.
The power requirement will be met from MSEB grid.
Since, the limestone meets the quality requirement of cement plan, no beneficiation is
required for this limestone.
Presently, in this Mining plan, there is no proposal for reclamation of land, since, the depth
of mining pit will be only 15 m during this mining plan period. The ultimate pit limit for
limestone mining will be marked after completion of proposed exploration programme.
However, the fully mined out quarries, some will be reclaimed and others, if cannot be
reclaimed, the same will be developed as water reservoir, for agriculture and pisciculture.
The mining will be carried out as per the approved mining plan. During Mining Plan period,
the mining operation will be done by development of mechanized opencast method. The
plantation program will be taken up in the areas in future in a systematic manner and
plantation will be carried out, starting with soil binding grasses and shrubs followed by
larger trees species. Local varieties of plants should be given predominance along with
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
3 M/s Shree Bajrang Sales Pvt. Ltd.
introduction of some exotic species. Broad casting of seeds of local shrubs will be extremely
useful in providing an immediate green cover.
Uncontaminated topsoil, will be meticulously removed and transported to the non
mineralized zone for future plantation.
Estimated project cost is Rs. 1.12 crores The capital budget for environmental protection
measure is estimated to be Rs 20 Lakhs, while recurring cost is estimated to be 10 lakhs.
The cost analysis in terms of economic viability of the project is presented at in this report.
No historical monument or public building exists near the area and within 10 kms radius.
However, few small temples located at close proximity of the villages.
There is no National Park, Wildlife sanctuary, defense installation or sensitive area located
within 15 km radius of the proposed mine.
The mining operations shall be carried out after obtaining all statutory permissions and shall
be carried out as per approved mining plan.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
4 M/s Shree Bajrang Sales Pvt. Ltd.
2. INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION.
i) Identification of Project and Project Proponent
M/s. Shree Bajrang Sales Pvt. Ltd (SBSPL) was incorporated under the companies Act, 1956,
has proposed a Cement plant in Maharashtra. Communicational details of the company are as
under;
M/s. Shree Bajrang Sales Pvt. Ltd.
20, New Cotton Market
Nagpur-440018
Phone: 0712-6666555
Fax : 0712-2721484
ii) Brief description of nature of the project
M/s. Shree Bajrang Sales Pvt. Ltd (SBSPL) has established a Cement plant near Maregaon Dist.
Yavatmal, Maharashtra. In order to cater the need for limestone the company applied for the
mining lease near village Hiwardara, Tahsil Wani, Yavatmal District, Maharashtra. The proposed
Limestone mine (171.09 hectares) will be developed as Fully Mechanized Mine for the
production of limestone @ 0.2 MTPA . Commercially exploitable limestone deposits occur in
this proposed mining lease. The net geological reserves are estimated to be about 15.02 Million
tonnes and the mineable reserves are estimated to be 12.56 Million tones.
Project appraisal:
This limestone deposits in villages Hiwardara having total area 171.09 Ha in Tehsil- Wani in
Yavatmal Dist. (Maharashtra) have been prospecting by M/s. Shree Bajrang Sales Pvt. Ltd
(SBSPL), Nagpur.
Maharashtra State Govt. has recommended for 171.09 Ha. of area for mining of Limestone
and Dolomite
Mining Plan with ultimate capacity of 0.2 MTPA has also been approved by Indian Bureau of
Mines with Progressive Mine Closure Plan has been approved by Indian Bureau of Mines
vide letter no YTL/LST/MPLN-826/NGP dated 20.03.2003. (Annexure I)
In order to obtain environmental clearance as per the EIA Notification 2006 the
prefeasibility report is being submitted along with the application Form I for the project with
production capacity of 0.2 MTPA. The project is categorized as Category A project as per EIA
Notification 2006.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
5 M/s Shree Bajrang Sales Pvt. Ltd.
iii) Need for the project and its important to the country and or region.
Limestone is one of the major mineral deposits occurring in the Indian sub-continent. It has played
a great role in development of civilization and industrialization. The occurrence of limestone ore in
the proposed area is proved by the way of exploration and its production has important role in the
local cement industries. The applied M.L. area over 171.09 hectares is covered within the Survey
of India toposheet No. 56 I/13. The capacity of the proposed limestone mine to cater the need of
cement plant is 0.2 MTPA. The region, where the project is situated is mostly dependant on
agriculture and forest. The development of mining in the area is directly and indirectly going to
contribute in increasing employment, infrastructure, communication, and socioeconomic
infrastructure.
iv) Demand Supply Gap.
It is an essential constituent in Ferro-manganese, Steel and Ferro-alloys metal manufacturing and
as well as manganese based chemicals. Its demand in industrial area of Bhopal and Jabalpur,
Maharashtra.
v) Imports vs. Indigenous production. India ranks among the leading
producers of limestone in the
world.. The Indian limestone
market contains big suppliers
and small regional companies.
