ATTENTION RESIDENTS AND BUSINESS OWNERS In preparation for construction of Phase 2 of the Expo Light Rail Line, work crews will be conducting soil removal and grading within the Expo Right-of-Way (ROW) in the cities of Los Angeles and Santa Monica. The work is being managed and performed by the Expo Phase 2 design-build contractor Skanska-Rados Joint Venture (SRJV), and its subcontractors. What: Soil removal and grading necessary for the start of construction When: Monday, May 14, through Friday, July 20, 2012 (No work will take place on weekends) Work Hours: 7:00 a.m. to 6:00 p.m., Monday through Friday in the City of Los Angeles 8:00 a.m. to 6:00 p.m., Monday through Friday in the City of Santa Monica Where: Work will be done within the Expo ROW, throughout the project alignment between Bagley Avenue in the City of Los Angeles and 17th Street in the City of Santa Monica Work Description: Construction crews will be conducting soil removal and grading within the right-of-way. Equipment used for these construction activities will include: excavators, compaction rollers, front-end loaders, backhoe loaders, bulldozers and trucks. Work crews will perform excavations under local, state and federal regulations and in a manner that does not harm the public or the environment. The California Department of Toxic Substances Control (DTSC) will oversee this process and ensure that it is performed accordingly. Advisories/Mitigation Measures: Dust Control - The following measures will be implemented to prevent fugitive dust from leaving the site: the use of watering trucks to wet the soil, covering truck loads with tarps before they leave the work site, and the designation of a specific entrance and exit for all equipment and trucks hauling debris where an anti-soil tracking device will be installed. Additionally, street sweepers will be used to keep clear the streets of debris as needed. Soil Sampling and Analysis - In 2010, the soil in the Expo ROW was sampled for soil contaminants. Arsenic, lead, petroleum hydrocarbons, polychlorinated biphenyls, polycyclic aromatic hydrocarbons, and volatile organic compounds were found at various locations and depths below the ground surface in the Expo ROW. There is no immediate health risk to the residents or businesses in the area; however, DTSC recommended that the contaminated soil be removed to prevent the potential for future exposure. California Department of Toxic Substances Control (DTSC) - is responsible for the oversight of the soil removal process to ensure that the Expo Authority and its contractor, SRJV and their subcontractors perform the excavations under local, state, and federal regulations. All necessary precautions will be implemented to make certain that site workers and the community are safe during the soil removal activities. If you have questions or would like more information, please contact the Expo Construction Authority or DTSC. You may contact: Yvette LaDuke, Public Participation Specialist, at 818-717-6569 or via email: [email protected] or the AQMD Complaint Hotline at (909)288-7664. Traffic Impacts/Access: Trucks used to haul away debris will occasionally interrupt traffic as they enter and exit the ROW; however, flagmen will be used to safely direct drivers to minimize traffic disruptions. Access to businesses and residences will be maintained throughout all construction activities. Please obey all posted parking restriction signs and construction signs; do not enter the construction work zone. Expo Light Rail Line Government/Community Relations Contact Information Glenda Y. Silva Exposition Construction Authority Tel. 213-243-5534 [email protected] Jim Kennedy Skanska-Rados Joint Venture Tel. 310-220-9329 [email protected] Hotline: 213-922-EXPO Website: www.BuildExpo.org PRE-CONSTRUCTION NOTICE SOIL REMOVAL and GRADING Date Issued: May 7, 2012

PRE CONSTRUCTION NOTICE SOIL REMOVAL and GRADING · ATENCIÓN RESIDENTES Y COMERCIANTES. En preparación para la construcción de la Fase 2 de la Línea de Tren Ligero Expo, las cuadrillas

Embed Size (px)

Citation preview

ATTENTION RESIDENTS AND BUSINESS OWNERS

In preparation for construction of Phase 2 of the Expo Light Rail Line, work crews will be conducting soil removal and grading within the Expo Right-of-Way (ROW) in the cities of Los Angeles and Santa Monica. The work is being managed and performed by the Expo Phase 2 design-build contractor Skanska-Rados Joint Venture (SRJV), and its subcontractors.

