1
MAIN SOUTHERN RAILWAY LINE GEORGES RIVER GEORGES RIVER GEORGES RIVER EAST HILLS RAILWAY LINE GEORGES RIVER MAIN SOUTHERN RAILWAY LINE MOOREBANK AVENUE EAST HILLS RAILWAY LINE EAST HILLS RAILWAY LINE EAST HILLS RAILWAY LINE ANTENNA MAIN SOUTHERN RAILWAY LINE GEORGES RIVER GEORGES RIVER GEORGES RIVER EAST HILLS RAILWAY LINE GEORGES RIVER MAIN SOUTHERN RAILWAY LINE MOOREBANK AVENUE EAST HILLS RAILWAY LINE EAST HILLS RAILWAY LINE EAST HILLS RAILWAY LINE ANTENNA PR MPW BYPASS 9.79ha PR 3.3 0.18ha PR 3.1 0.28ha PR 3.2 0.21ha PR BYPASS 03 0.53ha PR BYPASS 02 0.59ha PR BYPASS 01 0.80ha PR ABB 1.06ha PR BAPAUME 2.34ha PR M5 INTERSECTION 1.10ha PR BAPAUME 2 3.55ha PR BAPAUME 3 4.42ha PR DNSDC 5.07ha PR S RD 1 2.67ha PR MPE NORTH 30.93ha PR MOORE 5.56ha PR S5 3.30ha PR S4 5.52ha PR S3 6.11ha PR S2 6.11ha PR S1 5.78ha PR MPE SOUTH 14.43ha PR G03B 2.42ha PR G03A 5.38ha PR G04 3.28ha PR G05 2.76ha PR G05A 6.02ha PR G05C 8.82ha PR G05D 5.23ha PR G05E 12.48ha PR G05F 10.73ha PR G05G 3.74ha PR G06 2.73ha PR G06A 16.92ha PR G06B 16.19ha PR G06C 13.46ha PR G08 1.98ha PR G08D 12.67ha PR G08E 11.91ha PR MPE WEST 11.57ha BC 0202 OSD 4 OSD 9 OSD 10 AMIENS WETLAND OSD 5 OSD 6 OSD 8 OSD 3 CULVERT PASSES UNDER OSD 5 CULVERT TAKES FLOWS FROM OSD 9, OSD 10 & THE DEFENCE PROPERTIES DJLU DJLU GLENFIELD WASTE FACILITY EXISTING INDUSTRIAL DEVELOPMENT ABB SITE GEORGES RIVER GEORGES RIVER M5 MOTORWAY ANZAC CREEK WATER QUALITY TREATMENT DEVICES TO BE PLACED WITHIN CARPARK LANDSCAPED AREAS WATER QUALITY TREATMENT DEVICES TO BE PLACED WITHIN CARPARK LANDSCAPED AREAS Issue Description Date 100mm on Original Project Title Client Project No. Issue Drawing No. Filename: Status Grid Original Size Scales Checked Designed Drawn Height Current Issue Signatures A1 Datum Approved AA009335 MOOREBANK PRECINCT WEST - STAGE 2 Arcadis Australia Pacific Pty Limited Level 16, 580 George St SYDNEY NSW 2000 ABN 76 104 485 289 Tel No: +61 2 8907 9000 Fax No: +61 2 8907 9001 arcadis.com MPW2 ARC CV DWG 50 0 100 200 300 1 : 5000 400 500m Date Plotted: 11 Oct 2018 - 02:31PM File Name: F:\AA009335\16_MPW2\CV\DWG\MPW2-ARC-CV-DWG-0201-StormwaterStrategyPlan.dwg MPW2-ARC-CV-DWG-0201-StormwaterStrategyPlan.dwg 0201 01 V1 STORMWATER STRATEGY PLAN PRELIMINARY ONLY NOT TO BE USED FOR CONSTRUCTION D.WALL G.DUNSTAN M.GOSTELOW W.OWERS 1:5000 AHD MGA 01 SUPERSEDES DRAWING C-MIC2-SSD-406 11/10/2018 LEGEND MPW STAGE 2 CONSTRUCTION AREA PROPOSED STORMWATER CATCHMENT BOUNDARY PROPOSED STORMWATER CULVERT / PIPE EXISTING STORMWATER CULVERT / PIPE 100YR ARI EXISTING FLOOD EXTENTS PROPOSED CATCHMENT LABEL FLOW ARROW PR 00 0.00ha NOTES 1. BIORETENTION TO BE PLACED WITHIN CARPARK AREAS. SURFACE RUNOFF FROM CARPARK AREAS IS TO BE DIVERTED THROUGH THESE LANDSCAPE AREAS. 2. GEORGES RIVER FLOOD EXTENTS ARE INTERPOLATED FROM AVAILABLE ALS SURVEY AND FLOOD LEVELS DOCUMENTED IN "UPPER GEORGES RIVER FLOOD STUDY" BY DEPARTMENT OF LAND & WATER CONSERVATION IN CONJUNCTION WITH LIVERPOOL CITY COUNCIL (DECEMBER 2000). 3. ANZAC CREEK FLOOD EXTENTS ARE FROM TUFLOW MODEL RESULTS SUPPLIED BY LIVERPOOL CITY COUNCIL (JULY 2008)

