PRaP Operational Support Team Guidance

for

Reducing Parental Conflict

V1.0

Date 29/01/2019

Our contact details:-

[email protected]

0345 604 5406 option 2

Opening times 9am – 4pm

Page 2: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

1) Introduction

This guidance has been created to assist you in ensuring you are using the PRaP system correctly, in accordance with the specific provision that you are delivering.

For the Reducing Parental Conflict provision, you should make reference to the process flow below that gives specific examples of when activities should take place and in what order they should take place.

You should use this guide in conjunction with the programme specific guidance

High Intensity

Shipping Order

Guidance Step

Line Description Information Validation

1st 3 1 Start Firstly input a Unique Reference this is something to easily identify this ASN to you. Date 1 This is the date the Participants attends the Initial assessment meeting Date 2 This is the same date as date 1

N/A

2nd 4 2 RPC 50% Outcome Note only for High Intensity

RPC 50% Outcome this must be claimed at the mid-point of the course agreed on the Initial Assessment Firstly, input a Unique Reference this is something to easily identify this ASN to you. Date 1 The course start date Date 2 The agreed 50% midpoint Date

Page 3: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

3rd

5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify this ASN to you. Date 1 The course start date Date 2 The course completion date

4th 6 4 RPC End This must be claimed, when the Participant has left provision or completed the course. Firstly input a Unique Reference this is something to easily identify this ASN to you. Date 1 The last day on provision Date 2 The same date as Date1

Moderate Intensity

Shipping Order

Guidance Step

Line Description Information Validation

1st 3 1 Start Firstly input a Unique Reference this is something to easily identify this ASN to you. Date 1 This is the date the Participants attends the Initial assessment meeting Date 2 This is the same date as date 1

N/A

Page 4: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

2nd

5 2 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify this ASN to you. Date 1 The course start date Date 2 The course completion date

3rd 6 3 RPC End This must be claimed, when the Participant has left provision or completed the course. Firstly input a Unique Reference this is something to easily identify this ASN to you. Date 1 The last day on provision Date 2 The same date as Date1

Note – the following details input for the High Intervention with Line numbers differing for the Moderate Intervention

2) Acknowledging Referrals in PRaP.

Following referral action from DWP Referral team, you will be able to view the referrals the following day. The Acknowledging process must take place within three days of the receipt of the referral. It is therefore important that you log on to PRaP on a daily basis to check for referrals that require acknowledging. The instructions below show how to acknowledge referrals by selecting the contract and dropdown. Alternatively, you can use the advance search facility and search by contract and date of referral. Details can be found on the UPK ‘Help’ function within PRaP. To complete this activity you must:

a) Log onto PRaP via the DWP Authenticate. b) On the home screen click on the orders tab. c) Select the radio button next to the appropriate contract.

Page 5: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

d) Select the view dropdown menu and change this to purchase orders to acknowledge

e) Select Go

You will now be presented with a list of referrals that require acknowledgment

f) Select the radio button next to the purchase order that requires acknowledgment.

g) Select acknowledge button

You will be presented with the Purchase Order summary.

h) You will need to check that this Participant is on the appropriate opportunity.

Tip: Always look at the Status, as this will indicate what the status of the purchase order is at. The Purchase order shown requires acknowledgment.

Page 6: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

- If the Participant has been incorrectly referred by DWP Referral Team, select Reject Entire Order button. You will then be taken to a summary screen where you will need to identify a reason for rejecting.

- If the Participant is on the correct opportunity and you have competed all the necessary arrangements with the Participant you need to select accept entire order button.

Following pressing the accepting the entire order button you will be presented with a final confirmation screen.

Page 7: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

i) If you are satisfied that this is the correct Participants on the correct provision then you will need to select submit button.

You will be informed that the purchase order has been acknowledged and you will be given the opportunity to return to purchase orders.

If you are satisfied with the acknowledging the referral you must now claim line one immediately to complete the acknowledge and start actions see section 3.

If a customer does not Start or Help! I have acknowledged the referral in error

a) From the home tab enter the PO number and select go b) Select the radio button. Please note that the status should be accepted.

Page 8: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

c) Select Request Cancellation button d) Select Cancel entire order button e) Select a reason from the dropdown menu

Page 9: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

f) Select submit.

A confirmation page should now be displayed stating that Your order has been cancelled.

Page 10: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

3) Claiming a Start (line 1)

Once you have taken the acknowledgment action you will now be able to take the action to claim a start line (Line 1)

To complete this activity, you must:

a) Log onto PRaP via the DWP Authenticate. b) Select the shipments tab c) Select create advance shipments link

You will now be presented with the advanced search screen

d) Enter the appropriate PO number e) Select Go

You will now be presented with all the available lines for that PO number.

f) Select the radio button on line 1 g) Select add to shipment notice button

The create shipment notice screen will now be displayed

h) Select shipment header tab

Page 11: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

Shipment information will now be displayed

i) Enter a unique reference number in the unique reference number field.