Limestone suppliers work in
collaboration with designers to
create a strong demand for
limestone in India. Backed by
significant investments in
commercial, infrastructure and residential projects, the Indian cement industry has recording
significant growth for more than a decade. Limestone is a key raw material in production of
cement and the cement industry is also expected to record growth. The interior and exterior
design industry is also a key driving factor for the growth of the limestone industry.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
6 M/s Shree Bajrang Sales Pvt. Ltd.
vi) Export Possibility.
The policies of Government on economic development have given various subsidies like slashing
the import duties and provisions for the Indian industry to grow indigenously. Hence, there is a
good possibility of export of limestone but the proposed mine shall be captive source for the
cement plant of the company to be established in Yavatmal District, MP.
vii) Domestic / export Markets.
Domestic market for Limestone is well also established.
viii) Employment Generation (Direct and Indirect) due to the project.
The mine will directly employ about 127 workers. There will be employment generation of double
this number in secondary and tertiary sectors. It is proposed to employ the local population
wherever possible in the proposed project activities.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
7 M/s Shree Bajrang Sales Pvt. Ltd.
3 PROJECT DESCRIPTION
i) Type of project including interlinked and Interdependent project, if any.
The proposed project is Mining by opencast fully mechanized mine and the mine will be captive
source for raw material @ 0.2 MTPA to the proposed Cement Plant in Yavatmal District,
Maharashtra.
ii) Location : Figure 1 gives the location of proposed Limestone/Dolomite Deposit.
Administrative
District
: Yavatmal
(Maharashtra)
Tahsil : Wani
The applied M.L. area over 171.09 hectares is covered within the Survey of India toposheet No.
56 I/13 on a scale of 1:50,000. The location map on toposheet showing general location, specific
location, and project boundary & project site layout with coordinates of mining lease boundary
is shown on Figure 2.
Figure 1
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
8 M/s Shree Bajrang Sales Pvt. Ltd.
Figure 2 : Location on Toposheet (56 I/13) of Hiwardara Limestone & Dolomite Mine
Hiwardara Limestone & Dolomite mine is about 20Km from Wani town. Nearest railway station
is Kayar at distance 7 km. The SBSPL’S Cement Plant near Maregaon Dist. Yavatmal,
Maharashtra is about 35 Km.
iii) Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental consideration gone into should be highlighted.
Mining is a site specific and has to be undertaken at the place of the occurrence of the mineral
and hence no alternative sites explored.
iv) Size or magnitude of operation.
The proposed mining Lease Area is 171.09 Ha with Production capacity of
limestone 0.2 MTPA. During the course of mining it is proposed to undertake exploration in the
granted lease area. The reserves may substantially increase in the Lease to be granted.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
9 M/s Shree Bajrang Sales Pvt. Ltd.
v) Project description with process details (a schematic diagram/ flow chart
showing the project layout, components of the project etc. should be
given).
Geological formations:
o Soil : Soil is pale brown in colour and is formed due to decomposition of Deccan trap. It is
found to occur as a thin layer at places. The thickness of soil is 0-0.5 m. For the sake of
calculations it is considered to be 0.5 m.
o Dolomite : Predominantly there are exposures of Dolomite overlying Limestone formation
all over the area. Dolomite is in shades of brown in colour. On the surface of limestone and
dolomite occurs in bands but the dolomite is found to occur as capping in the eastern
portion along the road.
The formation maintains a strike line of WNW-ESE with dips of about 10 to 20 degrees
towards south-west. The strikes and angles of dip are measured form the out crops and also
from Trial Pits. The thickness of dolomite formation varies from 0.8 m to 1.5 m. For the
sake of calculations the average thickness is considered to be 1.5 m.
Out of 13 trial pits given in the area, trial pit no. 1,2,5 6 & 7 have proved the existence of
dolomite3 bands along w2ith limestone and trial pit no. 10, 11, 12 & 134 have proved the
existence of Dolomite.
o Limestone : all over the area there are a number of exposures of limestone. The exposures
are due to erosion of Dolomite above. In this region below dolomite capping the limestone
formation is found to occur in depth which is proved by drilling and it nearby mines.
The formation maintains strike line of WNW-ESE with dips of about 10 to 20 degrees
towards South-West. The strikes and angles of dip are measured from the out crops and
also from trial pits. Limestone is fine to medium grained, massive and compact in nature
with grayish in colour. Out of 13 trial pits given in the area, trial pit no. 7 has proved the
existence of limestone.
Details of Exploration : In was proposed to give 2 trial pits (PTP-1 & PTP-2) from the floor of
working pit upto a depth of 5 m during 5th year of working after grant of Mining Lease.