PR 00 - ipcn.nsw.gov.au

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PR 00 - ipcn.nsw.gov.au

Caroma_Nordic_Basin_Mixerobject #1object #2 Caroma_Nordic_Basin_Mixerobject #1object #2Caroma_Nordic_Basin_Mixerobject #1object #2 Caroma_Nordic_Basin_Mixerobject #1object #2

EP

EP

EP

EP EP

EP

EP

EP EP

EP EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP EP

EP

EP

EP

EP

EP

EP

EP

EP

0

.5

8

0

.4

70

.4

0

0

.4

0

0

.4

2

0

.2

8

0

.6

5

1

.1

3

1

.3

6

1

.0

5

1

.3

5

1

.5

1

1

.5

0

1

.2

7

1

.2

0

0

.4

7

0

.4

2

0

.4

3

0

.6

2

0

.7

1

0

.5

5

0

.6

0

0

.7

9

0

.6

2

0

.7

9

0

.8

2

0

.2

7

0

.3

2

0

.3

3

0

.6

2

1

.3

3

1

.4

81

.5

9

1

.3

61

.2

2

1

.2

2

1

.3

6

1

.2

9

1

.6

3

1

.3

6

0

.6

9

0

.3

2

0

.1

4

0

.3

5

0

.5

4

0

.7

3

0

.9

9

0

.7

7

0

.3

7

0

.4

80

.2

3

0

.1

9

0

.0

8

0

.2

6

0

.1

7

0

.0

5

0

.0

90

.3

9

1

.0

2

1

.3

31

.5

4

1

.3

4

1

.0

91

.5

3

1

.6

9

1

.2

4

1

.2

0

1

.4

3

1

.2

1

0

.5

8

0

.2

6

-0

.0

1

0

.0

1

0

.0

7

0

.1

1

0

.2

0 0

.5

7

0

.9

4

-0

.3

4

0

.4

1

1

.0

3

1

.4

9

1

.2

4

1

.2

4

1

.3

4

2

.0

5

1

.5

8

1

.8

0

1

.5

2

1

.6

1

1

.6

1

1

.6

4

0

.9

0

0

.9

3

0

.9

0

0

.4

8

0

.4

7

0

.3

6

0

.4

5

0

.5

8

0

.9

3

0

.9

2

0

.8

5

0

.7

8

0

.6

9

1

.0

2

1

.1

8

0

.7

8

1

.0

8

0

.9

7

0

.9

4

0

.6

3

0

.7

5

0

.4

1

0

.5

1

0

.4

3

0

.8

2

0

.7

60

.7

5

0

.9

61

.0

1

1

.0

6

1

.7

9

1

.1

4

1

.2

5

1

.6

2

2

.0

1

1

.7

3

2

.0

9

1

.0

5

1

