43
Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Embed Size (px)

Citation preview

Page 1: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor at Oberto Brands

1:00 – 2:30 @ Atlantic

1

Page 2: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Speakers• Eric Kapinos• Gregory Quinn

2

Page 3: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Agenda

• Customer Success Story: Oberto Sausage Company

• Other Success Stories• Preactor and QAD Relationship• Market Challenges• APS Solution Overview• APS Solution Value• Questions & Answers

Page 4: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Success Story:Oberto Brands

Preactor for QAD

Page 5: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor® at

Oberto Brands®

Page 6: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

About Oberto Brands• Brand names include

– Oberto– Lowrey’s – Pacific Gold– Smokecraft Offer a complete portfolio of meat snack (jerky, sausage sticks etc.),

refrigerated sausage and deli products• Family owned business in operation for over 90 years

– Headquartered in Kent, WA• National distribution in all classes of trade• Distribution by distributors and direct shipment to customer• Growing international business

Page 7: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Why Finite Capacity Scheduling?• Large and diverse product base– Over 400 products– Complex manufacturing processes– Freshness is a concern– Potential for efficiency gains with adequate

scheduling model

• QAD ERP did not offer constrained planning useable in Oberto’s repetitive environment – 5 year experience with QAD concluded Oberto’s

needs exceeded software capability

Page 8: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Why Preactor?• P400 APS offered superior value proposition to

alternatives in QAD space– Richest feature set– Least costly– True finite capacity scheduling

• Superior flexibility– Could evolve the scheduling model as needs change

• No change in Preactor code– Tailor the data used

• Large install base, specifically in food processing• Best schedule visualization• In-depth technical support throughout the Preactor

reseller network• Significant reduction in outside consulting costs

Page 9: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Integration to QAD

• Manufacturing orders and product attributes (e.g. allergens) imported from QAD

• Oberto staff developed their own integration to QAD due to heavily customized install– Internally deployed most Preactor functionality

• Maintain product and resource definitions in Preactor– Resident QAD data does not support the

scheduling goals within Preactor

Page 10: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Results• In operation for over two years– Preceded by a 6 month pilot program

• Schedulers elevated from busy work and data management to “real” production scheduling

• 40% reduced work-in-process– Largely due to the bucketless scheduling in Preactor– Not present in the alternative products

• Upgraded to P500 APS– Use the PBX (Preactor BoM Exploder)

Page 11: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Future Plans for Preactor at Oberto• Implement RCCP model to support S&OP process• Drive Preator models even further into product routings and

bills• Implement real-time shop floor feedback and rescheduling

Page 12: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

More Success Stories

Preactor for QAD

Page 13: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Case study – Boots Contract Manufacturing (CPG)

High Street Pharmacy making their own products as well as suppliers to other companies.

Cosmetics and Medicines. QAD ERP and Preactor

implemented at 10 sites.

Key Benefits Schedules production taking into

account equipment and labor. Reduced changeover time. Increased Efficiency.

Page 14: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Case study – Vector LLC (Electronics)

Amplifiers and optical nodes for cable and radio networks, telemetry devices as well as a wide range of services like design, implementation, training and maintenance of systems.

400 people. QAD ERP.

Key Benefits Can now generate real and feasible

schedules. Reduced lead times by 50%. On-time delivery performance up from

40% to 80%.

Page 15: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Case study – Hall & Woodhouse (Beverage)

Bottling, canning and contract packing.

Flavoured waters, spirits, spirit mixers, soft drinks, alcopops, beers, and ciders.

Key issues were Changeover Times between pack size, and Cleaning regimes required for vessels.

QAD ERP.

Key Benefits No longer dependent on manual

system. Sequence dependent production

hold-ups highlighted. Deals with shelf-life issues.

Page 16: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

• Make to specification of container glass moulding machines, moulds, packaging lines, bench-top hydraulic presses, stirrers for molten glass, annealing ovens, cold-end handling and inspection systems, and mould pre-heat chamber ovens.

