28
 Pre-Post Analysis Report Gauging Office STRP Swap Project Author: Asfand Tariq Date: 01-12- 20 11 Version: OPT-1.2/DT/ PTCL HQ/ 2 4-09-2010 Status: Sec . Class: Internal – Dri ve Test Repo rt © Copyright 2010 PTCL - All rights reserved. No part of this work, which is protected by copyright, may be reproduced in any form or by any means - graphic, electronic or mechanical, including photocopying, recording, taping or storage in an information retrieval system – without the written permission of the copyright owner.

Pre- Post Analysis Report of Gauging Office

Embed Size (px)

Citation preview

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 1/28

 

Pre-Post Analysis Report

Gauging OfficeSTRP SwapProject

Author: Asfand TariqDate: 01-12-2011Version: OPT-1.2/DT/ PTCL HQ/ 24-09-2010Status:

Sec. Class: Internal – Drive Test Report

© Copyright 2010 PTCL - All rights reserved. No part of this work, which is protected by copyright, may be reproduced in any form or by any means - graphic, electronic or mechanical, including photocopying, recording, taping or storage in an information retrievalsystem – without the written permission of the copyright owner.

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 2/28

 

Internal-Drive Test Report

Contents

Pre-Post Analysis Report ........................................................................................................11 Document Control.................................................................................................................. 3

1.1 Document Management History ......................................................................................31.2 Reviewers ........................................................................................................................3

2 Executive Summary [Editable]............................................................................................... 42.1 Objective ..........................................................................................................................4

Single Site Drive Test will be conducted as per the Scope of Work ........................42.2 BTS Audit Info Pre - DT ..................................................................................................42.3 BTS Audit Info Post - DT .................................................................................................4

3 Drive Test Results Summary ..................................................................................................43.1 Site Health related Information ........................................................................................4

3.2 DT Map with Topography, Alarms and BTS Data ............................................................5.......................................................................................................................................... 53.3 Number of Active Subscribers at the time of DT ..............................................................5

Author: Asfand Tariq Drive Test Report TemplatePage 27 of ................................................................................................................................2

3.4 Call Log Summary Table (Pre – DT) ...............................................................................63.4.1 CDMA 1 x Voice Call Event Statistics .......................................................................63.4.2 CDMA 1x Handoff Statistics ......................................................................................63.4.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics ................................................................6

3.5 Call Log Summary Table (Post – DT) ..............................................................................63.5.1 CDMA 1 x Voice Call Event Statistics .......................................................................63.5.2 CDMA 1x Handoff Statistics ......................................................................................73.5.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics ................................................................7

4 CDMA2000 1X Report........................................................................................................... 84.1.1 CDMA 1 x Voice .......................................................................................................8Received Power (dBm) (Long Call) ..........................................................................8

............................................................................................................................................. 8

............................................................................................................................................. 84. 2 Transmitted Power (dBm) (Long Call) ..................................................................9

............................................................................................................................................. 9

............................................................................................................................................. 94.2 Best Ec/Io (Long Call) ....................................................................................................104.3 Active Pilot Count (Long Call) ........................................................................................114.4 Best PN/ Active PN (Long Call) .....................................................................................124.5 F-FER (Long Call) .........................................................................................................13

5 EV-DO Report...................................................................................................................... 15

5.1 1x EVDO Connection Setup Statistics (Pre – DT) .........................................................15........................................................................................................................................ 15

5.2 1x EVDO Connection Setup Statistics (Post – DT) ........................................................15........................................................................................................................................ 15

5.3 Event Analysis ...............................................................................................................155.4 Forward Link Data KPI Maps .........................................................................................16

5.4.1 Best C/I (dB) ..........................................................................................................165.4.2 Received Power (dBm) ...........................................................................................175.4.3 Average DRC Rate .................................................................................................185.4.4 Active PN Count...................................................................................................... 205.4.5 Best Serving PN .....................................................................................................215.4.6 Best ASP SINR .......................................................................................................225.4.7 Average PER ..........................................................................................................24

5.4.8 Reverse TX Pilot Power ..........................................................................................255.5 Packet Error Rate (PER) ...............................................................................................27

Author: Asfand Tariq Drive Test Report TemplatePage 2 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 3/28

 

Internal-Drive Test Report

........................................................................................................................................... 27

........................................................................................................................................... 27

1 Document Control

1.1 Document Management History

RevisionNumber 

Date Name Revision

1 01-12-2011 Asfand Tariq

1.2 Reviewers

Reviewer Date Feedback

Mudassar Dar 

Traffic Stats formats and SoP for Optimization andAcceptance are given as separate documents

Author: Asfand Tariq Drive Test Report TemplatePage 3 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 4/28

 

Internal-Drive Test Report

2 Executive Summary [Editable]

2.1 Objective

Single Site Drive Test will be conducted as per the Scope of Work

2.2 BTS Audit Info Pre - DT

      S       i      t     e Sr.