.3

6

1

.4

6

1

.3

1

1

.2

2

1

.3

1

1

.2

1

1

.1

4

1

.3

5

0

.5

0 0

.8

1

0

.9

4

0

.7

4

0

.5

4 0

.7

3

0

.7

0

0

.6

1

0

.7

2

0

.8

0

0

.8

2

0

.9

1

0

.1

6

0

.5

7

0

.2

2

1

.6

3

0

.6

6

1

.0

0

1

.8

6

M

A

I

N

S

O

U

T

H

E

R

N

R

A

I

L

W

A

Y

L

I

N

E

G

EO

R

G

ES

R

IVE

R

G

EO

R

G

ES

R

IVE

R

GEORGES

RIVER

EA

ST

HILLS

RA

ILW

AY

LIN

E

G

E

O

R

G

E

S

R

IV

E

R

M

A

I

N

S

O

U

T

H

E

R

N

R

A

I

L

W

A

Y

L

I

N

E

M

O

O

R

E

B

A

N

K

A

V

E

N

U

E

E

A

S

T

H

IL

L

S

R

A

IL

W

A

Y

L

IN

E

EA

ST

H

ILLS

R

AILW

AY

LIN

E

E

A

S

T

H

IL

L

S

R

A

IL

W

A

Y

L

IN

E

NA

E

R

O

D

E

D

B

A

N

K

O

U

TLE

T P

IP

E N

O

T V

IS

IB

LE

D

IS

C

H

AR

G

E P

IP

E

T

EM

PT

Y

PT

Y

CHAMBER ESTIMATED FROM CCTV

C

O

R

R

U

G

AT

ED

IR

O

N

P

IP

E

21

00

ø

C

OR

RU

GA

TE

D IR

ON

P

IP

E

TO

A

C

C

ES

S T

H

IS

C

H

AM

BE

R

N

EE

D

S

C

O

NF

IN

ED

S

PA

CE

E

NT

RY

N

O

S

TE

P

IR

O

N

S

P

R

E

S

E

N

T

TO

A

C

C

E

S

S

T

H

IS

C

H

A

M

B

E

R

N

E

E

D

S

C

O

NF

IN

ED

S

PA

CE

E

NT

RY

C

H

AM

BE

R

F

U

LL O

F R

U

BB

IS

H

BU

R

R

IE

D

C

H

AM

BE

R

SIZ

E A

N

D

IN

VE

R

T LE

VE

LS

ES

TIM

AT

ED

F

R

O

M

C

C

TV

TO

A

C

C

ES

S T

H

IS

C

H

AM

BE

R

N

EE

D

S

C

O

NF

IN

ED

S

PA

CE

E

NT

RY

N

O S

TE

P IR

ON

S

PIP

E N

OT

V

IS

IB

LE

PIT

F

UL

L O

F R

UB

BIS

H

DH

DH

DH

FLG

FL

FLG

FLG

FLG TSC

I

T E

M

PT

Y

250 DIA

25

0 D

IA

( G

L

I )

