20
Power Grid Corporation of India Ltd A Navratna PSU

PPT

Embed Size (px)

DESCRIPTION

powergrid ppt

Citation preview

  • Power Grid Corporation of India Ltd A Navratna PSU

  • POWERGRID Executive Trainee XVII Campus Selection

    POWERGRID

    One of the largest and best managed transmission utility in the World

    Youngest Navratna Public Sector Enterprise in Power Sector

    Central Transmission Utility (CTU) of the country since 1998

    Earning profit since inception

    Technology Leader in EHVAC & HVDC Transmission

    Carries 51% of generated power across country

  • POWERGRID Executive Trainee XVII Campus Selection

    Established in Oct 23,1989 by transfer of Assets and Personnel from different CPSUs

    Commenced commercial operation from April 1, 1992

    World's Leading Power Transmission Utility

    82,354 Ckt. Km line

    135 Substations as on March 31,2011

    93,050 MVA Transformation Capacity

    22400 MW (Approx) Inter Regional Capacity

    Network availability maintained over 99%

    Telecom NLD with 20733 Km Optical Fibre Network & Internet Service Provider

  • POWERGRID Executive Trainee XVII Campus Selection

    Our Business Segments

    Owns & operates Fibre Optic Cable Network

    Licenses NLDO, ISP & IP - 1

    Establishment of modern LDC

    Real Time Grid Operation

    Optimum Scheduling & Dispatch

    Energy Accounting

    Generation Linked

    Grid Strengthening

    Inter Regional Links

    Inter Country Links

    Development of Inter State Transmission System

    Grid Management

    Telecom Consultancy National & International

    Transmission Load Dispatch & Communication Distribution Telecom

  • POWERGRID Executive Trainee XVII Campus Selection

    Growth Profile PAT & Turnover

    1009 1229

    1448 1691

    2041

    2697

    3554

    4097

    5082

    6139

    7504

    9100

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    2005 - 06 2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11

    in `

    Cro

    res

    PAT

    Turnover

  • POWERGRID Executive Trainee XVII Campus Selection

    Growth Profile Gross Fixed Assets

    24888

    29015

    35417

    40319

    43202

    50352

    0

    10000

    20000

    30000

    40000

    50000

    60000

    2005 - 06 2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11

    in `

    Cro

    res

  • POWERGRID Executive Trainee XVII Campus Selection

    Growth Profile Human Capital

    7103 7427

    7645

    8214

    9162

    9775

    0

    2000

    4000

    6000

    8000

    10000

    12000

    2005 - 06 2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11

    Ma

    np

    ow

    er

  • Organization Structure

    3 Tiered Structure

    Corporate Office

    Regional HQs

    Sub Stations Site Offices TL Office

  • POWERGRID Executive Trainee XVII Campus Selection

    Corporate Office - Gurgaon

    Region Headquarter Geographical spread

    Northern Region-I Delhi Delhi, UP, Rajasthan, Haryana, Uttaranchal

    Northern Region-II Jammu J&K, HP, Punjab

    Eastern Region-I Patna Bihar, Jharkhand

    Eastern Region-II Kolkata West Bengal, Orissa, Sikkim

    North Eastern Region Shillong Seven States of North East

    Western Region-I Nagpur Maharashtra, Chhattisgarh, Goa

    Western Region-II Vadodara MP, Gujarat, Daman, Diu, Dadra Nagar Haveli

    Southern Region-I Secunderabad Andhra Pradesh

    Southern Region-II Bangalore Kerala, Tamil Nadu, Karnataka, Puducherry

    POSOCO 5 RLDCs Delhi, Kolkata, Shillong, Mumbai and Bangalore

    Locations

  • POWERGRID - Executive Trainee Program

  • POWERGRID Executive Trainee XVII Campus Selection

    Executive Trainee Program

    Principal source of infusing young blood in the company

    ET - XVII batch to be inducted in 2012

    ET - XVII to be the fourth batch recruited through campus selection

    Duration of Training One Year

    Comprises Classroom Training

    On the Job Training

    Evaluation Mid Term Appraisal

    Final Appraisal

    Absorption in the post of Engineer (Electrical) at E2A level on successful completion of training

