PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT. LTD. Page 1 of 33 “PRE-FEASIBILITY REPORT OF AUGMENTATION OF KOYALI-SANGANER PIPELINEPROJECT PROPONENT M/S. INDIAN OIL CORPORATION LTD., PIPELINE DIVISION NOIDA-201301 M.2015/ Dec, 2015 Prepared By MANTEC CONSULTANTS PVT. LTD. QCI/NABET Accredited EIA Consultant at S.No.101 as per List of Accredited consultant Organizations/Rev.35/Oct. 08, 2015 and MoEF & NABL approved Laboratory 805, Vishal Bhawan, 95 Nehru Place, New Delhi-110019, PH. 011- 26429294/95/96, Fax. 011-26463665/26842531, e-mail: [email protected] , Environment Division, D-36, Sector-6, Noida-201 301, U. P., Ph. 0120-4215000, 0120-4215807 Fax. 0120-4215809, E-mail: [email protected] Website: www.mantecconsultants.com

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

  • Upload
    others

  • View
    19

  • Download
    3

Embed Size (px)

Citation preview

Page 1: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 1 of 33

“PRE-FEASIBILITY REPORT OF AUGMENTATION OF KOYALI-SANGANER PIPELINE”

PROJECT PROPONENT

M/S. INDIAN OIL CORPORATION LTD., PIPELINE

DIVISION NOIDA-201301

M.2015/ Dec, 2015

Prepared By

MANTEC CONSULTANTS PVT. LTD.

QCI/NABET Accredited EIA Consultant at S.No.101 as per List of Accredited consultant

Organizations/Rev.35/Oct. 08, 2015 and MoEF & NABL approved Laboratory

805, Vishal Bhawan, 95 Nehru Place, New Delhi-110019, PH. 011-

26429294/95/96,

Fax. 011-26463665/26842531, e-mail: [email protected],

Environment Division, D-36, Sector-6, Noida-201 301, U. P.,

Ph. 0120-4215000, 0120-4215807 Fax. 0120-4215809, E-mail: [email protected]

Website: www.mantecconsultants.com

Page 2: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 2 of 33

Table of Contents

1 EXECUTIVE SUMMARY ............................................................................................................ 5

1.1 INTRODUCTION ..................................................................................................................... 5

1.1.1 Project and project proponents.................................................................................... 5

1.1.2 Nature of the project ..................................................................................................... 7

1.1.3 Demand supply gap ....................................................................................................... 7

1.1.4 Employment generation ............................................................................................... 7

1.2 PROJECT DESCRIPTION ........................................................................................................ 7

1.2.1 Location .......................................................................................................................... 7

1.2.2 Pipeline Capacities ........................................................................................................ 8

1.3 SITE ANALYSIS ...................................................................................................................... 8

1.3.1 Connectivity ................................................................................................................... 8

1.3.2 Land form, Land use and Land ownership .................................................................. 8

1.3.3 Topography .................................................................................................................... 9

1.3.4 Climate of the area ......................................................................................................... 9

1.3.5 Infrastructure ................................................................................................................ 9

1.4 PLANNING BRIEF .................................................................................................................. 9

1.4.1 Planning concept ........................................................................................................... 9

1.4.2 Population projection ................................................................................................... 9

1.4.3 Infrastructure, amenities and facilities ........................................................................ 9

1.5 REHABILITATION AND RESETTLEMENT ......................................................................... 10

1.6 PROJECT SCHEDULE & COST ESTIMATES ........................................................................ 10

2 INTRODUCTION ..................................................................................................................... 10

2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT ........................................... 11

2.2 BRIEF DESCRIPTION OF NATURE OF PROJECT ............................................................... 11

2.2.1 Project at a glance ........................................................................................................ 11

2.3 NEED OF THE PROJECT AND ITS IMPORTANCE .............................................................. 12

2.4 THE MAIN PURPOSE & IMPOTANCE OF THE PROJECT ................................................... 12

2.5 DEMAND SUPPLY GAP ........................................................................................................ 13

2.6 EMPLOYMENT GENERATION ............................................................................................ 13

3 PROJECT DESCRIPTION ........................................................................................................ 14

