Pre-Post Analysis Report
Gauging OfficeSTRP SwapProject
Author: Asfand TariqDate: 01-12-2011Version: OPT-1.2/DT/ PTCL HQ/ 24-09-2010Status:
Sec. Class: Internal – Drive Test Report
© Copyright 2010 PTCL - All rights reserved. No part of this work, which is protected by copyright, may be reproduced in any form or by any means - graphic, electronic or mechanical, including photocopying, recording, taping or storage in an information retrievalsystem – without the written permission of the copyright owner.
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 2/28
Internal-Drive Test Report
Contents
Pre-Post Analysis Report ........................................................................................................11 Document Control.................................................................................................................. 3
1.1 Document Management History ......................................................................................31.2 Reviewers ........................................................................................................................3
2 Executive Summary [Editable]............................................................................................... 42.1 Objective ..........................................................................................................................4
Single Site Drive Test will be conducted as per the Scope of Work ........................42.2 BTS Audit Info Pre - DT ..................................................................................................42.3 BTS Audit Info Post - DT .................................................................................................4
3 Drive Test Results Summary ..................................................................................................43.1 Site Health related Information ........................................................................................4
3.2 DT Map with Topography, Alarms and BTS Data ............................................................5.......................................................................................................................................... 53.3 Number of Active Subscribers at the time of DT ..............................................................5
Author: Asfand Tariq Drive Test Report TemplatePage 27 of ................................................................................................................................2
3.4 Call Log Summary Table (Pre – DT) ...............................................................................63.4.1 CDMA 1 x Voice Call Event Statistics .......................................................................63.4.2 CDMA 1x Handoff Statistics ......................................................................................63.4.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics ................................................................6
3.5 Call Log Summary Table (Post – DT) ..............................................................................63.5.1 CDMA 1 x Voice Call Event Statistics .......................................................................63.5.2 CDMA 1x Handoff Statistics ......................................................................................73.5.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics ................................................................7
4 CDMA2000 1X Report........................................................................................................... 84.1.1 CDMA 1 x Voice .......................................................................................................8Received Power (dBm) (Long Call) ..........................................................................8
............................................................................................................................................. 8
............................................................................................................................................. 84. 2 Transmitted Power (dBm) (Long Call) ..................................................................9
............................................................................................................................................. 9
............................................................................................................................................. 94.2 Best Ec/Io (Long Call) ....................................................................................................104.3 Active Pilot Count (Long Call) ........................................................................................114.4 Best PN/ Active PN (Long Call) .....................................................................................124.5 F-FER (Long Call) .........................................................................................................13
5 EV-DO Report...................................................................................................................... 15
5.1 1x EVDO Connection Setup Statistics (Pre – DT) .........................................................15........................................................................................................................................ 15
5.2 1x EVDO Connection Setup Statistics (Post – DT) ........................................................15........................................................................................................................................ 15
5.3 Event Analysis ...............................................................................................................155.4 Forward Link Data KPI Maps .........................................................................................16
5.4.1 Best C/I (dB) ..........................................................................................................165.4.2 Received Power (dBm) ...........................................................................................175.4.3 Average DRC Rate .................................................................................................185.4.4 Active PN Count...................................................................................................... 205.4.5 Best Serving PN .....................................................................................................215.4.6 Best ASP SINR .......................................................................................................225.4.7 Average PER ..........................................................................................................24
5.4.8 Reverse TX Pilot Power ..........................................................................................255.5 Packet Error Rate (PER) ...............................................................................................27
Author: Asfand Tariq Drive Test Report TemplatePage 2 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 3/28
Internal-Drive Test Report
........................................................................................................................................... 27
........................................................................................................................................... 27
1 Document Control
1.1 Document Management History
RevisionNumber
Date Name Revision
1 01-12-2011 Asfand Tariq
1.2 Reviewers
Reviewer Date Feedback
Mudassar Dar
Traffic Stats formats and SoP for Optimization andAcceptance are given as separate documents
Author: Asfand Tariq Drive Test Report TemplatePage 3 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 4/28
Internal-Drive Test Report
2 Executive Summary [Editable]
2.1 Objective
Single Site Drive Test will be conducted as per the Scope of Work
2.2 BTS Audit Info Pre - DT
S i t e Sr.