No Site IDSite Name

Height (M)

Actual Site Audit

Antenna’s Azimuth Elect. Tilt Mech. Tilt

1.MUZP-4016

ShoukatLane 30,30,30 110,195,270 3,3,2 0,0,0

2.

MUZP-4017CMH

Muzafarabad 31,31,31 30,180,295 5,5,5 0,0,0

2.3 BTS Audit Info Post - DT

      S       i      t     e Sr.

No Site IDSite Name

Height (M)

Actual Site Audit

Antenna’s Azimuth Elect. Tilt Mech. Tilt

1.MUZP-4016

ShoukatLane 30,30,30 110,195,270 1,3,2 0,0,0

2.MUZP-4017

CMH

Muzafarabad 31,31,31 30,180,295 5,5,5 0,0,0

3 Drive Test Results Summary

3.1 Site Health related Information

S.No BTS ID AlarmType

Reason PendingDuration

Remarks

1 MUZP-4016 N/A

 N/A

 N/A

 N/A

2

MUZP-4017 

N/A

 

N/A

 

N/A

 

N/A

Author: Asfand Tariq Drive Test Report TemplatePage 4 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 5/28

 

Internal-Drive Test Report

3.2 DT Map with Topography, Alarms and BTS Data

DT Route with Notifications

3.3 Number of Active Subscribers at the time of DT

S.No ServingSite/BTSID

ServingSector ID

ServingChannels/Carriers

PNList

Service1X/EV-DO

Total ActiveSubscribers

Author: Asfand Tariq Drive Test Report TemplatePage 5 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 6/28

 

Internal-Drive Test Report

3.4 Call Log Summary Table (Pre – DT)

3.4.1 CDMA 1 x Voice Call Event Statistics

Device

CallAttempts(Dialed +

Excluded)  SuccessfulCalls 

NormalReleased

Calls 

Access FailuresDropped

Calls 

ServiceNot

Available(SNA) 

TestSystemFailure(TSF) 

ReleaseB/F

NormalTime

(RNT) ZTE

VphoneTerminal 29 27 27 Nill Nill 1

3.4.2 CDMA 1x Handoff Statistics

3.4.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics

1x EVDOConnection

Attempts

1x EVDOConnection

Success

NormalConnectionRelease (AT

Initiated)

AbnormalConnection

Release

1x EVDOConnection

Attempt Failure

2 2 2 0 0

3.5 Call Log Summary Table (Post – DT)

3.5.1 CDMA 1 x Voice Call Event Statistics

Author: Asfand Tariq Drive Test Report TemplatePage 6 of 

Date: 1st Decemeber 2011

Device HO Request Successful HO HO Failure

ZTE EVDO Terminal 80 80 Nil

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 7/28

 

Internal-Drive Test Report

Device

CallAttempts(Dialed +

Excluded)  SuccessfulCalls 

NormalReleased

Calls 

Access FailuresDropped

Calls 

ServiceNotAvailable(SNA) 

TestSystemFailure(TSF) 

Release

B/FNormalTime

(RNT) ZTE

VphoneTerminal 110 109 109 Nill Nill 3

3.5.2 CDMA 1x Handoff Statistics

3.5.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics

1x EVDOConnection

Attempts

1x EVDOConnection

Success

NormalConnectionRelease (AT

Initiated)

AbnormalConnection

Release

1x EVDOConnection

Attempt Failure

5 5 5 0 0

Author: Asfand Tariq Drive Test Report TemplatePage 7 of 

Date: 1st Decemeber 2011

Device HO Request Successful HO HO Failure

ZTE EVDO Terminal 248 248 Nil

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 8/28

 

Internal-Drive Test Report

4 CDMA2000 1X Report

4.1.1 CDMA 1 x Voice

Received Power (dBm) (Long Call)

RX Level Plot (Pre – DT)

RX Level Plot (Post –DT)

Author: Asfand Tariq Drive Test Report TemplatePage 8 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 9/28