BP

BP

BP

DH

FL

FL

RS

T

RS

T

RST

RST

R

ST

/S39.2

32

RS

T/S

39.1

88

RS

T/S

39.1

44

RS

T/S

39.1

00

BPBPBP

DH

DH

GI

SM

SM

SM

A A

A A

A

N

T

E

N

N

A

RST

RS

T

RST

RST

RST

RST

RST

RST

RST

RST

RS

T

RST

E

H

30+

113

EH

30+

113

BP

DH

DH

DH

FL

GI

SM

SM

SM

A

A

A

A

A

km

km

km

Ph

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

R

ST

/S39.4

27

RS

T/S

39.3

27

RS

T/S

39.3

21

R

ST

/S39.2

76

E

H

3

0

6

7

2

E

H

3

0

6

2

2

E

H

3

0

6

2

2

E

H

3

0

5

7

2

E

H

3

0

5

2

2

E

H

3

0

4

6

0

E

H

3

0

3

9

8

E

H

3

0

3

3

6

E

H

3

0

2

7

8

E

H

30+

228

E

H

30+

178

E

H

30+

228

E

H

30+

178

EP

EP

EP

EP EP

EP

EP

EP EP

EP EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP EP

EP

EP

EP

EP

EP

EP

EP

EP

0

.5

8

0

.4

70

.4

0

0

.4

0

0

.4

2

0

.2

8

0

.6

5

1

.1

3

1

.3

6

1

.0

5

1

.3

5

1

.5

1

1

.5

0

1

.2

7

1

.2

0

0

.4

7

0

.4

2

0

.4

3

0

.6

2

0

.7

1

0

.5

5

0

.6

0

0

.7

9

0

.6

2

0

.7

9

0

.8

2

0

.2

7

0

.3

2

0

.3

3

0

.6

2

1

.3

3

1

.4

81

.5

9

1

.3

61

.2

2

1

.2

2

1

.3

6

1

.2

9

1

.6

3

1

.3

6

0

.6

9

0

.3

2

0

.1

4

0

.3

5

0

.5

4

0

.7

3

0

.9

9

0

.7

7

0

.3

7

0

.4

80

.2

3

0

.1

9

0

.0

8

0

.2

6

0

.1

7

0

.0

5

0

.0

90

.3

9

1

.0

2

1

.3

31

.5

4

1

.3

4

1

.0

91

.5

3

1

.6

9

1

.2

4

1

.2

0

1

.4

3

1

.2

1

0

.5

8

0

.2

6

-0

.0

1

0

.0

1

0

.0

7

0

.1

1

0

.2

0 0

.5

7

0

.9

4

-0

.3

4

0

.4

1

1

.0

3

1

.4

9

1

.2

4

1

.2

4

1

.3

4

2

.0

5

1

.5

8

1

.8

0

1

.5

2

1

.6

1

1

.6

1

1

.6

4

0

.9

0

0

.9

3

0

.9

0

0

.4

8

0

.4

7

0

.3

6

0

.4

5

0

.5

8

0

.9

3

0

.9

2

0

.8

5

0

.7

8

0

.6

9

1

.0

2

1

.1

8