  • POWERGRID Executive Trainee XVII Campus Selection

    Selection Modes

    All India Written Exam

    Campus Selection

  • POWERGRID Executive Trainee XVII Campus Selection

    Inviting Applications

    Shortlisting of Applications

    Personal Interview

    (1 Round)

    Announcement of selected candidates

    Pre Employment Medical Exam

    Joining as Executive Trainee*

    Campus Selection - Process

    * Subject to fulfilling the eligibility criteria

  • POWERGRID Executive Trainee XVII Campus Selection

    Eligibility Criteria

    Minimum Marks * For General/OBC(NCL): 65%

    For SC/ST/PH: Pass Marks

    * Or Equivalent CGPA. CGPA shall be converted into percentage as per the formula provided by the Institute. In

    absence of such formula, the AICTE criteria (i.e. CGPA of 7.25 = 65% ) shall be followed. Shortlisting of candidates for campus interview shall be done on the basis of CGPA/

    Percentage till sixth semester. Appointment of selected candidates shall be subject to their overall CGPA/ percentage in the final degree awarded by the institute.

    Maximum Age **

    For General : 28 years

    For SC/ST : 33 years

    For OBC (NCL) : 31 years

    For PH : 5 years relaxation in age

    ** As on 31st Dec 2011

  • POWERGRID Executive Trainee XVII Campus Selection

    Important Information

    Appointment of selected candidates is subject to

    Medical fitness as per POWERGRID Norms e.g. Candidates should not suffer from

    Colorblindness, Squint, refractive defects exceeding + 4 D. (for details, refer to Career

    section at www.powergridindia.com )

    Service Agreement Bond:

    Amount : (General/ OBC (NCL)) Rs. 1 Lakh, (SC/ST/PH) Rs. 50 Thousand

    Period: To serve the company for three years after successful completion of one year

    training

    Posting:

    On successful completion of the ET training program, the final posting can be

    anywhere in India, depending on functional requirement, performance of the ET during

    the training and their preference.

  • POWERGRID Executive Trainee XVII Campus Selection

    Indicative Job Description of Engineer (Electrical) Planning, Design, engineering, quality assurance, inspection, erection, testing &

    commissioning of 132 kv / 220 kv / 400 kv / 765 kv / HVDC Sub-station, Transmission Line, Power system protective relays, substation automation system, Power Line Carrier Communication, SCADA system, Control & Instrumentation System, implementation of Smart Grid, Research & Development etc.

    Construction, operation, maintenance, erection, testing and commissioning, cost estimation, project cost control activities of EHVAC/HVDC, HVDC B/B Transmission System.

    Assignment related to Commercial, Engineering, Contracts & Materials, Load dispatch & Communication of Transmission System, System Operation, Telecom, etc.

    Co-ordination with internal and external stakeholders, etc.

    Any other related work assigned to individual from time to time.

  • Compensation During Training

    Particulars Monthly Annual

    Basic 24900 298800

    DA 11753 141034

    HRA 7470 89640

    Allowances 4233 50796

    Social Security and Welfare 6752 81022

    Total 55108 661291

  • POWERGRID Executive Trainee XVII Campus Selection

    After Training Compensation

    PARTICULARS Per month

    Basic Salary (Minimum) 25640

    DA @ 47.2 12100

    Allowances and Reimbursements 17410

    Lease 22700

    Gross Salary 77860

    Social Security and Welfare 18190

    Total Salary ( Per Month) 96060

    Total Salary ( Per Annum) 1152800

    Annual Performance Incentive (Approx) * 80010

    Total CTC ( Per Annum ) 1232820

    * As per the PRP policy

  • POWERGRID Executive Trainee XVII Campus Selection

    COMPENSATION SCHEME

    Financial

    Direct

    Fixed Pay (Basic, DA)

    Performance Related Pay

    Allowances ( Cafeteria approach)

    Other allowances

    Superannuation Benefits

    Indirect

    Accommodation

    Medical reimbursements

    Long term and short term Advances

    Social security (gratuity, insurance, pension)

    Telephone/ mobile reimbursements

    Conveyance reimbursement

    Non Financial

    Intangible

    Work life balance

    Career development (Learning opportunities)

    Leaves

    Tie ups with schools

    Foreign trainings

    Entertainment/ Club facility

  • POWERGRID

    One Nation. One Grid.