• Complex manufacturing and assembly across multiple shops or departments.

• QAD Enterprise Applications ERP system.

Case study – Sklostroj Turnov (Discrete Manufacturing)

Benefits Planning time cut from days to minutes. Can see the scheduled completion time of

assemblies and entire order.

Page 17: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

• Manufacture various grades of science grade papers and slit to customers requirements.

• Existing planning software could not provide the detail required to manage the plant and staff requirements in the short and long term.

• QAD ERP.

Case study – Whatman International

Benefits Improved customer service. More efficient production. Can now plan months ahead.

Page 18: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor and QAD Relationship

Preactor for QAD

Page 19: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor International and QAD

• Preactor has been used by QAD ERP users for many years.• More than 100 companies around the world.• Preactor is a QAD Solution Partner.

Page 20: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

• QAD has two options planning and scheduling -– Traditional MRP– QPS

• Preactor for QAD is used for more complex scheduling applications - – Complex constraints.– Sequence dependent changeover times.– Optimization rules.– Links together dependent orders based on Bill of Materials.

QAD Planning and Scheduling Options

Page 21: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Market ChallengesPreactor for QAD

Page 22: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Supplier Challenges• Global competition is forcing companies to re-assess their

position in the market.

• There is pressure to compete on agility, quick turn round and on-time delivery.

• But also to reduce costs and lower inventory levels.

• These pressures lead to smaller batch sizes - ‘sequencing’ becomes increasingly important.

• And then to synchronize variable demand with materials flow and capacity.

Page 23: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Demand Driven Manufacturing• Recommended by many experts and analysts in the manufacturing sector

as the way forward for many companies -– Move away from large batch (Economic Batch Quantity, EBQ) make

to stock.– Move towards small batch make to order.

• The goals are to -– increase On-Time Delivery (OTD), – reduce stock, (Finished Goods Inventory, FGI)– reduce throughput time (Lead Time).

• Recent world-wide survey done by Aberdeen Group analysed how well companies are performing in each of these goals.

Page 24: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Definition of Class

Mean Class Performance

Best-in-Class: Top 20% of aggregate performance score

97% On Time Delivery (OTD) 4 Days Finished Goods Inventory (FGI) 9 Days Lead Time

Industry Average:

Middle 50% of aggregate performance scorer

87% On Time Delivery (OTD) 14 Days Finished Goods Inventory (FGI) 33 Days Lead Time

Laggard: Bottom 30% of aggregate performance score

75% On Time Delivery (OTD) 32 Days Finished Goods Inventory (FGI) 75 Days Lead Time

Defining Best-in-Class Performance

Source: Aberdeen Group

Page 25: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Best in Class Manufacturers Combine IT Packages

57%

25%

95%95%

50%60%

0%

25%

50%

75%

100%

ERP & APS MES &APS

Industry Average LaggardBest-in-Class

Source: Aberdeen Group

Page 26: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

• Techniques that deal with analysis and planning of logistics and manufacturing during short, intermediate, and long-term periods. Characterized by:– Software using advanced mathematics or logic– Optimization or simulation– Consider a range of constraints and business rules to provide real-time planning

and scheduling, decision support, ATP and CTP– Generate and evaluate multiple scenarios

Excerpted from APICS Dictionary 12th Edition(2008)

What is APS?

Page 27: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Planning• What to make• When to make it• How much to make• Where to make it• Materials Required• Resources Required

Scheduling• How best to make it

– Execute against plan

• Sequencing• Synchronization• Priorities, constraints and

conflicts• Monitoring execution• Managing change

How Much or How Best?

Page 28: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

• Planning systems are ‘bucketed’ (monthly, weekly, daily) and cannot preserve operational sequences within the time bucket.

• True scheduling systems are bucketless, preserving sequencing and capable of producing work-to or dispatch lists for each resource.

How do you recognize the difference?

Page 29: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

• Planning systems do not provide the ability to model complex constraints of a real system.

• Planning systems do not give you real time control over individual resources and individual orders.