3.1 TYPE OF PROJECT ............................................................................................................... 14

3.2 LOCATION ............................................................................................................................ 14

3.3 PROCESS DESCRIPTION ...................................................................................................... 14

Page 3: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 3 of 33

3.4 RESOURCE OPTIMIZATION ................................................................................................ 15

3.4.1 Electricity ..................................................................................................................... 15

3.5 WATER ................................................................................................................................. 15

3.6 GENERATION OF WASTES .................................................................................................. 15

3.6.1 Solid & hazardous wastes ........................................................................................... 15

3.6.2 Liquid effluents ............................................................................................................ 15

3.6.3 Gaseous emissions ....................................................................................................... 15

3.7 INFORMATION OF EIA PURPOSE ....................................................................................... 16

4 SITE ANALYSIS ....................................................................................................................... 18

4.1 CONNECTIVITY .................................................................................................................... 18

4.2 LAND FORM, LAND USE AND LAND OWNERSHIP ........................................................... 18

4.3 TOPOGRAPHY ...................................................................................................................... 18

4.4 EXISTING LAND USE PATTERN ......................................................................................... 19

4.5 EXISTING INFRASTRUCTURE............................................................................................. 19

4.6 CLIMATE OF THE AREA ...................................................................................................... 19

4.7 INFRASTRUCTURE .............................................................................................................. 19

4.7.1 Telecommunication System ....................................................................................... 19

5 PLANNING BRIEF ................................................................................................................... 20

5.1 PLANNING CONCEPT .......................................................................................................... 20

5.2 POPULATION PROJECTION ................................................................................................ 20

5.3 LAND USE PLANNING ......................................................................................................... 20

5.4 INFRASTRUCTURE DEMAND ............................................................................................. 20

5.4.1 Physical Demand ......................................................................................................... 20

5.5 AMENITIES/FACILITIES ..................................................................................................... 20

6 PROPOSED INFRASTRUCTURE ........................................................................................... 22

6.1 INDUSTRIAL AREA .............................................................................................................. 22

6.2 RESIDENTIAL AREA ............................................................................................................ 22

6.3 SOCIAL INFRASTRUCTURE ................................................................................................ 22

6.4 DRINKING WATER MANAGEMENT ................................................................................... 22

6.5 SEWERAGE SYSTEM ............................................................................................................ 22

6.6 INDUSTRIAL WASTE MANAGEMENT ................................................................................ 23

6.6.1 Solid Waste Management............................................................................................ 23

6.6.2 Waste water Management .......................................................................................... 23

6.7 POWER REQUIREMENT & SUPPLY/SOURCE.................................................................... 23

Page 4: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 4 of 33

7 REHABILITATION AND RESETTLEMENT PLAN ............................................................... 24

8 PROJECT SCHEDULE AND COST ESTIMATE ...................................................................... 25

8.1 PROJECT SCHEDULE ........................................................................................................... 25

8.1.1 Pre-Project Activity ..................................................................................................... 25

8.1.2 Project Construction ................................................................................................... 25

8.2 ESTIMATED PROJECTED COST .......................................................................................... 25

9 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION) ................................................. 26

TABLE

Table 1: Detail of Employees .............................................................................................................. 13

Table 2: Nearest City along with distance ......................................................................................... 14

Table 3: Connectivity of Pipeline ....................................................................................................... 18

Figure

Figure 1: Schematic Representation of Prior Environment Clearance Process for Category A

Project .................................................................................................................................................. 17

Annexure

Annexure-1: Location Maps

Annexure-2: Map showing 15km radius Environment Sensitivity

Annexure-3: Corner Coordinates Map

Page 5: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 5 of 33

1 EXECUTIVE SUMMARY

1.1 INTRODUCTION

The entire demand for petroleum products of North Gujarat and Rajasthan is currently

met from Koyali refinery through Koyali-Sanganer Pipeline (KSPL). In the absence of

any alternative means of supply, product placement at these locations gets severely

affected in event of shutdown of Koyali refinery, thereby necessitating supply from

other sources through un-economical modes. To address this problem new pumping

units at Kandla have been approved ,which involves transportation of products received

coastally from Kandla till Viramgam only ,while further transportation and delivery to

Tap-off-Points (ToP) at Sidhpur, Salawas, Chittaurgarh and Jaipur will be done through

KSPL after its augmentation.

