35
17 July 2017 Port Authority of New York & New Jersey Attn: William Shalewitz, F.O.I.A. Officer 4 World Trade Center 150 Greenwich Street New York, N.Y. 10007 RE: Freedom of Information Act Request Mr. Shalewitz, This request is made pursuant to 5 U.S.C. 552, Department of Defense Directive 5400.7 and 5400.7-R (DoD Freedom of Information Act Program), and the Department of the Army, DoD Freedom of Information Act Regulations, 32 C.F.R. 518 seq., with inquiries regarding the following project(s): Project Title Solicitation Number Bid Date Low Bidder GL Contr. # Port Newark Berths 26/28/32/34 654 – 558 4/20/2017 Cashman 15686 Pursuant to above listed regulations and provisions, please forward copies of: 1) DAILY PRODUCTION REPORTS of dredging operations, (e.g., Eng form 27A, 4267 or 430) 2) Any/All Pay Estimates, up to and including FINAL PAY ESTIMATE 3) BID ABSTRACTS, showing a BREAKDOWN of all UNIT PRICES and LUMP SUM ITEMS for all bidders 4) DAILY QUALITY CONTROL REPORTS 5) CONTRACT MODIFICATIONS 6) NTP, or NOTICE TO PROCEED 7) CONTRACT AWARD Please forward copies of these documents to my attention at the address listed above via FEDERAL EXPRESS - 3 DAY EXPRESS SAVER, billing third party, Account PRA #18946

PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

  • Upload
    others

  • View
    3

  • Download
    1

Embed Size (px)

Citation preview

Page 1: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

17 July 2017

Port Authority of New York & New Jersey Attn: William Shalewitz, F.O.I.A. Officer 4 World Trade Center 150 Greenwich Street New York, N.Y. 10007

RE: Freedom of Information Act Request

Mr. Shalewitz,

This request is made pursuant to 5 U.S.C. 552, Department of Defense Directive 5400.7 and 5400.7-R (DoD Freedom of Information Act Program), and the Department of the Army, DoD Freedom of Information Act Regulations, 32 C.F.R. 518 seq., with inquiries regarding the following project(s):

Project Title Solicitation Number Bid Date Low Bidder GL Contr. #

Port Newark Berths 26/28/32/34 654 – 558 4/20/2017 Cashman 15686

Pursuant to above listed regulations and provisions, please forward copies of:

1) DAILY PRODUCTION REPORTS of dredging operations, (e.g., Eng form 27A, 4267 or430)

2) Any/All Pay Estimates, up to and including FINAL PAY ESTIMATE3) BID ABSTRACTS, showing a BREAKDOWN of all UNIT PRICES and LUMP SUM

ITEMS for all bidders4) DAILY QUALITY CONTROL REPORTS5) CONTRACT MODIFICATIONS6) NTP, or NOTICE TO PROCEED7) CONTRACT AWARD

Please forward copies of these documents to my attention at the address listed above via FEDERAL EXPRESS - 3 DAY EXPRESS SAVER, billing third party, Account

PRA #18946

Page 2: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

2

Great Lakes is willing and able to pay for any fees involved in forwarding this information to our office. However, if it is found that the charges for compiling this information will exceed $200.00, please advise me before completing this request. We look forward to your timely response (within 20 days), pursuant to 5 U.S.C 552(a)(6) and 32 C.F.R. If you have any questions regarding this request, please contact me directly by phone at (630) 574-2915, by fax at (630) 574-2909 or by e-mail at [email protected]. Thank you in advance for your assistance in this matter. Sincerely, GREAT LAKES DREDGE & DOCK COMPANY

Steven Branson Freedom of Information Acts Facilitator

Page 4: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

Date: 8/14/2017

Report No.: 077

DAILY REPORT OF OPERATIONS

PERMIT /LICENSE:

PROJECT: PANVNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS . TEMP. (F)

12:00 Partly Cloudy 81

PROGRESS SUMMARY ITEM

WORKED HOURS DOWN TIME ESTIMATED VOLUME DREDGED (CY) DREDGE ADVANCE (LF)

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-WATERING SITE(CY}

DREDGE AREA - DREDGING IN PROGRESS BERTH NO. CUT

28 1

EXPLANATION OF DOWNTIME Mobilization

MATERIAL BARGE INFORMATION

. ·sTARTSTATION

16+75 '

· HUMIDITY .. PRECIP. (IN) WINDSPEED. DIRECTION· (%)• (MPH)

67 0.0 6 SE

. DAY . TO DATE .

,.

11 781

7.83 228.8

1,642 172,081 160 18,037

0 51,200

STOP STATION · :sTARTTIME . .ENDTIME ..

22+92 8:45 17:45

LOAD NUMBER . BARGE NAME · BERTH OF ORIGIN . VOLUME BY. .VOLUME BY START TIME ·' END.TIME. · DRAFT . , SURVEY ,·,. i,:' . ,; 'i\' .

90 Rhett 28 1700 NA 8:45 17:45

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ___ _

1 of 3

Page 5: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWNTIME

(DREDGE/DMMA)

Survey Vessel Dredge 12 Crew Boat Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORl<ED

Management :··: ·.·· ' . :<·: . ·• ... ··,·: ·- .. , .

.. . .- ...

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 11.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge \: . >' >:,:, ) ' ;:: . .:. .:. ·.... ,::·,. >:' . :_;: , .... /:; .. •< ' • .. :'+i.),\i· :. .:x;::::J• ,.::./c,:': ·::··:<:/ ... · ... /.: .. :'>.:<· .. : 1 Cashman Dredge Capt 11.0 1 Cashman Operator 11.0 1 Cashman Mate 11.0 1 Cashman Engineer 11.0 1 Cashman Deckhand 11.0

Tug··DorothycJ:, <-< ···,' . .: . ; ~.: ~ . ·: :' .. /•:/e.rr.:;;;;_ }:\'':'.'<:;:':',y::,;ii? / .. ·. •',!:·; < .'/. ·C: ,·.;r;;·\· '.·:·· .. ,: .. • .. ·; ..••. ./';;'·:

1 Cashman Captain 24 1 Cashman Deckhand 24

Cl'ewBoi:it>'·' •':'·•\:..:'·:,\:,·,·./:,,. ,;: /: :;-:; :· c:ashma'h · , , ·: .'./h;>:f•/···.c .... •(~,:::c,:(:};··· _\;;;\;,·::: //·,. \:•/·,··········:··· :</ :: ·-· ··. ._: ;; ... ~,_; -:-..-.~.. ..-_ -·. ,·;

1 Cashman Captain 11.0 1 Cashman Deckhand 11.0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of 3

Page 6: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

~. ASH~!All~ !DIREDG8ti"-.!JG

Date: 8/15/2017 Report No.: 078

DAILY REPORT OF OPERATIONS

PERM IT /LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F) HUMIDITY • PRECIP. (IN) ·. WIND SPEED DIRECTION

(%) · (MPH) .

12:00 Mostly Cloudy 74 68 0.5 12 s

PROGRESS SUMMARY ITEM DAY , .. TO DATE

WORKED HOURS 12 793

DOWNTIME 5.25 234.0 ESTIMATED VOLUME DREDGED {CY) 4,152 176,017

DREDGE ADVANCE (LF) 260 1,253,217

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-1,800 53,000

WATERING SITE(CY)

DREDGE AREA· DREDGING IN PROGRESS BERTH NO, CUT START STATION STOP STATION:. . START TIME .. 'ENDTIME

28 1 13+40 11+55 9:30 16:00 26 1 11+55 10+85 16:00 17:45

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER · .BARGE NAME BERTH OF ORIGIN .. VOLUME BY . VOLUME BY· STARTTIME . •. END TIME·

.. . DRAFT SURVEY .: .

91 Michelle D 28 1900 NA 9:30 16:00 92 Kelly 28/26 2000 NA 16:00 17:45

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ____ _

1 of 3

Page 7: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWN TIME

(DREDGE/DMMA} Survey Vessel Dredge 12

Crew Boat Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORICED

Management .···. ·. ·--·· : . . . ', .. . '··.'": -·

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge,,:•·• '. '/. ):-:· . . ::. ,,: . .,. .. ·.;: :/:_,;/,'\.: ,: -i:. /i ··':\/,' ··:/,,':/ . . ' ., ·,', ;·, .. _': . .,.:..,.: .•... , .. · .. >·'.:' . .. :

1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1 Cashman Deckhand 12.0

Jug DorothfJ .· . . : .... i.··· :·///?! :'. !/ ::i'.'·.>·"i.' (/'./::Li::,:(_., :::"\\:,. __ \:s\ci.).:(<' .>i:(' /\-•' ·· .. ·.·.:·· ':. : .

1 Cashman Captain 24 1 Cashman Deckhand 24

Crew.Boat,·;,\ .. ::'.:·: .. ::(.::..'(;."./ ··::\ . >·· iicashman: .,:.:./. I :.:.\.:1: / .. ·,.,.:,.· .. ,,,,,:;,,,._::;;;. ;;-;.,c . "'.•:•(' ,·,:··.··_ . {.,;,:a;,:;c.\,.,;\);i(.,_ ,,,,· :-.. ·. 1 Cashman Captain 12.0 1 Cashman Deckhand 12.0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of 3

Page 8: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

Date: 8/16/2017

Report No.: 079

DAILY REPORT OF OPERATIONS

PERMIT /LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F) HUMIDITY PRECIP, (IN) WIND SPEED· DIRECTION

(%) (MPH)

12:00 Mostly Cloudy 87 70 0.0 9 WNW

PROGRESS SUMMARY ITEM DAY 'TO.DATE·· · .. :•.

WORKED HOURS 12 805

DOWNTIME 2.58 236.6

ESTIMATED VOLUME DREDGED (CY) 4,614 180,631

DREDGE ADVANCE (LF) 560 1,309,217

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE· 2,000 55,000

WATERING SITE(CY)

DREDGE AREA - DREDGING IN PROGRESS BERTH NO. CUT . STARTSTATION .· STOP STATION START,TIME · END,TIME',

26 1 11+15 5+50 7:30 17:45

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION BERTH:OF ORIGIN. VOlUME•BY :VOLUrytE;B,~,;:· /ST~RJTIME.-~ /E~DTIM~/

... · · DRAFT . SURVEY ' · . ",.:::·<. LOAD.NUMBER BARGE.NAME

93 Michelle D 26 1900 NA 9:30 15:30

94 Angela D 26 ~:30

NOTES ON BARGE AND BARGE MATERIAL

4791 dewatering barge was noticed half submerged around 06:15 on 8/17.

CQC SYSTEM MANAGER INITIALS:. ___ _

1 of 3

Page 9: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWNTIME

( DREDGE/OM MA)

Survey Vessel Dredge 12 Crew Boat Dredge 12

ON-SITE PERSONNEL HOURS ff of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORKED

Management ·.·.·· ..... > .. · .... •· .. :.· .

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge t /··> •... :.,·.t •<· ..... )./t• U:·:··s•·•·"-\'t< ...... :.;;·, . .:·.;_ /.:.',,· .. , .?<--·f .:-p.-,•.,: .... i:·;:,e::, s:.· 1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1 Cashman Deckhand 12.0

Tug DorothyJ,·.• '•• ,. ': . .. .·,,,,->'.;;·:,. ->()/•:.· >.,.,'.".f:•./>\.\:<· :,) c},f;:' ··,/ ·'>.? {i•!:·<}··>;;;:( .. /•,\,.,-':, 1 Cashman Captain 24 1 Cashman Deckhand 24

Crew/Boat ,, ,:·,; : ( ; : ,·:ii ' ; .iCashma'n/.:., ·;}.c: ,: .\ /' ;':,,;:,,;:.·/_:·,;;,::•. i;: :\ '.''\ :' -.+< \', ,········· .; .. ,, . ' 1 Cashman Captain 12.0 1 Cashman Deckhand 12.0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of 3

Page 10: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

Date:

Report No.: 8/17/2017 080

DAILY REPORT OF OPERATIONS

PERM IT /LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME .CONDITIONS TEMP. (F) HUMIDITY PRECIP. (IN) WIND SPEED. DIRECTION

(%) (MPH)

12:00 Mostly Cloudy 81 66 0.0 13 ESE

PROGRESS SUMMARY ITEM DAY TO DATE

WORKED HOURS 10 815

DOWNTIME 4.00 240.6

ESTIMATED VOLUME DREDGED (CY) 2,785 183,416

DREDGE ADVANCE (LF) 160 1,324,798

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-2,000 57,000

WATERING SITE(CY)

DREDGE AREA - DREDGING IN PROGRESS BERTH NO. CUT START STATION · · .·.·. STOP.STATION · ·START TIME -··END TIME·

28 1 17+50 15+10 7:00 12:35

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME BERTH OF ORIGIN VOLUME BY VOLUMEB'f·· STARTTIME, •END TIME.'

DRAFT SURVEY

94 Angela D 28 1500 -- 14:30 8:50

95 Michelle D 26 1250 -- 9:20 16:00

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ___ _ 1 of 3

Page 11: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWNTIME

(DREDGE/DMMA) Survey Vessel Dredge 12

Crew Boat Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORICED

Managetnent -. -- - '.·: '._ ,:·: __ . -- :, ',. -_,::·. ·-. . : __ :_ . __ \</ _-, -"' \ . ' . "i' ·.··1

•-'·

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 10.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge:, :.: ' ).' >< . -___ ' ·\>_,t.( /}.:. :.: _;,,.:; _\_ --- ' ._.::·:·.:.:: :----- . '.,. )' . ;,· .. -'\\,: ·;:/:}:-'."<:;;,::_; :;,,.,.:, 1 Cashman Dredge Capt 10.0 1 Cashman Operator 10.0 1 Cashman Mate 10.0 1 Cashman Engineer 10.0 1 Cashman Deckhand 10.0

TugDor'othyJ, / > ·:' .. : ',:: -.·--· -/'. i:\ ,, __ ;>:->\- ··,;-' ·i"_ •. ;-;_.-,,:_;,,_:?~:/o-:/_:,- <i ,,,·.··/>_ :a;·)<."-:::.--"··•,:,_->. :'.(>:_, .. ,-•.

1 Cashman Captain 24 1 Cashman Deckhand 24

Crew Boat : -,-- -·- . -~·'.·:;. :~'.,,'), ,· . ,-.. ·--_:_~--_,_'.-\: ,:-,_:.; \,:._:_ '.Cashman /,,_:.·{,·''.:? /.:, \:;•.,, ';:<:t'';\:\'.:,/("i . I,;\ ·_-_;: -,; ·-•: ://:;;;:; -::\;::· :··:.'. :-.--1 Cashman Captain 10.0 1 Cashman Deckhand 10.0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of 3

Page 12: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

Date: 8/18/2017 Report No.: 081

DAILY REPORT OF OPERATIONS

PERMIT /LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F) HUMIDITY PRECIP. (IN) · WIND SPEED DIRECTION

(%) (MPH) 12:00 Rain 81 73 1.6 12 SSW

PROGRESS SUMMARY ITEM DAY TO DATE

WORKED HOURS 12 827 DOWNTIME 8.58 249.2 ESTIMATED VOLUME DREDGED (CY) 996 184,412

DREDGE ADVANCE (LF) 155 1,341,073

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-2,000 182,000

WATERING SITE(CY)

DREDGE AREA - DREDGING IN PROGRESS BERTH NO •. CUT . · START STATION ·. STOP STATION

.. · ;. START TIME ' . END TIME· .·:

28 1 14+30 12+75 7:00 14:00

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME •. BERTH oroRIGIN < VOLUME BY •. VOLUME BY.;: <· START TIME\• •: END TIME .•.

. . DRAFT' ' .. SURVEY,<> ' ( <: ·. ,) . ·. ' 96 Angela D 28 1650 7:00 14:00

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ____ _

1 of 3

Page 13: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWN TIME

(DREDGE/DMMA)

Survey Vessel Dredge 12 Crew Boat Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORKED

Management .

.·. J .. :\:' <"'.: ·-,:·.:c- .. . ..... \ ... · : ..... .·'·. .···. . ' ·.< .· ·, .:·

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge,;•·•·->;. .. ·, ..•. · .. :· ':, .C.\ ,·.;:.:.·; t:'./:.;,,:}1t(f;;\\:c .·,.r.Y:.f<, ·· ·:;,;-<,.·}/! · . '::/. :\.?. ,x_ :·:,:' · ·>;,:,/ ·• ... ···:-· ;, 1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1 Cashman Deckhand 12.0

Tug:DorothyJ'•·•> ·' ... . ..· , ... r ·?··: 0i:\~·r;;•·:.S'..:rs. ·· .. · ..... >/'Jtc,,.,, /"i;\.\C''./,t•·;.,>:.,.; :)··.(,<{::/:? !it)l,,t,Lc: · ··•. _:,,., ... 1 Cashman Captain 24 1 Cashman Deckhand 24

CrewBoati· ·· .. :., .·. ·'',',\': "'.,,i>>•·:':,': ·:'.'!_':\ ... '. cashman::h; •·-1><'.··:/i·:•i;/:??,(.:<•,· ,/.· ::: litii;:f('?~'·<~ .. :<:/ 1 Cashman Captain 12.0 1 Cashman Deckhand 12.0

CQC SYSTEM MANAGER INITIALS: -----2 of 3

Page 14: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

Date: 8/21/2017 Report No.: 082

DAILY REPORT OF OPERATIONS

PERMIT /LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F) HUMIDITY . PRECIP. (IN) WIND SPEED· · DIRECTION

(%) (MPH)

12:00 Rain 88 66 0.0 7 SW

PROGRESS SUMMARY ITEM DAV TO DATE •·

WORKED HOURS 12 839 DOWNTIME 8.05 257.2 ESTIMATED VOLUME DREDGED (CY) 1,491 185,903 DREDGE ADVANCE (LF) 126 1,355,437

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-2,000 184,000

WATERING SITE(CY)

DREDGE AREA - DREDGING IN PROGRESS BERTH NO, CUT · START STATION ; STOP STATION. .. :·.STARTTIME .•· cENDTIME

28 1 12+80 11+50 7:00 10:35

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGENAMF. BERTHOFORIGIN.: VOLUMEBY 'VOLUME~Y ... /STARTTIME; ENDTIME:

. ' ·· .DRAFT . . SURVEY

97 Rhett 28 1300 7:00 10:35

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ___ _

1 of 3

Page 15: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWNTIME

(DREDGE/DMMA)

Survey Vessel Dredge 12 Crew Boat Dredge 12

ON"SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORICED

Management ·. · .......

······· ,J'··;.'

· .... ' ,.· .. '. .. . .. 1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman. SUPERVISOR 12.0 1 Cashman FIELD EN.GINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge•.·,;; ? :: ·· .\•·····.••· ,'t· · .. , ,·,,'' '.·•· .. i(/•/'• ._::;·,;\;;)<},'';:'• .,•.·;-•··•:.· /<,•<,/{:s;'.f; ..• !,./; •; \'{\'.('·'S'.c'.,f,. ···',;i\i'''·•> .. C:t•>·)//?'; \:• ':•'; 1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1 Cashman Deckhand 12.0

Tug porothy:J JC .l:'·,'':. ,·, ,.•. ., ···:<'ii'/;i'.!i+f'{'it,/:;/, .,;, ...• ,.,.,,·.,,.,,\;,:,•ii<•:· .i~·· ,;.;(, ;:,,;;.;,:,•( '··.' ::·:.,· .)., ·. ,.· ·.,. ··''.> :•······· ' .. '.•; . :,,te,;, · ;,.;<ir,;, .\ (

1 Cashman Captain 24 1 Cashman Deckhand 24

CrewBoat::c.·, .:\ ... <),: > ,,. .:·., · .. ··.cashniah·,, .. 'J '.;; '}'.'//':, ... '\'/•,:)}< l:t,},<i;,,,,\ \;', '·''•·>·+·:.;;,/''(/ ' ' · ... ,//:', ·., •., •, :·., ... -; .-c,'•,;.· '.'•.

1 Cashman Captain 12.0 1 Cashman Deckhand 12.0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of 3

Page 16: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

Date: 8/22/2017

Report No.: 083

DAILY REPORT OF OPERATIONS

PERMIT/LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F) . HUMIDITY PRECIP, {IN) WIND SPEED DIRECTION

(%) (MPH} 12:00 Partly Cloudy 84 75 0.0 11 SW

PROGRESS SUMMARY ITEM DAY TO DATE

WORKED HOURS 12 851 DOWNTIME 5.83 263.1 ESTIMATED VOLUME DREDGED (CV) 1,348 187,251 DREDGE ADVANCE (LF) 220 1,369,297

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-2,000 186,000

WATERING 51TE(CV)

DREDGE AREA - DREDGING IN PROGRESS BERTH NO. CUT START STATION STOP STATION '_START TIME .END TIME

26 1 11+50 9+30 7:00 10:35

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME. ' BERTH OF ORIGIN ·. VOLUME BY 'VOLUME BY·- ·- _STARTTIME - .·_ END TIME·

DRAFT ::suRvEv .-. . ··.:·.' : .•,

98 SEl3003 28 1300 -- 7:00 9:30

99 Angela S 28 400 12:00 18:00

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ____ _

1 of 3

Page 17: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWN TIME

(DREDGE/DMMA)

Survey Vessel Dredge 12 Crew Boat Dredge 12

ON-SITE PERSONNEL HOURS

Ml:lnagement::··.

1 Cashman PROJECT MANAGER 12.0

1 Cashman PROJECT ENGINEER 12.0

1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 12.0

1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dl'.edge;c::,: •• 1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1 Cashman Deckhand 12.0

Tug Dorotlly J

Cashman crew Boat ::c "'h •, .. ,,-:.::>:'.: . a~ man_: .. ,.·,.:

1 Cashman Captain 12.0 1 Cashman Deckhand 12.0

CQC SYSTEM MANAGER INITIALS: -----2 of 3

Page 18: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

Date: 8/23/2017

Report No.: 084

DAILY REPORT OF OPERATIONS

PERMIT /LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F)

12:00 Mostly Cloudy 83

PROGRESS SUMMARY ITEM

WORKED HOURS DOWNTIME ESTIMATED VOLUME DREDGED (CY) DREDGE ADVANCE (LF)

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-

WATERING SITE(CY)

DREDGE AREA - DREDGING IN PROGRESS BERTH NO. CUT

26 1

EXPLANATION OF DOWNTIME Swing gear problem

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME

. 99 Angela S

100 Michelle D

START STATION

9+80

' BERTH OF ORIGIN ·

26

26

NOTES ON BARGE AND BARGE MATERIAL

HUMIDITY PRECIP, (IN) .. WIND SPEED DIRECTION (%) (MPH)

69 0.1 9 w

DAV ·roDATE·

12 863 6.58 269.6

1,309 188,561

265 1,384,582

1,500 186,500

· STOPSTATION START TIME END TIME

7+20 7:00 12:35

VOLUME BY VOLUME BY.•· START TIME' . .END TIME' · .. · ..

DRAFT.·.' ·SURVEY. !

1500 -- 6:15 10:30

300 -- 10:45 13:45

CQC SYSTEM MANAGER INITIALS:. ___ _

1 of 3

Page 19: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY

ITEM LOCATION TOTAL HOURS DOWNTIME

(DREDGE/DMMA)

Survey Vessel Dredge 12 Crew Boat Dredge 12

ON-SITE PERSONNEL HOURS

Management ·· 1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge 1 Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1 Cashman Deckhand 12.0

Tl.lg DorotllyJ :'

Cashman Crew/Boat\: ' ' ';Cashrrian.\

1 Cashman Captain 12.0 1 Cashman Deckhand 12.0

CQC SYSTEM MANAGER INITIALS: ____ _

2 of 3

Page 20: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

$ASHMAN 'DREDGING

Date:

Report No.: 8/30/2017 085

DAILY REPORT OF OPERATIONS

PERMIT/LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F) HUMIDITY PRECIP. (IN) WIND SPEED DIRECTION

(%) (MPH)

12:00 Partly Cloudy 80 60 0.0 18 NNW

PROGRESS SUMMARY ITEM DAY TO DATE

WORKED HOURS 12 875 DOWNTIME 4.42 274.1 ESTIMATED VOLUME DREDGED (CY) 1,013 189,574 DREDGE ADVANCE (LF) 100 1,392,882

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-900 187,800

WATERING SITE(CY)

DREDGE AREA - DREDGING IN PROGRESS BERTH NO. CUT START STATION STOPSTATION. START TIME END TIME

34 1 33+10 31+05 11:00 17:35

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME BERTH OF ORIGIN VOLUME BY VOLUME BY START TIME END TIME

DRAFT SURVEY 100 Michelle D 34 1300 -- 11:00 15:30

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ___ _

1 of 3

Page 21: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWNTIME

(DREDGE/DMMA) Survey Vessel Dredge 12

Crew Boat Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORKED

Management ' ::. ,,' '', ,' ' "/'. ';.

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SSHO 12.0 1 Cashman SUPERVISOR 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge ,, ,' ,,,, .>·· ... ' > ·.· ••.... · ....•.•.. ; ','/ .\ :: ... ·· .

1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1 Cashman Deckhand 12.0

Tug DorothyJ , ·. ·· . .... .,.·····

. ' .: ., . ·'<. .·· . :' ' ';, ; " ·.·, : , .. 1 Cashman Captain 24 1 Cashman Deckhand 24

Crew Boat ·.·, '' 'Cashman ,·._,. . ··.::\. ·. '· . ":• ·. :, .... , ' . . ' 1 Cashman Captain 12.0 1 . Cashman Deckhand 12,0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of 3

Page 22: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

ASHMAN DREDGBNG

Date:

Report No.: 8/31/2017

086

DAILY REPORT OF OPERATIONS

PERM IT /LICENSE:

PROJECT: PANVNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP.(F) HUMIDITY PRECIP. (IN) WIND SPEED DIRECTION

(%) (MPH) 12:00 Partly Cloudy 84 61 0.0 28 WNW

PROGRESS SUMMARY ITEM DAV TO DATE

WORKED HOURS 12 887 DOWNTIME 3.08 277.1 ESTIMATED VOLUME DREDGED (CY) 2,919 192,492 DREDGE ADVANCE (LF) 259 1,414,897

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-1,500 189,300

WATERING SITE(CY)

DREDGE AREA- DREDGING IN PROGRESS BERTH NO. CUT START STATION STOP STATION START TIME END TIME

34 1 31+05 29+50 7:00 12:35

32 1 29+50 28+50 12:35 17:25

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME BERTH OF ORIGIN VOLUME BY VOLUME BY START.TIME END TIME

DRAFT SURVEY

102 Angela S 32/34 1700 N/A 11:00 15:30

103 Rhett 32 600 N/A 16:oo· 17:35

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ____ _

1 of3

Page 23: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWNTIME

(DREDGE/DMMA) Survey Vessel Dredge 12

Crew Boat Dredge 12 Washington Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY /SUB POSITION TOTAL HOURS WORKED

Management .. ····: . ., ...

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge : .... . · ·. :· . :, .... ', : ·.··. . ; ... ·. >.; ........ ..... · .. ..· .·' .....

1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1 Cashman Deckhand 12.0

Tug Dorothy J ... .. : .··.·.· ..... : ···•··· ... ··· . .. > .... :: . .\ 'J . ' i•, • .:< .. ,. • .. .•

1 Henry Marine Captain 24 1 Henry Marine Deckhand 24

Crew Boat ..

·.·' ·. Cashman . '· •.. . •. . '<'.: :.• ...... ·. .. ,··\> . . · . ...