0

.7

8

1

.0

8

0

.9

7

0

.9

4

0

.6

3

0

.7

5

0

.4

1

0

.5

1

0

.4

3

0

.8

2

0

.7

60

.7

5

0

.9

61

.0

1

1

.0

6

1

.7

9

1

.1

4

1

.2

5

1

.6

2

2

.0

1

1

.7

3

2

.0

9

1

.0

5

1

.3

6

1

.4

6

1

.3

1

1

.2

2

1

.3

1

1

.2

1

1

.1

4

1

.3

5

0

.5

0 0

.8

1

0

.9

4

0

.7

4

0

.5

4 0

.7

3

0

.7

0

0

.6

1

0

.7

2

0

.8

0

0

.8

2

0

.9

1

0

.1

6

0

.5

7

0

.2

2

1

.6

3

0

.6

6

1

.0

0

1

.8

6

M

A

I

N

S

O

U

T

H

E

R

N

R

A

I

L

W

A

Y

L

I

N

E

G

EO

R

G

ES

R

IVE

R

G

EO

R

G

ES

R

IVE

R

GEORGES

RIVER

EA

ST

HILLS

RA

ILW

AY

LIN

E

G

E

O

R

G

E

S

R

IV

E

R

M

A

I

N

S

O

U

T

H

E

R

N

R

A

I

L

W

A

Y

L

I

N

E

M

O

O

R

E

B

A

N

K

A

V

E

N

U

E

E

A

S

T

H

IL

L

S

R

A

IL

W

A

Y

L

IN

E

EA

ST

H

ILLS

R

AILW

AY

LIN

E

E

A

S

T

H

IL

L

S

R

A

IL

W

A

Y

L

IN

E

NA

E

R

O

D

E

D

B

A

N

K

O

U

TLE

T P

IP

E N

O

T V

IS

IB

LE

D

IS

C

H

AR

G

E P

IP

E

T

EM

PT

Y

PT

Y

CHAMBER ESTIMATED FROM CCTV

C

O

R

R

U

G

AT

ED

IR

O

N

P

IP

E

21

00

ø

C

OR

RU

GA

TE

D IR

ON

P

IP

E

TO

A

C

C

ES

S T

H

IS

C

H

AM

BE

R

N

EE

D

S

C

O

NF

IN

ED

S

PA

CE

E

NT

RY

N

O

S

TE

P

IR

O

N

S

P

R

E

S

E

N

T

TO

A

C

C

E

S

S

T

H

IS

C

H

A

M

B

E

R

N

E

E

D

S

C

O

NF

IN

ED

S

PA

CE

E

NT

RY

C

H

AM

BE

R

F

U

LL O

F R

U

BB

IS

H

BU

R

R

IE

D

C

H

AM

BE

R

SIZ

E A

N

D

IN

VE

R

T LE

VE

LS

ES

TIM

AT

ED

F

R

O

M

C

C

TV

TO

A

C

C

ES

S T

H

IS

C

H

AM

BE

R

N

EE

D

S

C

O

NF

IN

ED

S

PA

CE

E

NT

RY

N

O S

TE

P IR

ON

S

PIP

E N

OT

V

IS

IB

LE

PIT

F

UL

L O

F R

UB

BIS

H

DH

DH

DH

FLG

FL

FLG

FLG

FLG TSC

I

T E

M

PT

Y

250 DIA

25

0 D

IA

( G

L

I )