Also, considering the expansion of PNC and additional availability of Naphtha from

other units of Panipat refinery, the annual additional requirement of Naphtha is around

800 TMT. This requirement of naphtha is to be met through tank wagons through rail

movement from Koyali to Panipat. Considering the volume to be transported and the

inherent advantage of pipeline over other modes viz. safety, reliability, less energy

consumption, environment-friendliness etc, it is prudent to transport Naphtha through

Koyali Sanganer Pipeline(KSPL) upto Sanganer and from Sanaganer, IOCL proposes to

lay a new 340 kms pipeline (Jaipur-Panipat Naphtha Pipeline). The transportation of

Naphtha also necessitates augmentation of KSPL.

Further in view of upcoming Mohanpura terminal at Jaipur, and subsequent closure of

Ajmer ToP, revised throughput projections have been made for 2016-17 and 2021-22 as

under:

Page 6: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 6 of 33

Marketing ToP Projected throughputs (TMT) 2016-17 2021-22

From Koyali From kandla Total From Koyali From kandla Total

Navagam 715 0 715 859 0 859

Sidhpur 218 206 424 12 497 509

Salawas 226 908 1134 86 1354 1440

Chittaurgarh 653 161 814 111 972 1083

Jaipur 822 0 822 1087 19 1106

Sub Total

(Without

Naphtha

2634 1275 3909 2155 2842 4997

Naphtha 800 0 800 800 0 800

Total 3434 1275 4709 2955 2842 5797

Considering the projects throughput requirements it is proposed to augment the capacity of

KSPL as Follows:

Section Proposed capacity (MMTPA)

Koyali-Viramgan 5.0

Viramgam-Kot 5.0

Kot-Jaipur 4.2

Kot-Salawas 1.7

1.1.1 Project and project proponents

Indian Oil Corporation Limited, a fortune ‘Global 500’ company, is a leading public

sector undertaking (PSU) engaged in refining, transportation and marketing of

petroleum products across the country. Pipelines division of IOCL owns and operates

over 11,214 kms of cross country pipeline for transportation of crude oil, LPG, Naphtha

and finished petroleum products across the country. Pipeline for transportation of

crude oil and finished petroleum products to various consumption centers.

Transportation through pipeline is the safest mode of transportation in comparison to

other modes of transportation i.e. rail and roads. It is highly reliable, environment

friendly, energy efficient and cost efficient.

Page 7: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 7 of 33

1.1.2 Nature of the project

The proposed project is involving for augmentation of KSPL. All the facilities of pumping

station like fire fighting, electrical system, Pump house, Pipeline etc. will comply with

national, internal standards and M.B. Lal committee recommendations.

Other facilities like administrative building, first-aid post, bore-wells, DG Set, etc. are

also included in the project. The Koyali-Sanganer pipeline layout is attached as

Annexure-1.

1.1.3 Demand supply gap

The demand of petroleum products based on the projection for 2016-17 and 2021-22

for ToPs en route KSPL viz. Navagam , Sidhpur, Chittaurgarh,Salawas ,Jaipur has

increased along with new demand of Naphtha for Panipat Naptha cracker

,Augumentation of KSPL is required upto 5 MMTPA

1.1.4 Employment generation

The manpower requirement would be 58 during construction and 29 during operation

of the pipeline, which will be met through internal deployment as well as by induction

of competent personnel, who will be trained suitably.

1.2 PROJECT DESCRIPTION

With the Augmentation of KSPL , Viramgam-Mohanpura section of KSPL will receive

product from one source at a time i.e either from Koyali refinery through Koyali-

Viramgam section of KSPL or from Kandla port. Naphtha from Koyali refinery would be

transported upto Jaipur through existing KSPL .While other products ex-Koyali refinery

viz. MS ,SKO and HSD would be delivered at ToPs en route KSPL, Naphtha would be

transported further to Panipat through new Jaipur-Panipat Naphtha Pipeline Location

No New RoU is required for this augmentation project as all work will be done in

existing stations of KSPL. The location map is attached as Annexure-1.