1 Cashman Captain 12.0 1 Cashman Deckhand 12.0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of 3

Page 24: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

·$ASHMAN DREDGING

Date: 9/1/2017 Report No.: 087

DAILY REPORT OF OPERATIONS

PERMIT /LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F) HUMIDITY PRECIP, (IN) WIND SPEED DIRECTION

(%) (MPH) 12:00 Partly Cloudy 73 55 0.0 26 NW

PROGRESS SUMMARY ITEM DAV TO DATE

WORKED HOURS 12 899 DOWNTIME 2.08 279.2 ESTIMATED VOLUME DREDGED (CV) 3,412 195,904 DREDGE ADVANCE (LF) 237 1,435,753

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-2,000 191,300

WATERING SITE(CV)

DREDGE AREA· DREDGING IN PROGRESS BERTH NO. CUT START STATION · STOP STATION START TIME END TIME

32 1 28+50 26+17 6:30 17:25

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME BERTH OF ORIGIN VOLUME BY VOLUME BY START TIME END TIME

DRAFT SURVEY

103 Rhett 32/34 1800 N/A 6:30 9:40 104 Michelle D 32 900 N/A 10:35 17:25

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ____ _

1 of 3

Page 25: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWNTIME

(DREDGE/DMMA) Survey Vessel Dredge 12

Crew Boat Dredge 12 Washington Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORKED

Management ·. ·. .·· :.,

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SSHO 12.0 1 Cashman SUPERVISOR 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0

1 Cashman 0.0 1 Cashman 0.0

Dredge. · ....

:\, ·.: ·,. < • • •• <' . : .. '. .

.-,.

1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1 Cashman Deckhand 12.0

Tug Dorothy J .· ...... · . '.· ... .. ·. •: .. ->·.···''-'· . ·,\:::c.,:._<.•,,.• '..·-' ', . '. .:-''. · ...

1 Henry Marine Captain 24 1 Henry Marine Deckhand 24

Crew Boat ·· Cashman ';: · .. -: ········,··:·. ,· ·:· "

. > .. ,, ';·· 1 Cashman Captain 12.0 1 Cashman Deckhand 12.0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of3

Page 26: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

$ASHMAN DREDGING

Date: 9/5/2017 Report No.: 088

DAILY REPORT OF OPERATIONS

PERM IT /LICENSE:

PROJECT: PANVNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F) HUMIDITY PRECIP. (IN) WIND SPEED DIRECTION

(%) (MPH) 12:00 Partly Cloudy 87 67 0.0 10 SW

PROGRESS SUMMARY ITEM DAV TO DATE

WORKED HOURS 12 911 DOWNTIME 3.92 283.1 ESTIMATED VOLUME DREDGED (CY) 2,158 198,062 DREDGE ADVANCE (LF) 325 1,458,028

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-3,200 194,500

WATERING SITE(CY)

DREDGE AREA - DREDGING IN PROGRESS BERTH NO; CUT START STATION STOP STATION START TIME END TIME

32 1 26+17 27+45 6:30 9:30 34 1 31+85 33+14 9:40 15:00 36 1 33+14 33+74 15:10 17:45

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME BERTH OF ORIGIN VOLUME BY VOLUME BY START TIME END TIME

DRAFT SURVEY 105 Angela S 32/34 1800 N/A 6:30 12:35 106 SEl3003 36 400 N/A 15:10 17:30

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ___ _

1 of 3

Page 27: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWNTIME

(DREDGE/DMMA) Survey Vessel Dredge 12

Crew Boat Dredge 12 Washington Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORKED

Management .. . ·.· . ·.': ···. . .

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge· ,•. . ··: ,. . •.:. .. ·, ......... :i ·,. .. . . < ·:, ·, .. '. ,.. . . . ·. · .. ' ·. : .. .· .· ..

1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman Engineer 12.0 1· Cashman Deckhand 12.0

Tug Dorothy J > .. ··· .... . ( . ·. /.';. ·::\: ·. .... .· •... :,:- >• ':.- :: . "' .... :': ," • .... 1 Henry Marin·e Captain 24 1 Henry Marine Deckhand 24

Crew Boat ·.·. Cashman· '··· :' . .:: . ••

,, ,./ . ... : . . ·.·. ·, .. · .

1 Cashman Captain 12.0 1 Cashman De·ckhand 12.0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of3

Page 28: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

(~ASHMAN DREDGING

Date: 9/6/2017

Report No.: 089

DAILY REPORT OF OPERATIONS

PERMIT /LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F} HUMIDITY PRECIP. (IN) WIND SPEED DIRECTION

(%) (MPH) 12:00 Rain 71 61 0.3 9 NNW

PROGRESS SUMMARY ITEM DAY TO DATE

WORKED HOURS 12 923 DOWNTIME 2.33 285.5 ESTIMATED VOLUME DREDGED (CY} 2,786 200,848 DREDGE ADVANCE (LF) 186 1,476,628

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-2,800 197,300

WATERING SITE(CY}

DREDGE AREA - DREDGING IN PROGRESS BERTH NO. CUT START STATION .. STOP STATION START TIME END TIME

36 1 33+74 35+50 6:30 17:20

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME BERTH OF ORIGIN VOLUME BY. VOLUME BY STARTTIME' END TIME

DRAFT SURVEY 106 SEl3003 36 1600 N/A 6:30 10:35 106 Rhett 36 900 N/A 11:15 17:20

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS: ____ _

1 of3

Page 29: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION TOTAL HOURS DOWNTIME

(DREDGE/DMMA} Survey Vessel Dredge 12

Crew Boat Dredge 12 Washington Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORKED

Management· · .. :· · .. ··, • .. '· :. ·:.::: ·· .. :. 1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge , .. ... . ... ·• .. > ..• . :: . } ' .: .. . ·.:,'.

..,, : ' . ·:

1 Cashman Dredge Capt 12.0 1 Cashman Operator 12.0 1 Cashman Mate 12.0 1 Cashman · Engineer 12.0 1 Cashman Deckhand 12.0

Tug Dorothy J · .. :·:·. .:,.·.r ;., .. ,i ·. < : .. ....: ··.': •. '· .. .· ·:.· ·. : : ',.:·,,\· .:

1 Henry Marine Captain 24 1 Henry Marine Deckhand 24

Crew Boat .. : Cashman '·:, ,' :.,'' . '.'',

.. ''·· ' ,',',, ·,a, ,, ',

I

1 Cashman Captain 12.0 1 Cashman Deckhand 12.0

CQC SYSTEM MANAGER INITIALS: ___ _

2 of 3

Page 30: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

ASHMAN DREDGBNG

Date:

Report No.:

9/7/2017 090

DAILY REPORT OF OPERATIONS

PERMIT /LICENSE:

PROJECT: PANYNJ MFP-924.638 & PN-654.558

WEATHER SUMMARY TIME CONDITIONS TEMP. (F) HUMIDITY PRECIP. {IN) WIND SPEED DIRECTION

{%) (MPH) 12:00 Rain 74 59 0.0 11 WSW

PROGRESS SUMMARY ITEM DAV TO DATE

WORKED HOURS 9.5 932 DOWNTIME 4.25 289.7 ESTIMATED VOLUME DREDGED (CY) 2,040 202,888 DREDGE ADVANCE (LF) 186 1,495,228

ESTIMATED VOLUME TRANSFERRED OFF-SITE FROM DE-2,500 199,800

WATERING SITE(CY)

DREDGE AREA - DREDGING IN PROGRESS BERTH NO. CUT START STATION STOP STATION START TIME END TIME

36 1 35+50 36+22 6:30 11:55

EXPLANATION OF DOWNTIME

MATERIAL BARGE INFORMATION LOAD NUMBER BARGE NAME BERTH OF ORIGIN VOLUME BY VOLl,.IME BY START TIME END TIME

DRAFT SURVEY 108 Kelly 36 1600 N/A 6:30 10:35

NOTES ON BARGE AND BARGE MATERIAL

CQC SYSTEM MANAGER INITIALS:. ___ _ 1 of 3

Page 31: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

SUPPORT EQUIPMENT USED TODAY ITEM LOCATION · TOTAL HOURS DOWNTIME

(DREDGE/DMMA) Survey Vessel Dredge 12

Crew Boat Dredge 12 Washington Dredge 12

ON-SITE PERSONNEL HOURS # of EMPLOYEE COMPANY/SUB POSITION TOTAL HOURS WORKED

Management · ; .. •. · .. . .. ·. .. ,· ,: ·.

1 Cashman PROJECT MANAGER 12.0 1 Cashman PROJECT ENGINEER 12.0 1 Cashman QC/SS HO 12.0 1 Cashman SUPERVISOR 9.5 1 Cashman FIELD ENGINEER 12.0

1 Cashman FIELD ENGINEER 12.0 1 Cashman 0.0 1 Cashman 0.0 1 Cashman 0.0

Dredge '.: ...... . < ·.' < ·'. .. ·.·. ' .. ·.· . .· ... ·.:-. .. '.• .. ··· ..

1 Cashman Dredge Capt 9.5 1 Cashman .Operator 9.5 1 Cashman Mate 9.5 1 Cashman Engineer 9.5 1 Cashman Deckhand 9.5

Tug Dorothy J ; ;,.'../ ... .··.· .· .. : . •', '..;·. '· .; .. ·. \.,.: ; • ,. .. · ... < ,' . . . . .'

1 Henry Marine Captain 24 1 Henry Marine Deckhand 24

Crew Boat · .. ·

',, ··.· Cashman '' '.:; ..... : ... ,; •': ·,,: ·/· '('> >; .... :.······

., ·.: .,

1 Cashman Captain 9.5 \

1 Cashman Deckhand 9.5

CQC SYSTEM MANAGER INITIALS: ___ _

2 of3

Page 32: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

THE PORT AUTHORITY OP NY&NJ

JAY CASHMAN, INC, ENGINEERING DEPARTMENT

Cln1slfled1

Not Cosb

PORT NEWARK BERTHS 26, 281 321 & 34 MAINTENANCE AND DEEPENING DREDGING VIA WORK ORDER

CONTRACT No. PN-654,558

INTERIM DREDGE VOLUME FOR PAYMENT THROUGH 8/31./2017

DATE: SJUNE2017 PROJECT DEPTH: VARIABLE

OVERDEPTH: 2.0' SIDE SLOPE: NONE

Item 1: Dredging· Berth Maintenance Dredging Roger Verified (100% Payable) PAYABLE VOLUME REMOVED BERTH 26 . CV BERTH 28 . CV BERTH 325 . CV BERTH 34 CV 100% of Rogers Verrlfled Volume . CV

Unverified (90% Payable) BERTH 26 \, 715 CV BERTH 28 " 684 CV BERTH 325 "v 1,237 CV BERTH 34 \J 2,266 CV Subtotal

1~cv

90% of Unverified Volume "v CV

TOTAL PAYABLE 4,ID CV Item 2: Dredging· Berth Deepening Dredging

Roger Verified (100% Payable) PAYABLE VOLUME REMOVED BERTH 26 . CV BERTH 28 . CV BERTH 325 . CV BERTH 34 . CY 100% of Rogers Verrlfled Volume . CY

Unverified (90% Payable) BERTH 26 . CV BERTH 28 . CV BERTH 325 . CY BERTH 34 . CV 90% of Unverified Volume . CV

TOTAL PAYABLE . CV

Item 3: Disposal of Debris Debris Generated . Tons

Item 3: Moblllzatlon/Demoblllzatlon 1/ Number of Moblllzatlons: $ 30,000 Item 4: Moblllzatlon