BP

BP

BP

DH

FL

FL

RS

T

RS

T

RST

RST

R

ST

/S39.2

32

RS

T/S

39.1

88

RS

T/S

39.1

44

RS

T/S

39.1

00

BPBPBP

DH

DH

GI

SM

SM

SM

A A

A A

A

N

T

E

N

N

A

RST

RS

T

RST

RST

RST

RST

RST

RST

RST

RST

RS

T

RST

E

H

30+

113

EH

30+

113

BP

DH

DH

DH

FL

GI

SM

SM

SM

A

A

A

A

A

km

km

km

Ph

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

RST

R

ST

/S39.4

27

RS

T/S

39.3

27

RS

T/S

39.3

21

R

ST

/S39.2

76

E

H

3

0

6

7

2

E

H

3

0

6

2

2

E

H

3

0

6

2

2

E

H

3

0

5

7

2

E

H

3

0

5

2

2

E

H

3

0

4

6

0

E

H

3

0

3

9

8

E

H

3

0

3

3

6

E

H

3

0

2

7

8

E

H

30+

228

E

H

30+

178

E

H

30+

228

E

H

30+

178

DN375

PR MPW BYPASS9.79ha

PR 3.30.18ha

PR 3.10.28ha PR 3.2

0.21ha

PR BYPASS 030.53ha

PR BYPASS 020.59ha

PR BYPASS 010.80ha

PR ABB1.06ha

PR BAPAUME2.34ha

PR M5 INTERSECTION1.10ha

PR BAPAUME 23.55ha

PR BAPAUME 34.42ha PR DNSDC

5.07ha

PR S RD 12.67ha

PR MPE NORTH30.93ha

PR MOORE5.56ha

PR S53.30ha

PR S45.52ha

PR S36.11ha

PR S26.11ha

PR S15.78ha

PR MPE SOUTH14.43ha

PR G03B2.42ha

PR G03A5.38ha

PR G043.28ha

PR G052.76ha

PR G05A6.02ha

PR G05C8.82ha

PR G05D5.23ha PR G05E

12.48ha

PR G05F10.73ha

PR G05G3.74ha

PR G062.73ha

PR G06A16.92ha

PR G06B16.19ha

PR G06C13.46ha

PR G081.98ha

PR G08D12.67ha

PR G08E11.91ha

PR MPE WEST11.57ha

BC0202

OSD 4

OSD 9

OSD 10

AMIENSWETLAND

OSD 5

OSD 6

OSD 8

OSD 3

CULVERT PASSESUNDER OSD 5

CULVERT TAKES FLOWSFROM OSD 9, OSD 10 &THE DEFENCE PROPERTIES

DJLU

DJLU

GLENFIELD WASTEFACILITY

EXISTINGINDUSTRIAL

DEVELOPMENT

ABB SITE

GEORGES RIVER

GEORGES RIVER

M5 M

OTOR

WAY

ANZAC CREEK

WATER QUALITY TREATMENTDEVICES TO BE PLACED WITHINCARPARK LANDSCAPED AREAS

WATER QUALITY TREATMENTDEVICES TO BE PLACED WITHINCARPARK LANDSCAPED AREAS

Issue

Description

Date

100mm on Original

Project

Title

Client

Project No.

IssueDrawing No.

Filename:

Status

Grid

Original

Size

Scales

Checked

Designed

Drawn

Height

Current Issue Signatures

A1

Datum

Approved

AA009335

MOOREBANK PRECINCTWEST - STAGE 2 Arcadis Australia Pacific Pty Limited

Level 16, 580 George St

SYDNEY NSW 2000

ABN 76 104 485 289

Tel No: +61 2 8907 9000

Fax No: +61 2 8907 9001

arcadis.com

MPW2 ARC CV DWG

500 100 200 300

1 : 5000

400 500m

Date Plotted: 11 Oct 2018 - 02:31PM File Name: F:\AA009335\16_MPW2\CV\DWG\MPW2-ARC-CV-DWG-0201-StormwaterStrategyPlan.dwgMPW2-ARC-CV-DWG-0201-StormwaterStrategyPlan.dwg 0201 01

V1

STORMWATER STRATEGYPLAN

PRELIMINARY ONLYNOT TO BE USED FOR CONSTRUCTION

D.WALL

G.DUNSTAN

M.GOSTELOW

W.OWERS

1:5000

AHD

MGA01 SUPERSEDES DRAWING C-MIC2-SSD-406 11/10/2018

LEGENDMPW STAGE 2 CONSTRUCTION AREA

PROPOSED STORMWATER CATCHMENTBOUNDARY

PROPOSED STORMWATER CULVERT / PIPE

EXISTING STORMWATER CULVERT / PIPE

100YR ARI EXISTING FLOOD EXTENTS

PROPOSED CATCHMENT LABEL

FLOW ARROW

PR 000.00ha

NOTES1. BIORETENTION TO BE PLACED WITHIN CARPARK AREAS. SURFACE

RUNOFF FROM CARPARK AREAS IS TO BE DIVERTED THROUGHTHESE LANDSCAPE AREAS.

2. GEORGES RIVER FLOOD EXTENTS ARE INTERPOLATED FROMAVAILABLE ALS SURVEY AND FLOOD LEVELS DOCUMENTED IN"UPPER GEORGES RIVER FLOOD STUDY" BY DEPARTMENT OFLAND & WATER CONSERVATION IN CONJUNCTION WITHLIVERPOOL CITY COUNCIL (DECEMBER 2000).

3. ANZAC CREEK FLOOD EXTENTS ARE FROM TUFLOW MODELRESULTS SUPPLIED BY LIVERPOOL CITY COUNCIL (JULY 2008)