Page 8: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 8 of 33

1.2.1 Pipeline Capacities

The capacity of the pipeline after augmentation will be 5 MMTPA. The capacity of

pipeline enhanced is to cater the increased transportation demand of petroleum

products at ToP’s of KSPL and new demand of naphtha at Panipat refinery.

1.3 SITE ANALYSIS

Augmentation work will be carried out at already existing stations i.e. Koyali, Viramgam,

Kot and Sidhpur. There is no population encountered near the stations. Hence, no

Rehabilitation and Resettlement (R&R) issues.

1.3.1 Connectivity

The terminal is well connected to rail and road ways.

Koyali-

Sanganer Railway Station: Approx. 11 km, (by road) from Koyali pumping station.

Vadodara Airport: Approx. 13 km, S-W (by road) from Koyali pumping station.

Viramgam-

Viramgam railway station: Approx. 3 km, N (by road) from Viramgam pumping station.

Ahmedabad Airport: Sardar Ballabh bhai patel International Airport, Approx. 66 km, W

(by road) from Viramgam Station.

Kot:-

Falna Railway station: Approx 12 km

Maharana pratap airport, Udaipur: Approx 127 km, S-W (by road) from Kot station.

Sidhpur :-

Sidhpur railway station: Approx 1.25 km, S-W (by road) from Sidhpur station.

Sardar Ballav bhai patel International Airport: Approx 105 km, S (by road) from Sidhpur

station.

1.3.2 Land form, Land use and Land ownership

IOCL has its own land at all existing stations of KSPL. No additional land will be required

for the project. The land use at stations is flat.

Page 9: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 9 of 33

1.3.3 Topography

The existing KSPL pipeline passes through Gujarat and Rajasthan . Pumping stations is

at Gujarat. Koyali pumping station, Viramgam station, Kot Station and Sidhpur station.

Climate of the area

The climate of the area is characterized by hot summer, cold winter and rainfall.

1.3.4 Infrastructure

The civil structures are provided like shelter to men and machinery, pump shed, booster

sheds have been planned to be steel structure, RCC civil structures have been planned.

1.4 PLANNING BRIEF

Planning for the augmentation of Koyali-Sanganer pipeline (KSPL) is given in the

following sub section:-

1.4.1 Planning concept

The proposed project planned to cater the enhanced demand of transportation of

petroleum products at KSPL ToP’s and new requirement of naphtha for Panipat

refinery. The augmentation work is only at existing station.

1.4.2 Population projection

The manpower would be required about 58 for the construction period and approx 29

for the operation of the pipeline. The manpower requirement is expected to be met

through internal deployment as well as by induction of competent personnel, who will

be trained suitably.

1.4.3 Infrastructure, amenities and facilities

Infrastructure, amenities and facilities required for construction and operation of

pipeline and facilities have been determined and provided in the project area.

Page 10: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 10 of 33

1.5 REHABILITATION AND RESETTLEMENT

The project belongs to the augmentation of KSPL. The stations where augmentation is

envisaged already exists. No additional land is required for this project. Only increase in

capacity of terminal is envisaged. Hence, no R&R envisaged.

1.6 PROJECT SCHEDULE & COST ESTIMATES

Construction activities will start after all statutory clearances, including environmental

clearance of the project. Total time schedule for the project is 30 months after receipt of

statutory clearance.

Total cost of the proposed project is estimated as Rs. 276.23 Crore including foreign

exchange of Rs 16.27 Crore, at 2014 price level

Page 11: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 11 of 33

2 INTRODUCTION

2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT

Indian Oil Corporation Limited, a fortune ‘Global 500’ company, with sales turnover

of Rs. 4,50,756 crore and profits of Rs. 5,273 crore for the year 2014-15, is a leading

public sector undertaking (PSU) engaged in refining, transportation and marketing of

petroleum products across the country. Pipelines division of IOCL owns and operates

over 11,214 kms of cross country pipeline for transportation of crude oil, LPG, Naphtha

and finished petroleum products across the country. Pipeline for transportation of

crude oil and finished petroleum products to various consumption centers.

