Upload
uttam-kumar-sinha
View
217
Download
0
Embed Size (px)
Citation preview
8/10/2019 Pre_commissioning_test_of_IBS_II_at_CH_12.doc
1/2
Pre commissioning Test of IBS II at CH 12.230 between Unloading cabin and
Central Block Station.
T U!"#$I!% &'$
1) Advance starter Signal No. S 23 tested from unloading panel with track circuit 23T, !A"#$%
&A'(*S) A+t #%) and 3-T of *S. "orrespondence of Signal oth /N and /00 aspects wereverified from panel and site found ok. The signal going to danger if an of the aove track circuit
fail i.e. as soon as the train passes the signal. The signal can e relowered onl when the train
clears 23T, !A"#$% &A'(*S) A+t and -T of *S.
2) $S *S Signal tested from $nloading cain panel with track circuit 3-T, !A"#*S"S)A+t
#%) and 1T of "S. "orrespondence of Signal oth /N and /00 aspects were verified from
panel and site found ok. The signal can e relowered onl when the train clears 3-T, !A"#*S
"S)A+t #%)and 1T of "S.
T C(!T'" B"#C) STTI#!
3) Advance starter Signal No. S of "S tested from "S panel with track circuit T, !A"
#"S*S) A+t %% and 2T of *S. "orrespondence of Signal oth /N and /00 aspects were
verified from panel and site found ok. The signal going to danger as soon as the train passes the
signal. The signal can e relowered onl when the train clears T, !A" #"S*S) A+t %%
and 2T of *S.
) "S*S Signal at *S tested from panel of "S cain with track circuit 2T, !A" *S$%
&A'( A+t #%%) and 2T of $nloading. "orrespondence of Signal oth /N and /00 aspects were
verified from panel and site found ok. The signal can e relowered onl when the train clears 2T,
!A" *S$%&A'( A+t #%%) and 2T of $nloading.
T IBS
) *S Signal No. S3- for % and *S Signal No 2 for %% checked for their correspondence from
panels the working found satisfactor.
4) Track circuit 3-T of % and 2T of %% checked for their parameters and the same found
responding to 5. ohms resistance.
6) 0ield e7uipment of the A+le counters for oth mpt line and %oad line found properl housed
on the rails and there parameters found within range.
8) *!S and atteries checked and found working satisfactor.
NT!" #/9:); S*!AT NT!"#'"T*/N);S*!AT '*TS %T(.
NA:
8/10/2019 Pre_commissioning_test_of_IBS_II_at_CH_12.doc
2/2
C#**ISSI#!I!% #+ IBS II B(T,((! U!"#$I!% !$
C(!T'" B"#C) STTI#!.
T? @/' /0 *S ** T@N $N%/A(*N> AN( "NT'A% %/" STAT*/N *S
"/:!%T( *N A%% 'S!"T AN( T? SA: *S TST( B/*NT%& @*T? :;S NT!" S*!AT,
T? S&ST: *S SA0 0/' N/':A% @/'*N> /0 'A :/C:NT.
T?*S S&ST: /0 *S ** *S "/::*SS*/N( /N ============ 0*'ST 'A @*T?
N>*N N$:' ============ !ASS( /N !'/!' S*>NA% AT ============== ?'S.
A%% ('*C'S AN( ASS*STANT ('*C'S T/ /S'C S*>NA% AT *S **
"A$T*/N /'(' T/ *SS$( T/ A%% 'A :/C:NTS 0/' A !'*/( /0 15 (A&S.
NT!" #/9:); S*!AT NT!"#'"T*/N);S*!AT '*TS %T(.
NA: