Practical Intervention Barriers A barrier is defined as a means of containing wellbore pressure and fluids. Two effective barriers are required for most intervention operations. Consider when barriers are effective (and when they are not) and how to back them up for safety. Must be rated to the maximum pressure that can be encountered. 8/25/2015 1 George E. King Engineering GEKEngineering.com

Practical Intervention Barriers

Embed Size (px)

DESCRIPTION

N/A

Citation preview

Page 1: Practical Intervention Barriers

Practical Intervention Barriers

• A barrier is defined as a means of containing wellbore pressure and fluids.

• Two effective barriers are required for most intervention operations.

• Consider when barriers are effective (and when they are not) and how to back them up for safety.

• Must be rated to the maximum pressure that can be encountered.

8/25/2015 1 George E. King Engineering

GEKEngineering.com

Page 2: Practical Intervention Barriers

Common Barriers

• Kill weight fluid column (not just a fluid column) – monitored and tested

• Pipe rams when pipe is in the well • Blind/Blind-Shear when no pipe is in the well • Master valve when pipe is not in the well • CT Flapper valves (dual flappers = one barrier) • Stuffing box/Stripper Rubber • Downhole plugs • Grease seal/ram for braided line (both are one

barrier)

8/25/2015 2 George E. King Engineering

GEKEngineering.com

Page 3: Practical Intervention Barriers

1. Nipple Down Tree

2. Nipple Up BOP

8/25/2015 3 George E. King Engineering

GEKEngineering.com

Page 4: Practical Intervention Barriers

3-2006

TEST LINETEST LINE

Flanged Choke

Ported w/1-1/2”

NP & Threads

& 2- 10K Needle Valves

Hammer Union

& Bull Plug

3-2006

TEST LINETEST LINE

3-20063-2006

TEST LINETEST LINE

Flanged Choke

Ported w/1-1/2”

NP & Threads

& 2- 10K Needle Valves

Hammer Union

& Bull Plug

What’s Left?

1. Hook up test and kill lines.

2. Test.

8/25/2015 4 George E. King Engineering

GEKEngineering.com

Page 5: Practical Intervention Barriers

Kill Weight Fluid

KWF = Formation Pore Pressure (psi) / (0.052 * TVD to mid perfs (ft))

where: KWF = kill weight fluid in ppg

TVD

The kill weight fluid must occupy both the annulus and the tubing with no voids or other fluids involved.

If the density and level of the fluid are not monitored, can the fluid be an effective barrier?

8/25/2015 5 George E. King Engineering

GEKEngineering.com

Page 6: Practical Intervention Barriers

Difference between Surface and Downhole Barriers

• A surface barrier prevents escape of fluids from the well.

• A downhole barrier may also prevent cross-flow between formations.

8/25/2015 6 George E. King Engineering

GEKEngineering.com

Page 7: Practical Intervention Barriers

The barrier during drilling is a well control barrier that has both hydrostatic and mechanical control points.

A column of kill weight fluid, monitored and tested, is a common active barrier.

8/25/2015 7 George E. King Engineering

GEKEngineering.com

Page 8: Practical Intervention Barriers

During wireline intervention, the control method is pressure control with two or more barriers.

The barriers for wireline include:

1. Grease or oil seal on the wire (for dynamic sealing);

2. Packoff for static application

3. Blind/Shear rams

4. Master valve (can cut some wire, but poses a risk of valve damage).

8/25/2015 8 George E. King Engineering

GEKEngineering.com

Page 9: Practical Intervention Barriers

Barriers for Intervention with Coiled Tubing

Barriers include:

1. Stuffing Box

2. Coiled Tubing BOP

3. Annular Preventer (for sealing around BHA string)

4. Pipe ram below circulating cross or Tee.

5. Master Valves – when CT and BHA are above the top Master Valve.

8/25/2015 9 George E. King Engineering

GEKEngineering.com

Page 10: Practical Intervention Barriers

Barriers for Producing Wells – usually only one barrier for many areas:

1. Almost all flow/gathering lines, separators and pipelines.

2. The flow cross, choke body and other areas above the tubing hanger

3. Below the tubing hanger for gas lift supply

4. At any open shoe with gas lift supply

5. Uncemented casing below the packer

8/25/2015 10 George E. King Engineering

GEKEngineering.com

Page 11: Practical Intervention Barriers

Live Well Workovers

• Top Hole - plug (WL or CT) set at or below packer - top of well is isolated.

Used for:

press test

pickle/cleanout

tubing replacement

fluid unload/swap

equalizing plug

8/25/2015 11 George E. King Engineering

GEKEngineering.com

Page 12: Practical Intervention Barriers

Typical Conditional Barriers

• Considered a barrier during certain operations but not at other times.

• Examples: – Pipe rams – barrier only when pipe is in the well

– Blind ram, master valve, stripper rubber – barrier only when pipe is out of the well

– Braided line rams – barrier only with grease injection

8/25/2015 12 George E. King Engineering

GEKEngineering.com

Page 13: Practical Intervention Barriers

8/25/2015 13 George E. King Engineering

GEKEngineering.com

Page 14: Practical Intervention Barriers

Ram blocks

Lower left – slip blocks

Lower Right – seal blocks

Upper Right – shear or cutter blocks

8/25/2015 14 George E. King Engineering

GEKEngineering.com

Page 15: Practical Intervention Barriers

8/25/2015 15 George E. King Engineering

GEKEngineering.com

Page 16: Practical Intervention Barriers

Greased ram section in a BOP prior to the job. Effect of excess grease?

8/25/2015 16 George E. King Engineering

GEKEngineering.com

Page 17: Practical Intervention Barriers

8/25/2015 17 George E. King Engineering

GEKEngineering.com

Page 18: Practical Intervention Barriers

CT Crushed by ram closure – now, how do you recover it?

Rams for CT must:

1. Center the CT in the BOP body

2. Center the CT in the ram element

8/25/2015 18 George E. King Engineering

GEKEngineering.com

Page 19: Practical Intervention Barriers

BOP accumulator – pressure source

8/25/2015 19 George E. King Engineering

GEKEngineering.com

Page 20: Practical Intervention Barriers

8/25/2015 20 George E. King Engineering

GEKEngineering.com

Page 21: Practical Intervention Barriers

8/25/2015 21 George E. King Engineering

GEKEngineering.com

Page 22: Practical Intervention Barriers

8/25/2015 22 George E. King Engineering

GEKEngineering.com

Page 23: Practical Intervention Barriers

An effective BOP rig-up. Note dual valves and flow control below the flow cross.

8/25/2015 23 George E. King Engineering

GEKEngineering.com

Page 24: Practical Intervention Barriers

8/25/2015 24 George E. King Engineering

GEKEngineering.com

Page 25: Practical Intervention Barriers

Unusual Cases

• When running a BHA that cannot be sealed with a pipe ram or cut with a blind shear. Is a special barrier needed for the BHA?

• When changing the elements on a ram or stripper rubber. Is a backup needed?

8/25/2015 25 George E. King Engineering

GEKEngineering.com

Page 26: Practical Intervention Barriers

The Two Barrier Rule

• Barriers may be the same in some instances.

• Both must be capable of controlling the full well pressure.

• Many barriers are conditional – may need back-up.

8/25/2015 26 George E. King Engineering

GEKEngineering.com

Page 27: Practical Intervention Barriers

Some Special Cases

• Snubbing or hydraulic workover – The two (minimum) pipe rams are barriers, but a blind-shear is required for a second barrier while pipe is in the well.

• What is needed when an pipe ram element has to be changed?

• A second blind or blind-shear or master valve or other device is required when pipe is out of the well.

8/25/2015 27 George E. King Engineering

GEKEngineering.com

Page 28: Practical Intervention Barriers

8/25/2015 28 George E. King Engineering

GEKEngineering.com

Page 29: Practical Intervention Barriers

Pipe seal elements

8/25/2015 29 George E. King Engineering

GEKEngineering.com

Page 30: Practical Intervention Barriers

Hydraulic workover unit showing the gas bypass tube between pipe rams.

8/25/2015 30 George E. King Engineering

GEKEngineering.com

Page 31: Practical Intervention Barriers

Special cases, continued

• Large BHA or BHA that cannot be cut.

– Annular preventer?

– Downhole valves (SSSV as a barrier????) – SSSV’s are not a good barrier if an object can be dropped from the tool. A dropped object can breach/break the seal offered by flapper type SSSV.

– Pressure operated downhole valves

8/25/2015 31 George E. King Engineering

GEKEngineering.com

Page 32: Practical Intervention Barriers

Special cases, continued

• Fracturing Tree Saver

– Hydraulic deployment

– Second set of valves – temporarily replaces wellhead valve control

– Stinger with seal isolates and “locks-out” wellhead valves

8/25/2015 32 George E. King Engineering

GEKEngineering.com

Page 33: Practical Intervention Barriers

Tree Saver – isolates existing wellhead with hydraulically deployed stinger with external seals and second set of valves.

Frac Iron Connection Remote operated

master valve

Manual operated master valve

Hydraulic cylinders

Mandrel or stinger – with seals on exterior

Hydraulic pistons

Existing master valve on well

Well master valve is closed

Vent Valve

Tree saver inserted and locked down.

8/25/2015 33 George E. King Engineering

GEKEngineering.com

Page 34: Practical Intervention Barriers

Special Cases, continued

• What is stability of the barrier?

– To outgassing (seal face failure)

– To high or low temperatures (does it weaken barrier?)

– To corrosion (components weakened by attack?)

– To erosion – erosion of sealing surfaces

– To high or low pressure spikes

– To high or low tensile loads

8/25/2015 34 George E. King Engineering

GEKEngineering.com

Page 35: Practical Intervention Barriers

Special Example - Inflatable Packers

• Are they barriers?

• What is the reliability?

• Do they stay put?

• Has a great deal to do with how much they are expanded and where they are placed. – Good reliability when set in pipe

– Good reliability when placement “slide” is short (less than 1000 ft)

– Good reliability when expansion from initial to set is less than 2x. 8/25/2015 35

George E. King Engineering GEKEngineering.com

Page 36: Practical Intervention Barriers

Quiz - Barriers

1. What type of equipment must not be sheared in a well control attempt?

2. What type of event or action may render the following barriers useless?

a. Blind ram, no pipe in the hole.

b. Pipe ram w/ pipe in the hole.

c. Stripper rubber on Coiled Tubing.

d. Grease injector with E-line in the well.

e. Flappers on coiled tubing.

3. For each challenge in problem 2, what is a possible solution?

8/25/2015 36 George E. King Engineering

GEKEngineering.com

Page 37: Practical Intervention Barriers

Quiz – Barrier Failure Recovery from Problem #2.

Failure Type Cause Recovery

Blind Ram, face seals

destroyed.

Pipe Ram, w/ pipe in

hole, no seal.

Stripper rubber leaking

on CT

Grease leaking on E-line

grease injector, not

holding pressure.

Flappers not preventing

backflow on cleanout.

8/25/2015 37 George E. King Engineering