******NOTES******

VOLUMES ARE CALCULATED USING THE TRIANGULATED IRREGULAR NETWEORK (TIN) METHOD 3X3 AVERAGED SORTED SOUNDINGS

COMPUTED BY: PM INITIAL: fAii ~ DATE: 9/512017

nl

Page 33: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

JAY CASHMAN, INC, ENGINEERING DEPARTMENT

PORT NEWARK BERTHS 26, 28, 32, & 34 MAINTENANCE AND DEEPENING DREDGING VIA WORK ORDER

CONTRACT No. PN·654.S58

INTERIM DREDGE VOLUME FOR PAYMENT THROUGH :J.0/2/2017

DATE: 9 FEBRUARY 2018 PROJECT DEPTH: VARIABLE

OVERDEPTH: 2,0' SIDE SLOPE: NONE

Item 1: Dredging· Berth Maintenance Dredging Verified (100% Payable) TOTAL PAYABLE VOLUME REMOVED BERTH 26 899 CY BERTH 28 1,595 CY BERTH 325 4,502 CY BERTH 34 3,211 CY 100% of Rogers Verrlfled Volume --..., :J.0,207 CY

LAST PAY APP PAYABLE ~8,558 CY TOTAL PAYABLE 10,207 CY

Item 2: Dredging· Berth Deepening Dredging Roger Verified (100% Payable) PAYABLE VOLUME REMOVED BERTH 26 . CY BERTH 28 . CY BERTH32S . CY BERTH 34 . CY 100% of Rogers Verrlfled Volume CY

TOTAL PAYABLE . CY

Item 3: Dlsposal of Debris Debris Generated "\J 69,80 Tons

Item 3: Mobllliatlon/Demoblllzatlon Number of Mobilizations: 1 $ 30,000 Item 4: Moblli?atlon

******NOTES******

VOLUMES ARE CALCULATED USING THE TRIANGULATED IRREGULAR NETWEORK (TIN) METHOD 3X3 AVERAGED SORTED SOUNDINGS

COMPUTED SY: PM INITIAL: _u_~-- DATE: ____ 2/.c:.9/-'20_1"-8 __

THE PORT AUTHORITY OF NY&NJ

Pencll Requisition # J Classified: ,/ 11/f 6/5'°, oo

Net Cost:

extra Work;

Date:

"" 1 11 glneor

NEW JERSEY MARINE TERMINALS RESIDENT ENGINEER'S OFFICE

'*"" I / 6 '11 ?)' ; vi/> )J 67 5, Dr:J

fJj I /,1,$0 ,' J;.~1'((),,;,:,

I I

Page 34: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

August 9, 2017

Jay Cashman, Inc. 549 South St. Quincy, MA 02169

THIE PORTAUTHORrrY OF NY & NJ

SUBJECT: CONTRACT PN-654.558 -PORT NEW ARK- BERTHS 26, 28, 32 & 34 MAINTENANCE AND DEEPENING DREDGING VIA WORK ORDER

REFERENCE: WORK ORDER NO. 01 - BERTH 26 & 28

Gentlemen:

In accordance with Clause 19 entitled "Work Orders" of the Contract Specifications, Jay Cashman, Inc. is hereby directed to proceed with all Work required to complete the maintenance and deepening dredging at Berths 26 and 28. All Wol'k is to be completed in accol'dance with the conformed contract documents for PN-654.558.

The hours of Work and berth access will be as directed by the Engineer. The anticipated stmt date for this Work is August 12, 2017. All Work shall be completed by December 31, 2017. For landside access to terminals, you must provide a listing of personnel with their TWIC number and any vehicles at least 48 hours prior to sta1t of work and daily. For small watercraft entering berth area, provide name/registration number of watercraft, name of point of contact and phone number.

For landside emergency services contact Port Authority Police Depa1tment (P APD) at (973) 578-2181.

Compensation for the Work shall be in accordance with Clause 23 entitled "Unit Prices" of the Contract Specification.

Please contact Mr. Clint Bransky of my staff at 973-578-4841 for coordination of work.

Sincerely,

Kenneth Tripaldi, P .B. Senior Resident Engineer New Jersey Marine Terminals

NewJersey Marine Terminals Restde11t E11g/11eer 's Office 1160 Mclester Street Expressport Plaza S11lte 7 Ellzabeth, NJ 0720 I

Page 35: PRA #18946 - PANYNJ · 2018. 4. 5. · material barge information load number barge name berth of origin volume by volumeb'f·· starttime, •end time.' draft survey 94 angela d

August 9, 2017

Jay Cashman, Inc. 549 South St. Quincy, MA 02169

TIIE PORT AmtORnY OF NY & NJ

SUBJECT: CONTRACT PN-654.558 -PORT NEWARK- BERTHS 26, 28, 32 & 34 MAINTENANCE AND DEEPENING DREDGING VIA WORK ORDER

REFERENCE: WORK ORDER NO. 02- BERTH 32 & 34

Gentlemen:

In accordance with Clause 19 entitled "Work Orders" of the Contract Specifications, Jay Cashman, Inc. is hereby directed to proceed with all Work required to complete the maintenance and deepening dredging at Berths 32 and 34. All Work is to be completed in accordance with the conformed contract documents for PN-654.558.

The hours of Work and berth access will be as directed by the Engineer. The anticipated start date for this Work is August 12, 2017. All Work shall be completed by October 27, 2017. For landside access to terminals, you must pl'Ovide a listing of personnel with their TWIC number and any vehicles at least 48 hours prior to start of work and daily. For small watercraft entering berth area, provide name/registration number of watercraft, name of point of contact and phone number.

For landside emergency services contact Port Authority Police Department (PAPD) at (973) 578-2181.

Compensation for the Work shall be in accordance with Clause 23 entitled "Unit Prices" of the Contract Specification.

Please contact Mr. Clint Bransky of my staff at 973-578-4841 for coordination of work.

Sincerely,

~~ Kenneth Tripaldi, P .E. Senior Resident Engineer New Jersey Marine Terminals

NewJersey .Marl11e Terminals Reslde11r E11gl11eer :. Office J J 60 .Mclester Street E.rpressport Plaza S11ire 7 Elizabeth, NJ0720l