None of the pits is given. However Lessee has drilled 12 bore holes in the northern part of
the area (BH-1 to BH-12). The details are given below.
Reserves: A summarized table of reserve & quality are as under:
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
10 M/s Shree Bajrang Sales Pvt. Ltd.
Reserves Limestone (tonnes)
Dolomite (tonnes)
Total (tonnes)
Limestone Dolomite
Av. CaO %
Av. MgO %
Av. CaO %
Av. MgO %
Proved Category
5,639,094 6,923,313 12,562,407 52.2 1.5 32.2 19.6
Description of present mining methods : Present Size of Pits : Presently there are two
working pits in Limestone and one working pit in dolomite. The measurements of the pits
are as below;
Limestone : Pit No. 1 - 23 m L x 27 m W x 1.5 m D
Pit No. 2 - 21 m L x 23 m W x 2.0 m D
Dolomite : Pit No.1 : 108 m L x 15 m W x 3.0 m D
It is proposed to carry out mining operations in the working pits. The mining operations will
include removal of overburden, drilling by diesel compressors & jackhammer drill, blasting
and removal of Limestone and Dolomite to the surface screening and sizing. All these
operations are done manually. The drilling is being be done by Jack-hammers.
Regarding the precautions and measures of safety to be taken at the time of blasting, as
stipulated in Metalliferous Mines Regulations 1961, will be strictly adhered to in addition to
this the villages/local people will be suitably advised to take shelter in safety places at the
time of blasting. In addition wet-drilling, that will suppress the dust generation during
drilling and muffled blasting will be practiced. Blasting parameters are finalized by
experimenting and will be implemented in consultation with the concerned Statutory
Authorities.
The Proposed Production Programme: The development consists of removal of an
overburden, which occurs as a capping over Limestone & Dolomite. The details are as under
the figures are rounded off to the nearest zero.
Year Soil m3
In Limestone area In Dolomite area
I 3165 4621.5
II 726.5 1379
III 2107 3360.5
IV 401.5 Nil
V 910.5 1193
Total 7310.5 10554
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
11 M/s Shree Bajrang Sales Pvt. Ltd.
Year wise Production for the ensuring 5 years period;
Limestone
Year ROM m3 ROM T Graded 90% T Reject 10% T
I 16002 40005 36005 4000
II 16002 40005 36005 4000
III 16002 40005 36005 4000
IV 16002 40005 36005 4000
V 16002 40005 36005 4000
Total 80010 200025 180025 20000
Dolomite
Year ROM m3 ROM T Graded 90% T Reject 10% T
I 24000 60000 54000 6000
II 24000 60000 54000 6000
III 24000 60000 54000 6000
IV 24000 60000 54000 6000
V 24000 60000 54000 6000
Total 120000 300000 270000 30000
Summary (Limestone & Dolomite)
Year ROM m3 ROM T Graded 90% T Reject 10% T
I 40002 100005 90005 10000
II 40002 100005 90005 10000
III 40002 100005 90005 10000
IV 40002 100005 90005 10000
V 40002 100005 90005 10000
Total 200010 500025 450025 50000
Out of total production of limestone and dolomite 90% will be readily marketable and about
10% will be mineralized rejects. The estimated production as above is indicative. There are
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
12 M/s Shree Bajrang Sales Pvt. Ltd.
many factors such as chemical composition, impurities present, texture of rock, percentage
recovery of useable ore, market condition etc. the production may vary accordingly.
The mine will be ultimate produce about 0.2 million tonnes of graded limestone per year in
subsequent years. After completion first five years, the balance reserve will be about 12.56-
0.45=12.11 MT (proposed ROM production during this mining plan = 12.56 MT). Hence, the
balance life of the mine production for 0.2 million tonnes of graded limestone will be 12.11 /
0.2 = 60.55 years. After the proposed exploration is completed, the reserve of limestone is
likely to increase, thus, simultaneously life of the mine will also increase.
Final slope angle at the close of the mine: The ultimate pit slope will be about 60° from the
horizontal which is sufficiently stable for limestone bench. However, for OBS bench, the
slope will be of 45°.
Post mining land use pattern: The post mining land use shall be as under :
Post mining land use pattern
Description of Landuse Area (Ha)
Present End of 5 years Conceptual
Pits 0.265 3.567 20.283
Soil dumps Nil 0.0578 2.782
Reject dumps Nil 1.492 1.388
Storage of ore Nil 0.024 0.026
Plantation 25 trees/year Nil 0.112 0.45
Office/ Rest house & Others 0.012 0.014 0.016
Roads Nil 0.43 0.43
Undisturbed area 170.813 165.393 145.715
Total 171.090 171.090 171.090
Ground water: Ground water table is expected to be at more than 20 m depth from surface
level. The deposit is planned to be operated up to a maximum depth of 8 m from surface
level during the mining plan period. Hence, the aforesaid depth of working would not affect
the ground water table.
vi) Raw material along with estimated quantity, likely source marketing area of
final products, mode of transport of raw material and Finished product.