What: Soil removal and grading necessary for the start of construction When: Monday, May 14, through Friday, July 20, 2012 (No work will take place on weekends)

Work Hours: 7:00 a.m. to 6:00 p.m., Monday through Friday in the City of Los Angeles 8:00 a.m. to 6:00 p.m., Monday through Friday in the City of Santa Monica Where: Work will be done within the Expo ROW, throughout the project alignment between Bagley Avenue in the City of Los Angeles and 17th Street in the City of Santa Monica

Work Description: Construction crews will be conducting soil removal and grading within the right-of-way. Equipment used for these construction activities will include: excavators, compaction rollers, front-end loaders, backhoe loaders, bulldozers and trucks. Work crews will perform excavations under local, state and federal regulations and in a manner that does not harm the public or the environment. The California Department of Toxic Substances Control (DTSC) will oversee this process and

ensure that it is performed accordingly.

Advisories/Mitigation Measures:

Dust Control - The following measures will be implemented to prevent fugitive dust from leaving the site: the use of watering trucks to wet the soil, covering truck loads with tarps before they leave the work site, and the designation of a specific entrance and exit for all equipment and trucks hauling debris where an anti-soil tracking device will be installed. Additionally, street sweepers will be used to keep clear the streets of debris as needed.

Soil Sampling and Analysis - In 2010, the soil in the Expo ROW was sampled for soil contaminants. Arsenic, lead, petroleum hydrocarbons, polychlorinated biphenyls, polycyclic aromatic hydrocarbons, and volatile organic compounds were found at various locations and depths below the ground surface in the Expo ROW. There is no immediate health risk to the residents or businesses in the area; however, DTSC recommended that the contaminated soil be removed to prevent the potential for future exposure.

California Department of Toxic Substances Control (DTSC) - is responsible for the oversight of the soil removal process to ensure that the Expo Authority and its contractor, SRJV and their subcontractors perform the excavations under local, state, and federal regulations. All necessary precautions will be implemented to make certain that site workers and the community are safe during the soil removal activities. If you have questions or would like more information, please contact the Expo Construction Authority or DTSC. You may contact: Yvette LaDuke, Public Participation Specialist, at 818-717-6569 or via email: [email protected] or the AQMD Complaint Hotline at (909)288-7664.

Traffic Impacts/Access:

Trucks used to haul away debris will occasionally interrupt traffic as they enter and exit the ROW; however, flagmen will be used to safely direct drivers to minimize traffic disruptions.

Access to businesses and residences will be maintained throughout all construction activities.

Please obey all posted parking restriction signs and construction signs; do not enter the construction work zone.

Expo Light Rail Line Government/Community Relations

Contact Information Glenda Y. Silva

Exposition Construction Authority Tel. 213-243-5534

[email protected]

Jim Kennedy Skanska-Rados Joint Venture

Tel. 310-220-9329 [email protected]

Hotline: 213-922-EXPO Website: www.BuildExpo.org

PRE-CONSTRUCTION NOTICE

SOIL REMOVAL and GRADING

Date Issued: May 7, 2012

ATENCIÓN RESIDENTES Y COMERCIANTES

En preparación para la construcción de la Fase 2 de la Línea de Tren Ligero Expo, las cuadrillas de obreros conducirán retiro del suelo y van a nivelar la vía dentro del derecho-de-paso Exposition en la ciudades de Los Ángeles y Santa Mónica. El contratista para Expo Fase 2 Skanska-Rados Joint Venture (SRJV) (una Empresa Conjunta Skanska-Rados) mantendrá y realizará esta obra junto con sus subcontratistas. Qué: Retiro de suelo y nivelado necesarios para el inicio de la construcción Cuándo: lunes, 14 de mayo de 2012 hasta el viernes, 20 de julio de 2012 (No se trabajará durante los fines de semana) Horarios: De 7:00 a.m. a 6:00 p.m., lunes a viernes en la Ciudad de Los Ángeles De 8:00 a.m. a 6:00 p.m., lunes a viernes en la Ciudad de Santa Mónica Dónde: El trabajo se realizará dentro el derecho-de-paso Exposición desde Bagley Ave en Los Ángeles hasta 17th Street en