 

Internal-Drive Test Report

4. 2 Transmitted Power (dBm) (Long Call)

TX Level Plot (Pre – DT)

TX Level Plot (Post – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 9 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 10/28

 

Internal-Drive Test Report

4.2 Best Ec/Io (Long Call)

Ec/Io Level Plot (Pre – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 10 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 11/28

 

Internal-Drive Test Report

Ec/Io Level Plot (Post -DT)

4.3 Active Pilot Count (Long Call)

Active Pilot Count Plot (Pre – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 11 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 12/28

 

Internal-Drive Test Report

Active Pilot Count Plot (Post – DT)

4.4 Best PN/ Active PN (Long Call)

Active PN Plot (Pre – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 12 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 13/28

 

Internal-Drive Test Report

Active PN Plot

4.5 F-FER (Long Call)

Author: Asfand Tariq Drive Test Report TemplatePage 13 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 14/28

 

Internal-Drive Test Report

FER Plot (Pre- DT)

FER Plot (Post –DT)

Author: Asfand Tariq Drive Test Report TemplatePage 14 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 15/28

 

Internal-Drive Test Report

5 EV-DO Report

5.1 1x EVDO Connection Setup Statistics (Pre – DT)

5.2 1x EVDO Connection Setup Statistics (Post – DT)

5.3 Event Analysis

Author: Asfand Tariq Drive Test Report TemplatePage 15 of 

Date: 1st Decemeber 2011

1x EVDO Connection Setup Failure Logs

S.No Time stamp Call FailureReason

Analysis/Remarks

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 16/28

 

Internal-Drive Test Report

5.4 Forward Link Data KPI Maps

5.4.1 Best C/I (dB)

Also the C/I distribution on each available carrier is to be provided in form of Chart/ Table

C/I (dB) Plot (Pre- DT)

Author: Asfand Tariq Drive Test Report TemplatePage 16 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 17/28

 

Internal-Drive Test Report

C/I (dB) Plot (Post – DT)

5.4.2 Received Power (dBm)

Also the Received Power distribution on each available carrier is to be provided in form of 

Chart/ Table

RX Level Plot (Pre – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 17 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 18/28

 

Internal-Drive Test Report

RX Level Plot (Post – DT)

5.4.3 Average DRC Rate

Also the DRC distribution on each available carrier is to be provided in form of Chart/Table

Author: Asfand Tariq Drive Test Report TemplatePage 18 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 19/28

 

Internal-Drive Test Report

DRC Rate Plot (Pre – DT)

DRC Rate Plot (Post – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 19 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 20/28

 

Internal-Drive Test Report

5.4.4 Active PN Count

Active PN Count Plot (Pre- DT)

Author: Asfand Tariq Drive Test Report TemplatePage 20 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 21/28

 

Internal-Drive Test Report

Active PN Count Plot (Post – DT)

5.4.5 Best Serving PN

Author: Asfand Tariq Drive Test Report TemplatePage 21 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 22/28

 

Internal-Drive Test Report

Best Pilot Graph (Pre- DT)

Best Pilot Graph (Post –DT)

5.4.6 Best ASP SINR

Also the Best ASP SINR distribution on each available carrier is to be provided in form of Chart/ Table

Author: Asfand Tariq Drive Test Report TemplatePage 22 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 23/28

 

Internal-Drive Test Report

SINR Plot (Pre- DT)

SINR Plot (Post – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 23 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 24/28

 

Internal-Drive Test Report

5.4.7 Average PER

Also the Average PER distribution on each available carrier is to be provided in form of Chart/ Table

Average PER Plot (Pre – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 24 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 25/28

 

Internal-Drive Test Report

Average PER Plot (Post – DT)

5.4.8 Reverse TX Pilot Power 

TX Power Plot (Pre – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 25 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 26/28

 

Internal-Drive Test Report

TX Power Plot (Post – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 26 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 27/28

 

Internal-Drive Test Report

5.5 Packet Error Rate (PER)

Instantaneous PER (Pre- DT)

Instantaneous PER (Post – DT)

Author: Asfand Tariq Drive Test Report TemplatePage 27 of 

Date: 1st Decemeber 2011

5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com

http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 28/28

 

Internal-Drive Test Report

Conclussion:

As all KPI’s are improved after optimization activity. Therefore, this site is welloptimized.

Author: Asfand Tariq Drive Test Report TemplatePage 28 of 

Date: 1st Decemeber 2011