9
PPPs in the road sector Anthony Pearce Honorary Director General

PPPs in the road sector · 2010-11-26 · Road PPPs • Road sector performance can be improved by PPPs: – by adopting a life cycle approach, – by introducing a service oriented

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PPPs in the road sector · 2010-11-26 · Road PPPs • Road sector performance can be improved by PPPs: – by adopting a life cycle approach, – by introducing a service oriented

PPPs in the road sector

Anthony PearceHonorary Director General

Page 2: PPPs in the road sector · 2010-11-26 · Road PPPs • Road sector performance can be improved by PPPs: – by adopting a life cycle approach, – by introducing a service oriented

PPPs in roads

• PPPs are an option for public authorities that want to change focus from provision of infrastructure to provision of service

• PPPs are not just about finance

• Private sector commitment to maintenance and quality

Page 3: PPPs in the road sector · 2010-11-26 · Road PPPs • Road sector performance can be improved by PPPs: – by adopting a life cycle approach, – by introducing a service oriented

Road PPPs

• Road sector performance can be improved by PPPs:– by adopting a life cycle approach,

Page 4: PPPs in the road sector · 2010-11-26 · Road PPPs • Road sector performance can be improved by PPPs: – by adopting a life cycle approach, – by introducing a service oriented

Road PPPs

• Road sector performance can be improved by PPPs:– by adopting a life cycle approach, – by introducing a service oriented approach; and – by introducing a watch-dog (e.g. the bank lending money

on the project) with a long term interest.

• PPPs are not just about concessions and tolls:– Concessions with shadow tolling– Long term maintenance contracts

Page 5: PPPs in the road sector · 2010-11-26 · Road PPPs • Road sector performance can be improved by PPPs: – by adopting a life cycle approach, – by introducing a service oriented

Concurrent engineering = significant time savings

Example: A28 Rouen-Alençon motorway – 128 km in 4 years

Page 6: PPPs in the road sector · 2010-11-26 · Road PPPs • Road sector performance can be improved by PPPs: – by adopting a life cycle approach, – by introducing a service oriented

Improved quality of service

Page 7: PPPs in the road sector · 2010-11-26 · Road PPPs • Road sector performance can be improved by PPPs: – by adopting a life cycle approach, – by introducing a service oriented

Rajasthan Megahighways• 50-50 joint venture between the State &

IFLS India• 1053 km of 5 different roads• Profitable and good quality

Before After

Page 8: PPPs in the road sector · 2010-11-26 · Road PPPs • Road sector performance can be improved by PPPs: – by adopting a life cycle approach, – by introducing a service oriented

IRF PPP Working Group

• Catalogue of cases • Knowledge base• “Beyond the financing

aspects”• Urban PPPs• Cairo meeting on PPPs