Transportation through pipeline is the safest mode of transportation in comparison to

other modes of transportation i.e. rail and roads. It is highly reliable, environment

friendly, energy efficient and cost efficient.

As an integrated oil company with refineries, marketing terminals/depots and retail

outlets, IOCL is playing a significant role in the nation’s economic development and

growth.

The project envisaged to cater the demand of naphtha and transported through

pipeline.

2.2 BRIEF DESCRIPTION OF NATURE OF PROJECT

The description of the augmentation of Koyali-Sanganer pipeline is as follows:

2.2.1 Project at a glance

Augmentation of KSPL broadly involves the following:

Replacement of 1 existing motor-driven MLPU(Main Line Pumping Unit) at

Koyali with new MLPU of adequate capacity

Replacement of 2 existing mainline pumps at Koyali with new pumps of

adequate capacity

Installation of 3 (2+1) motor-driven MLPUs of adequate capacity at Viramgam

for pumping in Viramgam-Sidhpur section

Page 12: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 12 of 33

Replacement of all existing engine/motor-driven MLPUs at Sidhpur and Kot with

new MLPUs of adequate capacity

1 LBT of 10,000 kl nominal capacity at Kot

The facilities required for operation of the project, viz., pumping units and booster shed

to accommodate the pumping units with associated facilities have been planned to be

steel structure. Other facilities like RCC civil structure have been planned to

accommodate control panels, HT/LT panels, Batteries etc. all the safety factors like wind

load, seismic load, soil bearing capacity etc have been taken into account while

designing the civil structures.

The location map of the project is attached as Annexure-1.

2.3 NEED OF THE PROJECT AND ITS IMPORTANCE

The need of the augmentation of Koyali-Sanganer pipeline (KSPL) is entirely on the

additional product requirement of ToP’s en-route existing KSPL . The additional

products will either be coming from Koyali refinery or from Kandla port upto Viramgam

where from they will be transported through existing KSPL . Also there is requirement

of transportation of 800TMT Naphtha to from Koyali Refinery to Naphtha Cracker in

Panipat which will also be met through augmentation of KSPL. Naphtha will be

transported from Koyali to Sanganer in existing KSPL and further to Panipat through

new Jaipur-Panipat Naphtha Pipeline.

THE MAIN PURPOSE & IMPOTANCE OF THE PROJECT

The main purpose of the project is as follows-

Transportation of petroleum products coming from Kandla to Viramgam to existing

ToP’s of KSPL.

New requirement of transportation of 800TMT Naphtha to from Koyali Refinery to

Naphtha Cracker in Panipat. The proposed project have significant role in

transportation of naphtha viz. safety, reliability, less energy consumption,

environment friendly which was earlier received through rail.

Increased projection of petroleum products at existing ToP’s of KSPL.

Page 13: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 13 of 33

2.4 DEMAND SUPPLY GAP

The demand of petroleum products based on the projection for 2016-17 and 2021-22

for ToPs en route KSPL viz. Navagam , Sidhpur, Chittaurgarh,Salawas ,Jaipur has

increased along with new demand of Naphtha for Panipat Naptha cracker

,Augumentation of KSPL is required upto 5 MMTPA

2.5 EMPLOYMENT GENERATION

The workers required during construction phase will be met through internal

deployment as well as by induction of competent personnel, who will be trained

suitably. The details of employment are as given below in Table-1.

Table 1: Detail of Employees

No. of Employee Detail

58 Construction Phase of Pipeline

29 Operational Phase of Pipeline

Page 14: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 14 of 33

3 PROJECT DESCRIPTION

3.1 TYPE OF PROJECT

The augmentation of KSPL is to enhance the capacity of existing stations to transport

upto 5MMTPA of petroleum products

LOCATION

The augmentation work will be carried out at Koyali, Viramgam,Sidhpur and Kot,

stations.

The nearest city from the stations/refinery is given in Table-2.

