37
PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

PRE-CONSTRUCTION PUBLIC MEETINGgreenlineextension.eot.state.ma.us/.../PreconstructionMeeting... · PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014 Update on FTA Full Funding Grant

  • Upload
    haanh

  • View
    216

  • Download
    3

Embed Size (px)

Citation preview

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Agenda

2

• Welcome

• FTA Full Funding Grant Agreement Update

• GLX Phase 1 Construction Update

• GLX Phases 2/2A, 3 & 4 Construction Contracts

• Upcoming Early Construction Work

• Construction Mitigation

• Night & Weekend Work

• How to Stay Connected

• Q & A

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Update on FTA Full Funding Grant Agreement

3

• Submit New Starts Update September 2013

• New Starts Financial Plan October 2013

• GLX Project in President’s Budget Report March 2014

• Submit FFGA Application September 2014

• Full Funding Grant Agreement Winter 2014-15

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Project Phasing

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

GLX PHASE 1 CONSTRUCTION UPDATE

5

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Phase 1: Early Bridge & Demolition Package Medford Street Rail Bridge Harvard Street Rail Bridge 21 Water Street Demolition

6

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Phase 1 Update: 21 Water Street Demolition

7

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Phase 1 Update: 21 Water Street Demolition

8

#9 PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Medford Street Railroad Bridge, Somerville

9

#10 PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Medford Street Railroad Bridge Widening

10

#11 PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Balance of 2014 Medford Street Bridge Work as Planned:

• Continue concrete abutment modification work in advance of steel erection activities to widen the bridge structure:

o 8/11 – TBD (single lane closures)

• 3 to 4 weekend, full roadway closures planned for bridge widening steel erection (please note that dates are forecast and subject to change): o 9/13 – 9/14/14 - COMPLETED o 10/4 – 10/5/14 o 10/25 – 10/26/14 o Additional weekend to be determined (if necessary)

• Complete structural steel fit-up and final painting: o several weeks of single lane closures

11

#12 PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Medford Street Railroad Bridge Construction

12

#13 PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Harvard Street Railroad Bridge, Medford Future Track Location

13

#14 PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Harvard Street Railroad Bridge, Medford

14

Work Includes:

•Widening Bridge

•Retaining & Noise Walls

•Moving Commuter Rail into Final Alignment

•Utility & Drainage Work

#15 PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Harvard Street Railroad Bridge, Medford

15

#16 PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Harvard Street Railroad Bridge, Medford Future contract will include corridor work on south side & build Green Line

16

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

GLX Upcoming Milestones

17

• Submit FFGA Application Fall 2014

• Begin Early Work Construction Fall 2014

o GMP#1-Procurement of Long Lead Items

o GMP#2-Early Utilities Phases 2/2A & 4

o GMP#3-Miller’s River & Fitchburg Line

• Full Funding Grant Agreement Winter 2014-15

• Begin GMP#4 – Phase 2/2A Construction Spring 2015

• Service Begins:

– Lechmere, Washington St. & Union Sq.: December 2017

– Gilman Sq., Lowell St., Ball Sq. & College Ave.: Summer 2020

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

GLX EARLY CONSTRUCTION WORK

18

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Long Lead Items

19

• Specialty trackwork

• Switch Machines

• Switch Heater

• Signal Bungalows

• Traction Power Equipment

• Washington Street Bridge Steel

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Long Lead Items

20

Specialty Track Work

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Long Lead Items

21

Switch Machines

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Long Lead Items

22

Signal Bungalow

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Drainage

23

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Utilities

24

School St Utility Bridge

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Utilities

25

Medford St Utility Bridge

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Utilities

26

Broadway Utility Bridge

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Union Square Branch Construction

27

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Union Square Branch Construction

28

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

29

Accessing the Corridor

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Construction Haul Road

30

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Clearing & Grubbing

31

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Clearing & Grubbing

32

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Construction Mitigation

33

• Noise Mitigation Plan – Will comply with local city & town noise ordinances

• Dust Control Plan

– Wheel Washers

– Street Sweeping

– Calcium Chloride

• Rodent Control Plan

• Preconstruction Surveys

• Soil Testing & Characterization

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

Night & Weekend Work

34

Night Work at the MBTA Boston Engine Terminal

4:00 AM – 1:30 PM Shift

Weekend Work in 2015 & 2016

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

GLX Upcoming Meetings

35

• GLX Working Group Meeting Oct. 2, 2014

4-6 PM, Center for the Arts Armory, Somerville

• Upcoming Station Design Public Meetings:

o Lechmere October 2014

o Washington Street & Union Square October 2014

#36 PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014

How to Stay Informed and Follow the Progress of Construction

MassDOT GLX Website: • www.greenlineextension.com

• 3 Week “Look Ahead” Schedules

• Construction Progress Photos

• Traffic Updates

• Public Meetings

• Sign-up for Regular Email Blasts

36

Contact Information:

E-Mail: [email protected]

Emergency Construction Hotline

• 1-855-GLX-INFO

• 24/7 Coverage

PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014