Enter date 1. This is the date the Participants attends the Initial assessment meeting. j) Enter date 2. The same date as Date 1 k) Read the DWP declaration located at the top of the screen l) Select the Accept DWP declaration and submit button if you are satisfied with

the information you have entered.

You will now be presented with a confirmation screen.

Tip: This must not contain any national insurance numbers; it must be unique and must not be repeated, on any other lines claimed.

Page 12: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

4) Claiming RPC 50% Outcome (Line 2 High Intensity only)

In order to do this you will have taken all necessary action.

For example, you must ensure that the Participant has reached the 50% midpoint.

This line must be claimed before the automatic end is processed 365 days after the start for both types of support.

To complete this activity you must:

a) Log onto PRaP via the DWP Authenticate. b) Select the shipments tab c) Select create advance shipments link

You will now be presented with the advanced search screen

d) Enter the appropriate PO number e) Select Go

You will now be presented with, all the available lines for that PO number.

f) Select the outcome line g) Select add to shipment notice button

Page 13: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

The create shipment notice screen will now be displayed

h) Select shipment header tab

Shipment information will now be displayed

m) Enter a unique reference number in the unique reference number field.

n) Enter date 1. This must be the course start date o) Enter date 2. This must be the agreed mid-point date

Please note that both dates must occur in the past, dates cannot be anticipated future dates.

p) Read the DWP declaration located at the top of the screen Select the Accept DWP declaration and submit button if you are satisfied with the information you have entered.

You will now be presented with a confirmation screen.

Tip: This must not contain any national insurance numbers; it must be unique and must not be repeated, on any other lines claimed.

Page 14: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

5) Claiming Outcome (Line 2 Moderate & 3 High)

In order to do this you will have taken all necessary action.

For example, you must ensure that the 50% midpoint has been claimed for the High Intervention.

This line must be claimed before the automatic end at 365 day after the start.

To complete this activity, you must:

i) Log onto PRaP via the DWP Authenticate. j) Select the shipments tab k) Select create advance shipments link

You will now be presented with the advanced search screen

l) Enter the appropriate PO number m) Select Go

You will now be presented with, all the available lines for that PO number.

n) Select the outcome line o) Select add to shipment notice button

The create shipment notice screen will now be displayed

Page 15: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

p) Select shipment header tab

Shipment information will now be displayed

q) Enter a unique reference number in the unique reference number field.

r) Enter date 1. This must be the course start date s) Enter date 2. This must be the course end date

Please note that both dates must occur in the past, dates cannot be anticipated future dates.

t) Read the DWP declaration located at the top of the screen Select the Accept DWP declaration and submit button if you are satisfied with the information you have entered.

You will now be presented with a confirmation screen.

6) Claiming an End Line (Line 3 Moderate & Line 4 High)

This line should only be claimed, when a Participant has left provision or they have achieved an outcome.

You will not be able to claim a job outcome before claiming an end line.

Tip: This must not contain any national insurance numbers; it must be unique and must not be repeated, on any other lines claimed.

Page 16: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

Please note that Job details can also be entered onto PRaP by selecting the orders tab and conducting an advance search. The guidance below shows entering Job details via shipments.

To complete this activity you must:

a) Log onto PRaP via the DWP Authenticate. b) Select the shipments tab c) Select create advance shipments link

You will now be presented with the advanced search screen

d) Enter the appropriate PO number e) Select Go

You will now be presented with all the available lines for that PO number.

Page 17: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

Select line 4

f) Enter a unique reference number in the unique reference number field.

g) Enter date 1. The last day the Participants participated on the provision or the day before they found work whichever is applicable.

h) Enter date 2.This should be the same as date 1

i) Select the magnifying glass next to the end reason field

You will now be presented with a list of end reasons.

Tip: This must not contain any national insurance numbers; it must be unique and must not be repeated, on any other lines claimed.

Page 18: PRaP operational support team guidance for Reducing Parental … · 2019-03-28 · 3rd 5 3 RPC Outcome RPC Outcome Firstly input a Unique Reference this is something to easily identify

j) Select the appropriate reason. Eg Completed provision

k) Once you are satisfied that all the fields have been selected read the DWP declaration and select Accept DWP declaration and submit button.

You will now be presented with a confirmation screen.

a. The end will automatically close at 12 months for both High Intervention and Moderate Intervention

Once the end line has closed you will not be able to claim any outcomes without undertaking PRaP14 action.