35
LOGO EDIXEON Introduction

Ppt 新

Embed Size (px)

Citation preview

Page 1: Ppt 新

LOGO

EDIXEON Introduction

Page 2: Ppt 新

EDIXEON Company Profile1

EDIXEON -PGS2

4

Page 3: Ppt 新
Page 4: Ppt 新

Company Introduction

Established in 2006

More than 120 on-line worker

8 experienced engineering team:

Monthly production capacity: 100,000 units

Setup: LED Lighting division; Intelligent electronics division a final product working shop (Xinjin Cheng Electronics Co.,ltd)

A Long Term OEM Partner (electronics factory)

ISO 9001 Certified Enterprise

CE and RoHS approved

Turnover in 2009: USD 2.7 million

Expected turnover this year : USD 5 million, while hopefully reaching USD5.5 million

Company policy: Be a Win-win business partner and help the client grow up together

Our aims: Strive to be an energy-saving pioneer.

Page 5: Ppt 新

Company Structure

Board of Director

General Manager

Administration Centre

Executive Dept

Financial Dept

Human Resource

Purchase Dept

Warehouse

R&D Centre

Product Technology Dept

Testing Dept

Marketing Dept

Lighting Dept

Intelligent Electronics Dept

Foreign Sales

Local Sales

Technical Support

Foreign Sales

Local Sales

Technical Support

Production Centre

Quality Control Dept

Production Dept 1

Production Dept 2

Page 6: Ppt 新

CE Certificate

Page 7: Ppt 新
Page 8: Ppt 新

Working Principle and Component

Page 9: Ppt 新

PGS Primary FunctionsFunction Highlights

 Parking Lot Availability Accounting

 Smart Guidance System

 Graphical Management to the Parking Lot

 Statistical Management to the Parking Lot

 Statistics Report

 Self-Diagnose Function

Page 10: Ppt 新

Return of Investment (ROI)

Mitigate congestion inside and outside the Parking Lot.

Increase the desirability of the Parking Lot.

Improve the image of the Parking Lot.

Page 11: Ppt 新
Page 12: Ppt 新

Features of Sensor

Featuresa) Detects the bay 2 times every second

b) False detecting-proofed function--avoiding false detection to adjacent spaces

c) Sensor and indicating light integration design

d) Low working voltage(24V)

e) Two detecting methods--detecting car or detecting ground

d) Power input protection

e) High safety

Ultrasonic Sensor(US02)

Page 13: Ppt 新

EDIXEON-PGS- Parking Lot Indicating Light

Technical Data

Introductiona) Indicating Light is controlled by the ultrasonic sensors and displays

synchronous status with the ultrasonic sensor

b) Large-size design; large emitting angle with visable distance of 150m.

c) High brightness built-in LED lamp beads (¢5), 5 green and 5 red.

Parking Lot Indicating Light

Voltage DC5V Current Peak Current 450mA

LED quantity 5R 5G Size 13cm(D)×6cm(H)

Page 14: Ppt 新

Contents

Page 15: Ppt 新

System Structure

EDIXEON-PGS is made up of ultrasonic sensor, bay indicator, data collector, centre processor, LED display, management software, cables and switches.

Page 16: Ppt 新

Installation Guideline

The installation procedure is as followed:

Pre-installation Stage

A. According to Parking Lot structure to design wiring layouts;B. According to the wiring layout design to calculate the cable load. And then

define the cable types and quantity.

Installation Stage

A. According to the Wiring Layout Design to do wiring. Then install PGS component according to System Diagram.

B. PGS component installation (pls refer to Installation Guidance)C. After component installation, cable checking, power testing, commissioning is

required. Technician will also need to check all the components via software.

Post-installation StageA. A component number table and a wiring layout shall be keep into file in case of

future maintenance.