There is no requirement of Raw Material in this project. Mode of transport of extracted
limestone from the mine to cement plant is surface transport by road.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
13 M/s Shree Bajrang Sales Pvt. Ltd.
vii) Resource optimization / recycling and reuse envisaged in the project, if
any, should be briefly outlined.
The mineral rejects will be blended in proportion to maintain the quality of limestone in cement
plant. Entire quantity of the top soil generated during mining will be optimally utilized for
plantation. Rainwater collected in mining pit will be used for dust suppression and plantation
after sedimentation. Use of solar lamps will be also made at office premises and for nearby
villages.
viii) Availability of water its source, Energy / power requirement and source
should be given.
The water requirement of the Limestone project is estimated to be 50 m3/day. 35 m3/day of the
water is required for dust suppression (within the lease and outside the lease in nearby villages),
plantation and dust vehicle washing. 10 m3/day is required for drinking purposes. The water
requirement will be met from bore wells within the mining lease area and rainwater collected in
the pit. Necessary permissions shall be obtained from the competent authorities. The power
requirement will be met from MSEB grid.
ix) Quantity of waste to be generated (liquid and solid) and scheme for their Management
/disposal.
There is no liquid effluent generation from the proposed mine. There will be hardly any waste
rock during the mining. If at all any waste material/rock is encountered during mining upto
ultimate depth, the quantity the same will be negligible. It will be dumped on the non
mineralized area and shall be biologically reclaimed.
x) Schematic representation of the feasibility drawing which give information
of EIA purpose.
The EIA will include an assessment of the potential impacts envisaged as an effect of the project,
during the operation of the mine. The assessment will be based on a consideration of the
individual components of the project.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
14 M/s Shree Bajrang Sales Pvt. Ltd.
4. SITE ANALYSIS
i) Connectivity.
The area is located in the Wani Tahsil of Yavatmal District and is well connected by Wani-Kayar-
Mukutban State Highway. The nearest town Wani lies at a distance of about 20 Km from the
proposed mine.
ii) Land use and Land ownership.
As per the administrative records the Landuse of the Mine is as follows;
Sr. No. Landuse Area (Ha)
1. Private Revenue Land 116.02
2. Government Revenue Land 55.07
Total 171.09
iii) Topography (along with map).
The area prospected is almost flat to slightly undulating topography. In the applied ML area the
highest RL is 228 m and lowest RL is 220 m. The difference in elevation within the area is about 8
m. The Surface plan of the lease area is enclosed as Plate 2.
iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including
area under CRZ), shortest distances from the periphery of the project to periphery of the
forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance
from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette
notification should be given.
Significant features in 10 Km radius (aerial distance) of the project are tabulated below;
Sr. No. FEATURES DETAILS
DISTANCE /DIRECTION
1. River Vidarbh a River
Mukutban tank
3.0 Km /East
6 km / SW
2. Reserved Forest Ruikot RF
Paunar RF
Babapur RF
Chilai RF
3 Km./West
5 Km./NW
4 km/NE
3 km/SE
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
15 M/s Shree Bajrang Sales Pvt. Ltd.
Sr. No. FEATURES DETAILS
DISTANCE /DIRECTION
3. Plantations None -
4. Industries None -
5. Thermal Power Plant None -
6. Mines None -
7. Railway Line Central Rly Majri-Adilabad line
1 km/East
8. Archeological Monument
None -
9. National Park None -
10. Wildlife Sanctuary None -
11. Interstate Boundary None -
v) Existing Infrastructure.
Water supply in most of the villages is available. Latrine facility, Waste Water disposal, garbage
disposal were totally absent. Inter-village transport facility is available only for the selected
villages. While educational facilities & health facilities are not encouraging in most of the
villages. There is well established road connection.
vi) Soil classification.
Soil is the most important feature of physiography, the formation of which largely depends
upon the topography rock types and drainage. The cropping pattern in the area is governed
by the thickness of soil mantle, its texture and constancy. The soils of Wani tehsil are of
various types. Each type covering a well-defined tract which displays cropping pattern of
totally different level.
The soil of the tehsil is well defined and conductive for growing crops of various kinds. The
numerous varieties of soils known by many local names they are grouped under the
following representative classes. The soil conditions along Wani are rich with black regur
loams and clay loams.
.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
16 M/s Shree Bajrang Sales Pvt. Ltd.
vii) Climatic data from secondary sources.