Table 2: Nearest City along with distance

S. No. Station/refinery Nearest city name and distance

1. Koyali Vadodara: Approx 7 km SW

2. Viramgam Viramgam Approx. 3 km,

Ahmedabad Approx. 60 km, W

3. Sidhpur Sidhpur, Approx 1.25 SW

4. Kot Bali Approx 5.6 km E

Environmental sensitivity map showing 10km radius is attached as Annexure-2.

3.2 PROCESS DESCRIPTION

The augmentation of KSPL for meeting the enhanced throughput requirements of

existing ToPs, naphtha transportion from Koyali refinery to Panipat refinery and

transportation of products received coastallay from Kandla. The project involves

increasing the capacity of KSPL to 5 MMTPA.

Page 15: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 15 of 33

3.3 RESOURCE OPTIMIZATION

3.3.1 Electricity

The power supply will be met through 33 KV grid power supply from Jaipur. 33/6.6 KV

switchyard has been envisaged for extending 6.6 KV power supply to MLPUs. Other

facilities are as follows-

Automatic power factor controller with requisite capacitor banks would be

provided for improving power factor in PMCC panel.

A new MCC panel, with one incomer, would be installed for extending power to

the new facilities viz. MOV, Sump motor, PCV etc.

3.4 WATER

The water will be utilized as domestic purposes by workers during construction phase

and operational phase.

3.5 GENERATION OF WASTES

3.5.1 Solid & hazardous wastes

The solid and hazardous waste will not generate. Project belongs to transportation of

Naphtha.

3.5.2 Liquid effluents

Very small quantity of domestic waste will be generated during construction phase

there will be provision for disposal of domestic effluent into septic tanks followed by

soak pit.

3.5.3 Gaseous emissions

The gaseous Emissions would be due to the DG set operation at the stations. The

emission from DG sets will be kept within the prescribed limit of the SPCB/CPCB which

will be released through adequate height stack.

Page 16: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 16 of 33

3.6 INFORMATION OF EIA PURPOSE

As per the EIA Notification 2006 of Ministry of Environment, Forests and climate change,

Government of India and lastly amended on 2000, the transportation of petroleum

product through pipeline has to obtain prior environmental clearance. The proposed

project is covered under Category 6 (a) (Oil & gas transportation pipe line (Crude

and refinery/Petrochemical products) passing through National

parks/Sanctuaries/Coral reefs/ecologically sensitive areas) as per the Schedule of

EIA Notification.

As Environmental clearance of Sidhpur Sanagaer Section of KSPL has already been obtained

vide notification no J-11011/66/2001-IA II (I) dated 23.12.2002 , prior environmental

clearance from MoEF&CC, GoI ,New Delhi under Category – ‘A’ project as listed at Sl.no. 6(a)

of schedule of EIA notification dated 14th Sept’2006 is sought for proposed capacity

augmentation of Koyali Sanganer Pipeline(KSPL).

The process for obtaining Environmental Clearance for the proposed project as per EIA

Notification-2006 is given in Figure-1.

Page 17: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 17 of 33

Figure 1: Schematic Representation of Prior Environment Clearance Process for Category A Project

Page 18: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 18 of 33

4 SITE ANALYSIS

4.1 CONNECTIVITY

The proposed pipeline project will be easily approachable. The connectivity of pipeline

is given in Table-3.

Table 3: Connectivity of Pipeline

S. No. Location

Station/pipeline point

Railway station name &

Distance

Airport name & Distance

1. Koyali Sanganer Railway Station:

Vadodara (Approx 11 KM)

Vadodara Airport: Approx.

13 km, SW (by road) from

Koyali pumping station.

2. Viramgam Viramgam railway station:

Approx. 3 km, N (by road)

from Viramgam pumping

station.

Ahmedabad Airport: Sardar

Ballabh bhai patel

International Airport,

Approx. 66 km, W (by road)

from Viramgam Station.

3. Kot Falna Railway station: Approx

12 km

Airport: Maharana pratap

airport, Udaipur Approx

127km SW

4. Sidhpur Sidhpur railway station:

Approx 1.25 km, SW

Sardar Ballabh bhai patel

International Airport,

Approx 105 km, S.

The corner Coordinate Maps is attached as Annexure-3.