No Site IDSite Name
Height (M)
Actual Site Audit
Antenna’s Azimuth Elect. Tilt Mech. Tilt
1.MUZP-4016
ShoukatLane 30,30,30 110,195,270 3,3,2 0,0,0
2.
MUZP-4017CMH
Muzafarabad 31,31,31 30,180,295 5,5,5 0,0,0
2.3 BTS Audit Info Post - DT
S i t e Sr.
No Site IDSite Name
Height (M)
Actual Site Audit
Antenna’s Azimuth Elect. Tilt Mech. Tilt
1.MUZP-4016
ShoukatLane 30,30,30 110,195,270 1,3,2 0,0,0
2.MUZP-4017
CMH
Muzafarabad 31,31,31 30,180,295 5,5,5 0,0,0
3 Drive Test Results Summary
3.1 Site Health related Information
S.No BTS ID AlarmType
Reason PendingDuration
Remarks
1 MUZP-4016 N/A
N/A
N/A
N/A
2
MUZP-4017
N/A
N/A
N/A
N/A
Author: Asfand Tariq Drive Test Report TemplatePage 4 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 5/28
Internal-Drive Test Report
3.2 DT Map with Topography, Alarms and BTS Data
DT Route with Notifications
3.3 Number of Active Subscribers at the time of DT
S.No ServingSite/BTSID
ServingSector ID
ServingChannels/Carriers
PNList
Service1X/EV-DO
Total ActiveSubscribers
Author: Asfand Tariq Drive Test Report TemplatePage 5 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 6/28
Internal-Drive Test Report
3.4 Call Log Summary Table (Pre – DT)
3.4.1 CDMA 1 x Voice Call Event Statistics
Device
CallAttempts(Dialed +
Excluded) SuccessfulCalls
NormalReleased
Calls
Access FailuresDropped
Calls
ServiceNot
Available(SNA)
TestSystemFailure(TSF)
ReleaseB/F
NormalTime
(RNT) ZTE
VphoneTerminal 29 27 27 Nill Nill 1
3.4.2 CDMA 1x Handoff Statistics
3.4.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics
1x EVDOConnection
Attempts
1x EVDOConnection
Success
NormalConnectionRelease (AT
Initiated)
AbnormalConnection
Release
1x EVDOConnection
Attempt Failure
2 2 2 0 0
3.5 Call Log Summary Table (Post – DT)
3.5.1 CDMA 1 x Voice Call Event Statistics
Author: Asfand Tariq Drive Test Report TemplatePage 6 of
Date: 1st Decemeber 2011
Device HO Request Successful HO HO Failure
ZTE EVDO Terminal 80 80 Nil
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 7/28
Internal-Drive Test Report
Device
CallAttempts(Dialed +
Excluded) SuccessfulCalls
NormalReleased
Calls
Access FailuresDropped
Calls
ServiceNotAvailable(SNA)
TestSystemFailure(TSF)
Release
B/FNormalTime
(RNT) ZTE
VphoneTerminal 110 109 109 Nill Nill 3
3.5.2 CDMA 1x Handoff Statistics
3.5.3 CDMA 1 x EV-DO Rev B/ Rev A Statistics
1x EVDOConnection
Attempts
1x EVDOConnection
Success
NormalConnectionRelease (AT
Initiated)
AbnormalConnection
Release
1x EVDOConnection
Attempt Failure
5 5 5 0 0
Author: Asfand Tariq Drive Test Report TemplatePage 7 of
Date: 1st Decemeber 2011
Device HO Request Successful HO HO Failure
ZTE EVDO Terminal 248 248 Nil
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 8/28
Internal-Drive Test Report
4 CDMA2000 1X Report
4.1.1 CDMA 1 x Voice
Received Power (dBm) (Long Call)
RX Level Plot (Pre – DT)
RX Level Plot (Post –DT)
Author: Asfand Tariq Drive Test Report TemplatePage 8 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 9/28
Internal-Drive Test Report
4. 2 Transmitted Power (dBm) (Long Call)
TX Level Plot (Pre – DT)
TX Level Plot (Post – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 9 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 10/28
Internal-Drive Test Report
4.2 Best Ec/Io (Long Call)
Ec/Io Level Plot (Pre – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 10 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 11/28
Internal-Drive Test Report
Ec/Io Level Plot (Post -DT)
4.3 Active Pilot Count (Long Call)
Active Pilot Count Plot (Pre – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 11 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 12/28
Internal-Drive Test Report
Active Pilot Count Plot (Post – DT)
4.4 Best PN/ Active PN (Long Call)
Active PN Plot (Pre – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 12 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 13/28
Internal-Drive Test Report
