Founded in 1963
More than a thousand direct jobs at six industrial divisions, administrative offices and regional commercial management offices
Consolidated industrial base focusing on construction and sustainable business
Domestic market
Presence at 8 thousand points of sale and job sites all across Brazil
11 million square meters of land bank
50 YEARS MAKING LIFE EASIERFOR PEOPLE WHO BUILD.
Mortar
Roofing
Precon Block
Porcelanato Porcelain Tile
ConcretePrecast
Warehouse Development
Real EstateDevelopment
Steel Frame Cutting, Bending
and Assembly
High Tech Industries
Distribution Centers
Shopping Malls
Education
Habitation
Two new units in 2012:
Facility of precast structures and housing units.
Facility of PVC roof tiles.
Facility of mortar.
PRESENCEIN BRAZIL
Pedro Leopoldo Division – MGPrecon Engineering and Industrial
Nova Iguaçu Division – RJPrecon Industrial
Belo Horizonte Division – MG
Precon Industrial
Precon Estiraço Belo Horizonte - MG
Formosa Division – GOPrecon Industrial
Arcellor Mittal accredited at Minas Gerais for steel frame cutting, bending and assembly
SOLUTIONS ON STEEL TO STRUCTURE ALL SIZES WORKS WITH GREATER QUALITY,
PRODUCTIVITY AND ECONOMY.
11 MILLION sqm AROUND THE CONFINS AIRPORTConfins Airport
PRECON ENGINEERING WAS BORN FROM THE TRADITION OF PRECON GROUP AND IT BRINGS IN ITS DNA INDUSTRIALIZATION AND
SUSTAINABILITY.
THE COMPANY OPERATES IN THREE AREAS:
Concrete Precast
Structures
Warehouse Development
Real EstateDevelopment
Making easier the life of the builder
Fulfilling the dream of owning a house in half the time.
Large contracts assuring profitability.
BUILT TO SUITDEVELOPMENTBUILT TO ORDER
PRECAST STRUTCURES
PRECAST STRUTCURES
BUILT TO SUITDEVELOPMENTBUILT TO ORDER
REAL ESTATE DEVELOPMENT
Desire of Precon to build a product targeted towards housing segment
Housing deficit of Brazil
Case Fundação Dom Cabral
1st company of Brazil to have an enterprise of the program Minha Casa Minha Vida (MCMV) certified by the sustainable seal Selo Azul de Sustentabilidade da Caixa Econômica Federal
DATEC20 yearsof R&D
The Precon Housing Solution is born
THE STANDARDIZATION OF THE PROJECTS IN A SINGLE PLAN AND
A SINGLE PRODUCT BROUGHT SCALE AND THE BENEFITS OF SERIAL PRODUCTION IN OUR
INDUSTRIAL DIVISION
STANDARDIZATION OF THE PLAN / RMBH
AUTOMAKER CONCEPT
According to the characteristic of each land the preparation is done and the foundation is
deployed.
LAND PREPARATION AND FOUNDATION
CONCRETE POURING OF STRUCTURE
Preparation of molds, placement of frame and concrete, and de-forms of beams, columns and
preslab.
STRUCTURE TRANSPORTATION
Transportation of the structure from the facility to the work site.
MANUFACTURE OF PRECAST PANELS
Technology to manufacture clay brick panels with lining concrete or mortar, with embedded frames and
installations.
TRANSPORTATION OF PANELS
Transportation of panels from the facility to the work site.
ASSEMBLY OF STRUCTURE AND PANELS
Quick assembly of structure and precast panels at works. Precon technology on the
connections.
ASSEMBLY OF KITS
Preparation at the distribution center of electric, hydraulic and finishing sets for the
work.
DELIVERY OF KITS
Programmed logistic of kits between the distribution center and the work site.
ASSEMBLY OF KITS AND FINISHINGS
Assembly of kits with predefined processes at the work site and execution of finishing (flooring, painting and bathroom ware).
1st Product
Exceptional localization
2 bedrooms apartment,Nearly 47 sqm,
Parking space and leisure area.
THE WORK: QUICKLY ASSEMBLY
Columns – 2 days
1 2
1st floor – 5 days
3
2nd floor – 5 days
4
3rd floor – 5 days
5
4th floor – 5 days
6
Platbands – 1 day
16 apartments built on 23 days
The work: Reduced Crew
We use 20% of the traditional labor amount in a work site
WASTE GENERATION
Brazilian construction index PRECON Engineering index
Reduction of 81% of waste generation in comparison with the Brazilian reference for conventional
construction.
Reduction of nearly 6 tons of waste generated per apartment built with Precon Engineering method.
STRUCTURAL SAFETY
The concrete structure of the building and walls without structural function are an extra safety item to clients, once the removal of walls, partial or total, do not affect the performance of the concrete structure.
SUSTAINABILITY
Conservation of Material Resources
Social Practices
Project and Comfort
Urban Quality and Neighborhood
Energetic Efficiency
DATEC
Precon Engineering is the first company of Brazil to have an enterprise of the program Minha Casa Minha Vida (MCMV) certified by the sustainable seal Selo Azul de Sustentabilidade da Caixa Econômica Federal – Ville Barcelona, at the city of Betim.
“Innovation, Industrialization and Sustainability:
The Precon Housing Solution”