4.2 LAND FORM, LAND USE AND LAND OWNERSHIP

The land use at stations is flat and land use of pipeline is varying from flat to simple

terrain. No additional land will be required for the proposed project. The owner of the

stations is IOCL.

4.3 TOPOGRAPHY

The Pumping stations are at Gujarat and Rajasthan. Koyali refinery, Viramgam station,

Kot Station, Sidhpur station. Stations located in the flat plain of the state Gujarat and

Rajasthan. The average elevation of the sites Koyali, Viramgam, Kot, Sidhpur would be

around 45 m, 26 m, 315 m, 130 m respectively.

Page 19: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 19 of 33

4.4 EXISTING LAND USE PATTERN

Existing land use pattern of the station/refinery is simple flat. It is owned by IOCL

4.5 EXISTING INFRASTRUCTURE

The existing infrastructure is used for transporation of Petroleum products from Koyali

to Various ToPs en-route KSPL.

4.6 CLIMATE OF THE AREA

The climate of the area is characterized by hot summer, cold winter and rainfall. The

maximum temperature of Gujarat (Koyali, Viramgam, Sidhpur) during summer varies

from approximately 43 to 460C, and in Rajasthan (Kot); varies from 450C -460C.

4.7 INFRASTRUCTURE

The civil structures are provided like shelter to men and machinery, pump shed, booster

sheds have been planned to be steel structure, RCC civil structures have been planned.

The other infrastructure facility as follows-

4.7.1 Telecommunication System

The salient features of the telecommunication system envisaged for KSPL are as given

below-

Telecommunication system being deployed under SMPL debottlenecking project

will be utilized. Hence, no new backbone telecommunication system has been

considered.

CCTV surveillance system has been considered for the new facilities including

RCP & SV/MOV stations.

Page 20: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 20 of 33

5 PLANNING BRIEF

5.1 PLANNING CONCEPT

The augmentation of KSPL planned is to augment existing pumping and allied facilities

of existing stations of KSPL. Now work is involved in RoU for mainline.

5.2 POPULATION PROJECTION

The manpower would be required about 58 for the construction period and approx 29

for the operation of the pipeline. The manpower requirement is expected to be met

through internal deployment as well as by induction of competent personnel, who will

be trained suitably.

5.3 LAND USE PLANNING

There will be no change in the already existing stations. No land acquisition envisaged.

There will be no adverse impact on land.

5.4 INFRASTRUCTURE DEMAND

5.4.1 Physical Demand

Land: The existing stations will be utilized for the enhancing of the capacity.

Water: The Water will be required for the domestic purpose for workers during

construction phase only which will be met from the tanker supply, no water required

during operational phase.

Energy: 33 KV power supply met from power grid at Jaipur. When the grid power

failure, one 2 MVA, 6.6 KV DG set for Booster Motor and Mainline Pumping Unit.

Construction Schedule: The augmentation scheme is expected to be completed in a

period of 30 months after getting statutory clearance.

5.5 AMENITIES/FACILITIES

The pumping station has mainline pumping units, Pump shed, Booster Shed, VFD

(Variable Frequency Drive), Control panels, MCC panels, HT/LT panels, batteries etc.

other safety facility of the safety factors like wind load, seismic load, soil bearing

Page 21: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 21 of 33

capacity etc have taken into account while designing the civil structures. Clean drinking

water, rest shelter etc will be provided within the station premises.

Page 22: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 22 of 33

6 PROPOSED INFRASTRUCTURE

6.1 INDUSTRIAL AREA

Infrastructure for the project is as follows-

a) Replacement of the existing motor-driven mainline pumping units (MLPUs) at

Koyali and Kot with new MLPUs of higher ratings.

b) Installation of motor-driven MLPUs at Viramgam for pumping in Viramgam-

Sidhpur section

c) Replacement of the existing mainline pumps at Sidhpur with new pumps of

higher ratings.

6.2 RESIDENTIAL AREA

The residential area is far away from the station/refinery. The employees and workers

would be come from nearby areas.

6.3 SOCIAL INFRASTRUCTURE

Well developed social infrastructure available around the pipeline. Hospital, School,

well connectivity of road and railway stations is available around the pipeline and

pumping stations.