The climate of the area is tropical. The rainfall data has been collected from Yavatmal
Taluka Office. The temperature and humidity has been collected from Yavatmal
Meteorological Station. The climate of this district, which is similar to neighbouring districts
of north Deccan, is characterised by a hot summer and general dryness except during the
southwest monsoon season. The cold season from December to February is followed by the
hot season from March to May. The period from June to September is the southwest
monsoon season and October and November form the post monsoon period.
Rainfall : The average rainfall during 10 year period 1995-2004 was 1,036 mm. Only during
four years rainfall had gone below 1,000 mm. The maximum rainfall was 1,379.8 m during
1995 while minimum was 716.4 mm during 2004. Records of rainfall in the district are
available for 11 stations for the period ranging from 10 to 49 years. The normal annual
rainfall in the district is 1012.1 mm. The rainfall generally increases from the northwest
towards the southeast. Ner, near the northwestern border of the district gets annually 870.3
mm while Panderkawda near the southeast border gets 1145.7 mm. The rainfall during the
southwest monsoon season constitutes about 87% of the annual rainfall, July being the
rainiest month. The variation in the rainfall from year to year is not large. During the fifty
year period, 1941-1990, the highest annual rainfall over the district amounting to 153% of
the normal occurred in 1959. 1972 was the year with the lowest annual rainfall which was
only 64% of the normal. In the same fifty year period rainfall less than 80% of the normal
occurred in 8 years, two of them being consecutive. The annual rainfall in the district was
between 801 and 1300 mm in 37 years out of 50. On an average there are 52 rainy days (i.e.
days with rainfall of 2.5 mm or more) in a year in the district. This number varies from 47
days at Ner to 58 days at Panderkowra. The heaviest rainfall in 24 hours recorded at any
station in the district was 339.0 mm at Panderkowra on 14th September 1959.
Temperature : There are two meteorological observatories in the district, one each at
Yavatmal and Pusad. The description which follows is mainly based on the records of the
observatories in the district. Temperatures rise rapidly after February till May which is the
hottest month of the year. In May the mean daily maximum temperature is about 42.10C
and the mean daily minimum temperature is about 27.7oC. The heat in the summer season
is intense and on some days in May and June the maximum temperatures may rise upto
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
17 M/s Shree Bajrang Sales Pvt. Ltd.
47oC. The afternoon heat is sometimes relieved by thundershowers. With the arrival of the
southwest monsoon by about the middle of June, there is an appreciable drop in day
temperatures and the weather becomes pleasant. After the end of September, when the
southwest monsoon withdraws, the day temperatures increase slightly, but the night
temperatures decrease progressively. After October both day and night temperatures
decrease rapidly. December is usually the coldest month with the mean daily maximum
temperature at about 290C and the mean daily minimum temperature at about 13oC. In
association with the western disturbances which move across north India cold waves affect
the district and the minimum temperature may occasionally go down upto about 3-4oC. The
highest maximum temperature ever recorded at Yavatmal was 46.6oC on 11th May 1988
and 5th June 1995. The lowest minimum temperature ever recorded was 3.0oC on 30th
January 1980. The highest maximum temperature ever recorded at Pusad was 49.9oC on 8th
April 1990 and the lowest minimum temperature was 4.2oC on 4th January 1991.
Humidity : Except during the southwest monsoon season when the humidity is
high (70- 80%) the air is generally dry. The summer months are the driest, with the relative
humidity in the afternoons being about 20%.
Wind Velocities and Wind Direction: Winds are generally light to moderate with some
strengthening during the period May to August. In the post-monsoon and cold seasons the
winds generally blow from east or northeast.
viii) Social Infrastructure available.
Education : Education is a basic requirement for every human being. The governments
should utilize its entire recourses irrational manner to encourage people to become literate
to some extent since educated persons are assets ho help in proper development of the
country. In the Wani Tehsil, there are number of primary, middle and Higher secondary
school and colleges.
Hospital : There are number of Hospital, dispensaries, primary health centre and Sub
primary health centre available in that tehsil.
Transport : The transport facilities in the tehsil are well developed and wide spread. State or
national highway link most of the urban areas.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
18 M/s Shree Bajrang Sales Pvt. Ltd.
Communication : Communication facilities go a long way in information collection and its
dissemination in an effective and speedy manner. In the modern society, the roll of the
facilities in the socioeconomic development of the society is very well recognized.
Communication facility help in the flow of information from one place to another in shortest
time, thus helping administration and corporate managers to take crucial decisions relating
to daily functioning of administration and business dealings in shortest possible time. The
importance of developed communication network for the common men judged from the
fact that in rural areas. All communication facility like as phone, fax, printer, scanner,
computer etc are available in Wani tehsil.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
19 M/s Shree Bajrang Sales Pvt. Ltd.
5. PLANNING BRIEF
i) Planning Concept (type of Industries, facilities, transportation etc) Town and country planning/ Development authority Classification.