Page 17: Ppt 新

Installation Guideline

Sensor Installation Guidance

Installation Site Function Image

Right above the bay Monitor bay occupancy

Step 4

Step 1Step 2

Step 3

Installation Procedure

Page 18: Ppt 新

Installation Guideline

Status Light

detector

Wiring Interface

DIP Switch

Status LightRed Light: Red light indicates the working status of the power.Yellow Light:Yellow light will be on when the ground is not even

enough for the ultrasonic to detect. In this circumstance, thedetecting mode shall be switched to un-even mode . (Plsrefer to DIP switch manual);

Green Light: When an object is detected at a distance beyond 4 meters,Green light will be on. It’s used to test the detecting ability

of the ultrasonic sensor.Blue Light: Blue light indicates communication status. Every time when

the ultrasonic receive a command, the blue light blinks

Interface Terminal+: DC24V power input;GND:Power ground cable interface terminal;A:Connects to Data collector’s RS485 Can bus AB:Connects to Data collector’s RS485 Can bus B;GND:RS485 Can bus ground cable interface terminal;R: Red Light Power Outlet (5V Output);G: Green Light Power Outlet (5V Output);GND:Signal Light ground cable interface terminal;

Wiring and Status Light

Page 19: Ppt 新

Installation GuidelineSensor Configuration

DIP Switch DIP Address Switch and Detecting range Switch

Address SwitchAddress Switch(543210):It’s used to configure address of ultrasonic sensor

SW SwitchMode Switch(SW): It’s used to configured the status light

“2” SwitchMode Switch(SW):It’s used to configure detecting mode of the ultrasonic sensor.

6 7 1 0 Switch Configuration Detecting Distance (meter) Actual Installing Height (meter)

□□□□(0) 1(Reserved) 1.5~2

□□□■(1) 1.5 2~2.5

□□■□(2) 2 2.5~3

□□■■(3) 2.5 3~3.5

■■□□(4) 2.5 3~3.5

■■□■(5) 3 3.5~4

■■■□(6) 3.5 4~4.5

■■■■(7) 4(Reserved) 4.5~5

“6 7 1 0”Switch Configuration

Page 20: Ppt 新

Installation Guideline

Bay Indicator Installation Guidance

Installation Site Function Image

At the forefront of the bay Indicate space availability

Step 4

Installation Procudure

Step 1

Step 3

Step 2

Page 21: Ppt 新

Installation Guideline

Data Collector Installation Guidance

Installation Site Function Image

Nearby its correlated ultrasonic sensor (depend on actual circumstance)

Collects ultrasonic sensor signal and forward it to

centre processor

Wiring Procedure

Power Input Interface

RS485-(1)Interface

Indicating Light

RS485-(2)Interface

DIP Switch

Wiring Interface:Power Input Interface:DC Power input . Please make sure the polarity is not reversed.RS485-(2) Interface: This interface is connected to centre processor’s RS485-(1) interfaceRS485-(1) Interface: This interface is connected toRS485 Can bus.

Status Light:Red Light: It indicates the working status of power. Green Light: It indicates the communication status of RS485-(1).

Page 22: Ppt 新

Installation Guideline

Centre Processor Installation Guidance

Installation Site Function Image

Management Centre (control room) Act as the processing centre

of the whole system

Wiring Procedure

Power Input Interface

RS485-(1)Interface

Status Light

RS485-(2)Interface

Infrastructure

DIP Address

Power Input:DC Power. Make sure the polarity is not reversed. RS485-(2) Interface: This interface connects to the RS232-485 converter in the PC.RS485-(1) Interface: This interface connects to the RS485-(2) Can bus.

Status Light:Red Light: Red light is the Power Light that indicates the status of power. Green Light: Green light is the light that indicatesthe communication status of RS485-(1).

Serial Port Line

Page 23: Ppt 新

Installation Guideline

Internal LED Display

Installation Site Function Image

Shall be installed at the crossing or driveway of the

Parking Lot.

Display availability information and guide

drivers to available bays.

Installation Procedure

Page 24: Ppt 新

Installation Guideline

LED Display Wiring Guidance

Power Input Interface

RS485-(1)

Status Light

MHNS

Power Input Interface:DC5V input, please make sure the polarity is not reversed.RS485-(2) interface:SuspendedRS485-(1) Interface: Connect to data collector’s RS485 –(1) Can bus. MH:Connect to external LED displaysNS:Connect to internal LED displays

Status Light:Red Light: Red light is the Power Light that indicates the status of power. Green Light: Green light is the light that indicates.the communication status of RS485-(1).