6.4 DRINKING WATER MANAGEMENT

The water will be required for drinking and domestic purposes during construction

phase of pipeline which will be met from the tanker supply. No water will be required

during operational phase. At the station/refinery, the water is available for drinking

water purposes.

6.5 SEWERAGE SYSTEM

During construction phase septic tanks would be provided for construction workers,

the domestic waste will be treated in septic tanks followed by soak pit.

At stations septic tanks are available the domestic waste would be treated in the

existing septic tanks, followed by disposal in soak pits.

Page 23: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 23 of 33

6.6 INDUSTRIAL WASTE MANAGEMENT

The industrial waste management is as follows-

6.6.1 Solid Waste Management

No solid waste will generate. The project belongs to augmentation for enhancing the

capacity of the stations.

6.6.2 Waste water Management

No waste water will generate due to project activity.

6.7 POWER REQUIREMENT & SUPPLY/SOURCE

The details of power supply is as follows-

At Jaipur, the existing 33 KV grid power supply would be used. A separate 33/6.6

KV switchyard has been envisaged for extending 6.6 KV power supply to MLPUs

(Mainline Pumping Units). Separate LT transformer is envisaged for distributing

power supply to various LT loads including Booster Motor.

Automatic Power factor controller with requisite capacitor banks would be

provided for improving power factor in PMCC panel.

The electrical installation in the classified area will be in line with the classification for

hazardous environment.

Page 24: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 24 of 33

7 REHABILITATION AND RESETTLEMENT PLAN

The project belongs to augmentation of KSPL in the already existing station/refinery.

Hence, no R&R envisaged.

Page 25: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 25 of 33

8 PROJECT SCHEDULE AND COST ESTIMATE

8.1 PROJECT SCHEDULE

The project scheme is expected to be completed in a period of 30 months after receipt of

statutory clearance.

8.1.1 Pre-Project Activity

Statutory clearance (EC, FC & Wildlife clearance) is the main pre-project activity.

8.1.2 Project Construction

During construction phase, construction facility will be taken for construction. Total

duration of the construction is envisaged as 30 Months and construction activity will

start after getting statutory approvals.

8.2 ESTIMATED PROJECTED COST

The total project cost will be around Rs. 276.23 Crore.

Page 26: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 26 of 33

9 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION)

The augmentation of KSPL is primarly for Transportation of petroleum products coming

from Kandla to Viramgam to existing ToP’s of KSPL. Also,new requirement of

transportation of 800TMT Naphtha to from Koyali Refinery to Naphtha Cracker in

Panipat. The proposed project have significant role in transportation of naphtha

through pipeline which is highly safe,reliable,less energy consumption, environment

friendly .The augmentation projects will also help in movement of increased projection

of petroleum products to existing ToP’s of KSPL.

The socio economic scenario in the region will change with positive impact on the

regional socio economic pattern.

The workforce required during the construction phase, which will be depending upon

construction activities. Since most of the construction activities are labor intensive, the

entire required workforce will be deployed internally during construction phase of

pipeline for short term basis during the construction phase of pipeline, which will give

the positive impact.

Overall the project will have positive impacts on socio-economic environment.

Page 27: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 27 of 33

Annexure-1: Location Maps

Page 28: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 28 of 33

Annexure-2: Map showing 15km radius Environment Sensitivity

15 km radius Environmental sensitivity map of Sidhpur

Page 29: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 29 of 33

15 km radius Environmental sensitivity map of Kot

Page 30: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 30 of 33

15 km radius Environmental sensitivity map of Koyali

Page 31: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 31 of 33

15 km radius Environmental sensitivity map of Viramgam

Page 32: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 32 of 33

Annexure-3: Corner Coordinates Map

Corner coordinates of Kot

Corner coordinates of Koyali

Page 33: PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI ... · PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER PIPELINE MANTEC CONSULTANTS PVT.LTD.Page 6 of 33 Marketing

PRE-FEASIBILITY REPORT FOR IOCL, AUGMENTATION OF KOYALI-SANGANER

PIPELINE

MANTEC CONSULTANTS PVT. LTD. Page 33 of 33

Corner coordinates of Sidhpur

Corner coordinates of Viramgam terminal