The mining will be carried out as per the approved mining plan. During Mining Plan period, the
mining operation will be done by development of mechanized opencast method. The statutory
provisions for the development of mine shall be followed to ensure safe mining practices and
conservation of mineral. During the course of mining protection and conservation of natural
resources and protection of environment will be ensured. The Environment Management Plan in
brief is described at Annexure II.
ii) Population Projection.
The details of population in the nearby villages is given at Annexure III.
iii) Land use planning (breakup along with green belt etc.).
Description of Landuse Area (Ha)
Present End of 5 years Conceptual
Pits 0.265 3.567 20.283
Soil dumps 0.0578 2.782
Reject dumps 1.492 1.388
Storage of ore 0.024 0.026
Plantation 25 trees/year 0.112 0.45
Office/ Rest house & Others
0.012 0.014 0.016
Roads 0.43 0.43
Undisturbed area 170.813 165.393 145.715
Total 171.090 171.090 171.090
iv) Assessment of Infrastructure Demand (physical & social).
The proposed mining will require roads for the transport of the mineral besides it will require
manpower to operate the proposed mine.
v) Amenities/Facilities. These include community toilets, drinking water facilities like public stand posts.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
20 M/s Shree Bajrang Sales Pvt. Ltd.
6. PROPOSED INFRASTRUCTURE
i) Industrial area (processing area). No processing of manganese is proposed.
ii) Residential Area (Non processing Area).
None
iii) Green Belt.
0.45 ha of the lease area is proposed for plantation.
iv) Social Infrastructure.
Under Corporate Social Responsibility (CSR) the felt needs of the nearby villages will be
identified and accordingly social infrastructures will be developed.
v) Connectivity (Traffic and Transportation Road/Rail/Metro/Water ways etc.)
Well established
vi) Drinking Water management (Source & Supply of water)
Drinking water for the workers will be met from the borewell within the mining lease. Drinking
water arrangement for the nearby villages under Corporate Social Responsibility (CSR) will be
also made.
vii) Sewerage System. None proposed
viii) Industrial Waste Management. Not required
ix) Solid Waste Management. None
x) Power Requirement & Supply / Source.
Through MP SEB grid
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
21 M/s Shree Bajrang Sales Pvt. Ltd.
7. REHABILITATION AND RESETTLEMENT (R & R ) PLAN
i) Policy to be adopted (central/state) in respect of the project affected person including
home oustees, land oustees and landless laborers (a brief outline to be given.)
Not Applicable
8. PROJECT SCHEDULE & COST ESTIMATES
The capital budget for environmental protection measure is estimated to be 20 lakhs while the
recurring budget is estimated to be 10 lakhs.
i) Likely date of start of construction and likely date of completion (Time schedule for the project to be given.)
The mining operations shall be carried out after obtaining all statutory permissions and shall be
carried out as per approved mining plan.
ii) Estimated project cost along with analysis in terms of economic viability of the project.
Rs. 112 lakhs The cost analysis in terms of economic viability of the project is presented at
Annexure IV.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
22 M/s Shree Bajrang Sales Pvt. Ltd.
9. ANALYSIS OF PROPOSAL FINAL RECOMMENDATIONS)
i) Financial and social benefits with special emphasis on the benefit to the local people
including tribal population, if any, in the area.
The liberalization of the Indian economy has catapulted the Indian industry into new realms of
development through global thinking and related progress. The policies of Government on
economic development have given various subsidies like slashing import duties and provisions for
the Indian industry to grow indigenously, also there are clearly spelled guidelines for environmental
management. The project under consideration aims to contribute in the national objective of
economy and ecology developing hand in hand. The region, where the project is situated is mostly
dependant on agriculture forest and mineral resources where limestone has a major share. The
development of mining in the area is directly and indirectly going to contribute in increasing
employment, infrastructure, communication, and socioeconomic infrastructure. It is proposed to
employ the local population wherever possible in the proposed project activities directly or
indirectly. The proposed limestone mine would naturally have implications on the neighborhood
with reference to socio-economic aspects of society, environmental attributes such as land, water,
air, aesthetics, flora and fauna. In assessing the environmental impact, collection, collation and
interpretation of baseline data is of prime importance. Environmental impact analysis and
assessment, which is required for every industrial project, should preferably be carried out at the
planning stage itself.
In compliance with the environmental procedure the environmental clearance application is made.
Necessary scientific studies will be undertaken as per the guidelines set by the Ministry of
Environment and Forests (MoEF) and prescribed Terms of Reference. The
suggestions/recommendations of all the experts, competent authorities, and government officials
are being sought for the impacts of the proposed project. Views and guidance of the local residents,
community based organizations, social organizations are extremely important in order to devise a
full proof Environment Management Plan for the proposed mining project and also mitigate the
damages caused due to the project. Allocation of necessary funds, manpower and machinery will be
made to for the protection and conservation of all the components of environment. It is ensured
that all mandatory clearances will be sought from respective competent authorities before
operating the proposed Limestone Mine (171.09 Ha).