Santa Mónica Descripción del la obra: Las cuadrillas de obreros estarán excavando y nivelando dentro el derecho-de-paso. La maquinaria utilizada para estas actividades de construcción incluirán: excavadoras/retroexcavadoras, cargadores frontales, niveladoras pequeñas y camiones. Los equipos de trabajo llevarán a cabo este trabajo bajo las regulaciones locales, estatales y federales y de una manera que no perjudique el público o el medio ambiente. El Departamento de Control de Sustancias Tóxicas (DTSC) se encargará de supervisar este proceso y asegurarse de que sea

realizado por consiguiente. Asesorías/Medidas de Mitigación:

Control del Polvo - Las siguientes medidas serán implementadas para evitar que el polvo fugitivo salga del sitio: el uso de camiones

de riego para humedecer el suelo, cubriendo las cargas de camiones con lonas antes de salir del lugar de trabajo, y la designación de una entrada específica y salida de todos los equipos y camiones que transportan los desechos en un dispositivo de seguimiento contra el suelo será instalado. Además, se utilizará barrenderos para mantener limpiar las calles de escombros, según sea necesario.

Muestras y Análisis del Suelo - En 2010, el suelo del derecho-de-paso Expo fue analizado para contaminantes del suelo. El arsénico,

plomo, hidrocarburos de petróleo, bifenilos policlorados, hidrocarburos aromáticos policíclicos y los compuestos orgánicos volátiles se encontraron en varios lugares y profundidades por debajo de la superficie del suelo en el derecho-paso-de paso Expo. No existe ningún riesgo inmediato para la salud de los residentes o negocios en el área, sin embargo, el DTSC recomendó que el suelo contaminado sea eliminado para evitar la posibilidad de una futura exposición.

Departamento de Control de Sustancias Tóxicas de California (DTSC) - es responsable de la supervisión del proceso de excavación

y nivelado para asegurarse de que la Autoridad de Expo y su subcontratista, SRJV y sus subcontratistas realicen las excavaciones bajo regulaciones locales, estatales y federales. Se aplicarán todas las precauciones necesarias para asegurarse de que los trabajadores del sitio y la comunidad estén seguros durante las actividades de remoción de tierra. Si tiene preguntas o desea obtener más información, póngase en contacto con Autoridad de Expo o SRJV. O puede comunicarse con: Yvette LaDuke, Especialista en Participación Pública, DTSC al 818-717-6569 o por correo electrónico: [email protected] o llamando a la Línea Directa de Quejas de AQMD al (909) 288-7664 .

Impactos de Tráfico /Acceso:

Los camiones utilizados para transportar desechos ocasionalmente interrumpirán el tráfico a medida que entran a la vía de paso. Sin

embargo, habrá directores de tráfico para dirigir con seguridad a los conductores para minimizar las interrupciones del tráfico.

El acceso a los comercios y residencias se mantendrá a lo largo de todas las actividades de construcción.

Por favor no entre a la zona de construcción y obedezca todos los carteles fijados.

(Los horarios de construcción están sujetos a cambios por diversas razones, incluyendo pero sin limitarse a: condiciones climáticas,

emergencias imprevistas y otras causas naturales)

Línea de Expo Light Rail Relaciones del Gobierno/Comunidad

Información de Contacto Glenda Y. Silva

Exposition Construction Authority Tel. 213-243-5534

[email protected]

Jim Kennedy Skanska-Rados Joint Venture

Tel. 310-220-9329 [email protected]

Linea Directa: 213-922-EXPO Sitio Web: www.BuildExpo.org

AVISO DE CONSTRUCCION

RETIRO DEL SUELO y NIVELADO

Proporcionado: 7 de mayo de 2012

Phase 2 of the Expo Light Rail LineMap of Soil Removal Areas

Map Key

= Soil Removal Areas

Area 2: Stewart St toCentinela Ave

Area 1: East of 26th St

CULVER

Phase 2 of the Expo Light Rail LineMap of Soil Removal Areas

Map Key

= Soil Removal Areas

Area 1: Centinela Aveto Pico Blvd

Area 2: SepulvedaBlvd to Overland Ave

Area 3: Bagley Ave toMotor Ave