Active PN Plot
4.5 F-FER (Long Call)
Author: Asfand Tariq Drive Test Report TemplatePage 13 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 14/28
Internal-Drive Test Report
FER Plot (Pre- DT)
FER Plot (Post –DT)
Author: Asfand Tariq Drive Test Report TemplatePage 14 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 15/28
Internal-Drive Test Report
5 EV-DO Report
5.1 1x EVDO Connection Setup Statistics (Pre – DT)
5.2 1x EVDO Connection Setup Statistics (Post – DT)
5.3 Event Analysis
Author: Asfand Tariq Drive Test Report TemplatePage 15 of
Date: 1st Decemeber 2011
1x EVDO Connection Setup Failure Logs
S.No Time stamp Call FailureReason
Analysis/Remarks
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 16/28
Internal-Drive Test Report
5.4 Forward Link Data KPI Maps
5.4.1 Best C/I (dB)
Also the C/I distribution on each available carrier is to be provided in form of Chart/ Table
C/I (dB) Plot (Pre- DT)
Author: Asfand Tariq Drive Test Report TemplatePage 16 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 17/28
Internal-Drive Test Report
C/I (dB) Plot (Post – DT)
5.4.2 Received Power (dBm)
Also the Received Power distribution on each available carrier is to be provided in form of
Chart/ Table
RX Level Plot (Pre – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 17 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 18/28
Internal-Drive Test Report
RX Level Plot (Post – DT)
5.4.3 Average DRC Rate
Also the DRC distribution on each available carrier is to be provided in form of Chart/Table
Author: Asfand Tariq Drive Test Report TemplatePage 18 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 19/28
Internal-Drive Test Report
DRC Rate Plot (Pre – DT)
DRC Rate Plot (Post – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 19 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 20/28
Internal-Drive Test Report
5.4.4 Active PN Count
Active PN Count Plot (Pre- DT)
Author: Asfand Tariq Drive Test Report TemplatePage 20 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 21/28
Internal-Drive Test Report
Active PN Count Plot (Post – DT)
5.4.5 Best Serving PN
Author: Asfand Tariq Drive Test Report TemplatePage 21 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 22/28
Internal-Drive Test Report
Best Pilot Graph (Pre- DT)
Best Pilot Graph (Post –DT)
5.4.6 Best ASP SINR
Also the Best ASP SINR distribution on each available carrier is to be provided in form of Chart/ Table
Author: Asfand Tariq Drive Test Report TemplatePage 22 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 23/28
Internal-Drive Test Report
SINR Plot (Pre- DT)
SINR Plot (Post – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 23 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 24/28
Internal-Drive Test Report
5.4.7 Average PER
Also the Average PER distribution on each available carrier is to be provided in form of Chart/ Table
Average PER Plot (Pre – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 24 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 25/28
Internal-Drive Test Report
Average PER Plot (Post – DT)
5.4.8 Reverse TX Pilot Power
TX Power Plot (Pre – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 25 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 26/28
Internal-Drive Test Report
TX Power Plot (Post – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 26 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 27/28
Internal-Drive Test Report
5.5 Packet Error Rate (PER)
Instantaneous PER (Pre- DT)
Instantaneous PER (Post – DT)
Author: Asfand Tariq Drive Test Report TemplatePage 27 of
Date: 1st Decemeber 2011
5/11/2018 Pre- Post Analysis Report of Gauging Office - slidepdf.com
http://slidepdf.com/reader/full/pre-post-analysis-report-of-gauging-office 28/28
Internal-Drive Test Report
Conclussion:
As all KPI’s are improved after optimization activity. Therefore, this site is welloptimized.