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
23 M/s Shree Bajrang Sales Pvt. Ltd.
Annexure I
APPROVAL LETTER FROM IBM FOR MINING PLAN
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
25 M/s Shree Bajrang Sales Pvt. Ltd.
Annexure II
ENVIRONMENT MANAGEMENT PLAN
1.1 For Water Environment
Surface water is in the form of seasonal rain fall. It takes normal course and flows out of the
area along natural slope. No impact on surface or ground water is expected as no chemical
processing is involved.
1.2 For Air Environment
The proposed mining operations are mechanized and shall be done through deployment of
mining machineries. The dust from the haul roads and drilling is expected to pollute the air to
some extent. However, considering the production and nature of proposed mining operations
SPM level will not be more than the permissible limit.
However, on the haulage road water will be sprinkled to minimize the raising of dust in the area.
Further, for minimizing dust generation during drilling & blasting and loading following
measures are proposed:
Wet drilling of blast holes
Muckpile will be wetted before loading.
The drillers will be given protective appliances to be used during drilling operations.
1.3 For Noise Environment :
Noise Level is likely to increase due to movement of machineries, drilling, etc. The measures will
be taken to maintain the noise levels within limits. Periodical maintenance of equipment will be
carried out. Moreover, the building of green belt that would be continued along lease boundary,
dumping yards, haulage roads will help in restricting noise level. Noise due to blasting is
controlled by using NONEL.
1.4 For reducing ground vibrations :
Ground vibrations caused by blasting will be monitored in order to know their degree and to
build safe guards. The ground vibrations would be mainly at the point of blasting and further
away the vibrations will decrease and becomes imperceptible.
To reduce the ground vibrations multi-row blasting will be adopted and charge per delay to be
kept within limit. Blasting shall be carried out by using NONEL detonators, which controls air last
and ground vibration effectively.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
26 M/s Shree Bajrang Sales Pvt. Ltd.
Blasting will be done preferably in the afternoon. This will minimize vibration due to blasting and
check noise pollution. Ground Vibration monitoring will be done regularly.
1.5 Stabilization of Overburden Dumps :
The stabilizations of dumps will be undertaken by means of terracing of dumps wherever
necessary.
The dumps will be pitched from the slope side to a suitable height. Further, suitable vegetation /
grass shall be planted on the dumps for making it biologically stable.
1.7 For Socio -Economic Environment
The proposed mining activity is expected to have a positive impact on the socio-demographic
profile of the area. The local people shall get opportunities of employment in the unskilled semi-
skilled category. The overall standard of living in the area is expected to improve due to coming
Limestone Mining Project.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
27 M/s Shree Bajrang Sales Pvt. Ltd.
Annexure III
HUMAN SETTLEMENTS WITHIN BUFFER ZONE
Sr. No.