Page 25: Ppt 新

Installation Guideline

Management Software Installation Requirement

Installation Enviroment Function Image

Software Enviroment:•CPU:Intel P above 1.8G•RAM:more than 1G(necessary)•hardware:more than 80G(recommended)• screen:17 inch LCD(necessary)•CD ROM(necessary)•USB connection(recommended)

•Operating system:Windows XP(necessary),•Connector:one piece of PCI bus cable RS232 COM (male)•surveillance software: Microsoft Office Access2003、Excel2003(necessary)

Timely display of parking status

Statistic FunctionPermissionRemotely monitor

and control the working status of each part of PGS

Repeatedly Development

For software installation, pls refer to software installation guidance.

Page 26: Ppt 新

Installation Guideline

Configuration Software

Installation Enviroment Function Image

•CPU:Intel P above 1.8G•RAM:more than 1G(necessary)•hardware:more than 80G(recommended)• screen:17 inch LCD(necessary)•CD ROM(necessary)•USB connection(recommended)

•Operating system:Windows XP(necessary),•Connector:one piece of PCI bus cable RS232 COM (male)•surveillance software: Microsoft Office Access2003、Excel2003(necessary)

This software is used to configure the LED message and data collector quantity. It can also be used to observe the system data, and to test system hardware (sensor, data collector, and LED display)

For software installation, pls refer to software installation guidance

Page 27: Ppt 新
Page 28: Ppt 新

Routine Maintenance

To make sure a health system, routine inspection is required.

1. Quarterly inspection--dust cleaning. Such maintenance can prevent the component frombeing damaged by static.

2. Monthly inspection—component inspection. a) According to the component manual, user shall inspect component parameter, cable condition (voltage, cable

temperature and aging state), power supply. b) Use management software to check the working status of the component. If any abnormal is found, pls send

the component back to us for further inspection. Our engineer will then provide a solution in case other component meets similar problems.

3. Monthly inspection to the PC is required to make sure a healthy enviroment for the management software --PC antivirus, PC system cleaning. Meanwhile, monthly data backup is also required.

Matters that need attentionExtra protections are also required, such as protection against moisture, corrosion, dust, interference and lightning.

Page 29: Ppt 新

Trouble Shooting

Quick solution for the sales agent and engineering company:

Check up the faulty component

Use the management software to check up the site of the faulty component.

Solutions

1. Edixeon engineer diagnose the problem via internet.

2. Replace the faulty component directly.

3. If problem can’t be solved by above measures, on-site assitance will be provided.

Page 30: Ppt 新
Page 31: Ppt 新

Execution Materials

Trunk Line Materials

Cable Tray 50mm*100mm KBG ¢25mm

Power cable and Data cable

RVVP 2*0.75mm RVV 2*1.0mmRVV 3*0.5mm RV 3*2.5mm

Page 32: Ppt 新

Execution Materials

Spare Parts

Watertight Cabinet 30cm*50cm Anti-creeping Switch 220V 10-40A

24V 20A and 24V 1A Power

Page 33: Ppt 新
Page 34: Ppt 新

Warranty and Service

“Strive to meet customer’s requirement; Answer prompt, Act prompt” Under the guidance of such service concept, we divide our service into three phases ----Pre-sale, in-sale and after-sale.

1.Pre-sale Service

Service Content --System Introduction and pre-installation technical guidance.

Service Mode --You can propose any questions to our customer service department, If necessary, on-site guidance would also be provided. (Any charges incurred shall be paid by customer)

2. Sales service

Service Content --Free on-line technical guidance for any on-going project. If needed, on-site assistance is available. (Any charges incurred shall be paid by customer)

Service Mode --Free training for products’ installation, setting-up, system operating will be provided. If you meet any technical problem in the construction, we can by email, telephone etc to provide guidance; if necessary, our engineer will be assigned to go to your place at very early time to offer our guidance.

Page 35: Ppt 新

Warranty and Service

3. After-sale ServiceService Content --Free on-line technical guidance for any products within or beyond warranty period. If

necessary, on-site guidance will also be provided (charges incurred shall be paid by customer).

Service Mode –

Technical Guidance

Free technical guidance for any products (within or beyond warranty) will be provided by means of email, telephone etc. If necessary, on-site guidance will be also provided.

Product Maintenance

Warranty period—Warranty period starts since the delivery date. Service within Warranty Period—If any component runs into faulty within warranty period, replacement of the component will be free.

Beyond warranty period—For component running into faulty beyond warranty period (or caused by incorrect installation within warranty period), we will charge the fee of the component replacement and labor cost.