• True scheduling systems do provide real-time control at shop floor level with models that reflect the real operating constraints.

Why should I worry?

Page 30: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

LESS FIRE-FIGHTING !!LESS FIRE-FIGHTING !!

How will APS Help?

Operations are planned only when resources are available.

Materials are ordered for delivery when operations can start.

Provides visibility - deliveries can be predicted with more confidence.

Page 31: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Solution OverviewPreactor for QAD

Page 32: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

• Proven decision support tool for detailed sequencing.• Takes the orders with associated operation steps that require one

or more (finite) resources to be carried out.• Resources defined such as machines, process lines, operators,

tools, tanks, etc.• Sequences the operations to produce a ‘good’, achievable schedule

and generates work-to lists for each resource.• Provides a ‘what if?’ environment for the planner to ‘see’ the

impact of the options before decisions are made.

Preactor for QAD is APS

Page 33: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor for QAD - Overview• This provides the planner with a

complete picture of -– Demand.– Capacity.– Resource usage.– Operation sequence.– Expected completion time for each

operation in a Gantt chart. • The planner can drag and drop

operations, change priorities and manipulate the schedule in whichever way needed to meet business objectives.

• Then see the impact on all orders before committing changes back to QAD.

33

Page 34: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor for QAD - Overview• Forward, Backward or Bi-directional

loading of operations onto resources.• Additional Optimization rules to

introduce preferred sequencing, minimizing changeovers, campaigning etc

• Multiple constraints for each operational step such as machines, staff, tools, tanks, processing lines etc

• Rule based pegging of dependent orders which can be purchase orders, sales orders and manufacturing orders

34

Page 35: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor for QAD - Overview

• Drag and Drop interaction with the schedule through the interactive Gantt Chart

• Ad-hoc capable to promise• Shift Pattern templates, breakdowns,

overtime etc• Schedule Analysis tools to compare

alternative schedules

35

Page 36: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor for QAD - Overview• Provides QAD’s materials planning system

(MRP) and customer service available to promise with an accurate and obtainable production schedule.

• Procurement is then tasked with supporting the production plan by committing to the existing purchase orders found in QAD and considered by the Preactor planning system and generating any new purchase required by the updated production plan.

• Customer Service is also given the ability to sell product based on a realistic and obtainable production plan visible through standard QAD master schedule reports.

36

Page 37: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Preactor for QAD Solution

• Includes – Preactor 400 APS Master Scheduling System.– Integration piece for connection to QAD Enterprise

Applications® Standard Edition (SE) and Enterprise Edition (EE).

• Integration will also work with eB, eB2, eB2.1 and for earlier versions of MFG/PRO® as well.

Page 38: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

International Support• Preactor for QAD is available worldwide

through accredited system implementers.• Available to provide customization, training and

go live support services.• Local language.

Page 39: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Solution ValuePreactor for QAD

Page 40: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

• Interactive decision support tool for companies to become leaner and more agile.

• Quantitative benefits – based on more than 150 documented case studies:-– Reduce raw material inventory by 50%– Increase productivity by 25%– Reduce work-in-process by 50%– Improve delivery performance by 80%– Reduce scheduling overhead by 80%

• Works well in discrete, process, hybrid and repetitive environments.

Opportunities with Preactor for QAD

Page 41: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Key Differentiators of Preactor for QAD

• Best-in-Breed solution – more than 2,500 companies use Preactor located in 65 countries.

• Proven in almost every sector of manufacturing.

• Built-in integration to QAD EA providing two way data flow for close synchronization.

• Can cope with even the most complex of planning and scheduling application.

• Local resellers available worldwide for implementation and support.

Page 42: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

42

For More Information North America

Greg Quinn 814.880.1642 [email protected]

EMEA Valerie Goulevitch +33 6 1322 5136 [email protected]

Elsewhere Mike Novels +44 1249 650316 [email protected]

Page 43: Preactor at Oberto Brands 1:00 – 2:30 @ Atlantic 1

Questions and Answers

Thank You