Village HH
POPULATION SC ST LITERATES
TOTAL M F M F M F M F
1 Chinchghat 96 436 219 217 0 0 69 57 154 93
2 Dara 127 532 264 268 35 35 74 82 223 174
3 Bopapur 180 767 381 386 23 22 254 256 294 222
4 Pawanar 115 549 293 256 17 11 158 134 226 167
5 Sindhi Wadhona 225 986 499 487 31 33 33 34 369 284
6 Dongargaon 171 759 385 374 27 19 128 116 265 185
7 Ganeshpur Kh 36 146 75 71 0 0 41 40 50 39
8 Kosara 246 1086 570 516 12 8 68 64 411 261
9 Ganeshpur Bk. 98 455 234 221 9 5 54 40 172 112
10 Khadaki 201 803 397 406 8 6 113 117 284 207
11 Bhendala 216 928 464 464 8 6 126 119 324 235
12 Mukutban 1225 5990 3132 2858 245 244 585 593 2137 1448
13 Adegaon 722 3259 1657 1602 79 75 149 146 1249 964
14 Sakhara 438 2049 1029 1020 92 77 217 216 734 531
15 Godgaon 113 495 239 256 0 0 51 58 167 133
16 Mahankalpur 107 499 256 243 0 0 54 61 172 117
17 Kayar 593 2499 1258 1241 98 96 414 421 852 609
18 Patharpur 135 696 362 334 0 0 64 64 251 199
19 Nerad 298 1226 618 608 92 93 111 123 445 327
20 Purad 300 1232 656 576 196 169 72 68 479 303
21 Kundra 175 699 352 347 8 4 145 144 254 170
22 Hiwardhara 159 533 294 239 4 0 213 169 122 42
23 Chilai 118 454 224 230 6 5 68 71 161 114
24 Krishnanpur 215 955 454 501 6 5 40 51 311 241
25 Dhunki 116 440 212 228 11 14 159 175 158 99
26 Pimpri 236 1056 539 517 6 4 123 126 348 292
27 Wadjapur 127 526 269 257 10 13 112 106 172 128
28 Wadhona Pilki 93 355 190 165 0 0 27 27 141 90
29 Mohada 468 1892 987 905 50 48 416 365 595 413
30 Deurwada 43 196 103 93 0 0 13 14 79 39
31 Nimbala Bk. 125 599 317 282 0 0 33 28 213 135
32 Tejapur 421 1730 855 875 71 64 35 48 587 469
33 Amlon 95 432 226 206 5 5 63 58 154 105
34 Gadeghat 50 234 121 113 10 8 0 0 78 53
35 Tulsi 52 266 128 138 0 0 68 78 69 57
36 Tambadi 127 581 303 278 74 55 75 76 212 144
37 Gandhinagar 151 691 352 339 19 16 26 23 220 148
38 Kodsi Kh. 190 848 431 417 16 14 37 54 344 246
Total 8603 37879 19345 18534 1268 1154 4488 4422 13476 9595
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
28 M/s Shree Bajrang Sales Pvt. Ltd.
Annexure IV
ESTIMATED PROJECT CAPITAL COST & PRODUCTION COST
1. Project Capital Cost
The total project cost for Limestone Mining Project has been estimated at Rs. 112 Lakhs. The
break-up of the total estimated capital cost for the project is presented in following table:
Sr. No.
Investment Head Estimated Capital Investment Rs.
1 Office, Rest Shelter, Store & Guard room 510000
2 Plant Machineries (Compressor with jackhammer, Portable explosive magazine 100 kg capacity, 10 HP Diesel water pump, Explorer)
1700000
3 Tractor trolley with 5 ton capacity 1300000
4 Electrical, electricity supply charges and other utilities 450000
5 Preliminary and pre-operative 650000
6 Furniture & Fixture 150000
Sub Total (Fixed Assets) 4760000
7 Environmental management cost (capital +recurring) 3000000
8 Working capital Margin 3500000
Total Project Cost 11260000
Buildings & Structures : This cost includes cost of office & other service buildings. The cost is on
the basis of standard structures that are likely to be constructed. The prevailing rates have been
taken. The cost estimated under this head is Rs. 5.1 Lakhs.
Plant Machinery : Plant machinery consisting Compressor with jackhammer, Portable
explosive magazine 100 kg capacity etc may be required to be procured by the company. The
capital cost for machinery has been estimated at Rs. 17.5 Lakhs.
Office Furniture, Fixtures : The cost of the Furniture & Fixtures and Office Equipment has been
estimated from the available information. The total capital cost estimated under these heads is
Rs. 1.5 Lakhs.
Transport Vehicles: This is the expenditure on the transportation vehicle Tractor trolley 5
tonnes capacity. The cost towards this expenditure is estimated as Rs. 1.3 Lakhs.
Prefeasibility Report : Hiwardara Limestone & Dolomite Mine
29 M/s Shree Bajrang Sales Pvt. Ltd.
Working capital Margin : This is the expenditure on the operation of machinery, salary, power
supply etc as well as the contractual cost for OB removal & other works. The cost towards
Working capital is estimated as Rs. 35.00 Lakhs.
Quality Control & Environment Protection Cost : This includes expenses towards establishment
of site laboratory for quality control during operation of the mine. Expenses towards
procurement of the laboratory equipment, equipment for monitoring air, noise and water
environment etc are included in this cost. The capital cost towards this head has been estimated
at Rs. 20 Lakhs and recurring cost estimated as 10 lakhs.
Thus, the basic Project Cost has been estimated as Rs. 47.6 Lakhs. Considering the provision for
Working capital Margin During Construction is Rs. 35.00 lakhs, the environment protection
cost extimated as 30 lakhs, the total cost of the proposed Limestone /Dolomite Mining Project
has been estimated as Rs 112 Lakhs.
The cost of the land is not included as dependent at the time of purchased
2. Production Cost
The Proposed Limestone/Dolomite Mining Project has been planned with capacity of 0.2 million
tonnes per annum. The production of limestone will be by open cast semi-mechanized method
by using excavator, jackhammers drills, tractor trolley, etc. all these operations are done
manually. The cost of production for limestone /dolomite mining per tone is estimated as under:
Sr. No.
Item Amount Rs.
1 Mining 35
2 Overhead cost 20
3 Depreciation 01
4 Interest 10
5 Royalty 63
6 Taxes 04
7 Other expense 05
Total Production Cost per tonne Rs. 138